n the SohnCo Baby Products Division plant located in New Brunswick, NJ, one Baby Mobile is assembled from the following: A36 4 B22 2 C35 1 A B22 requires 1 C7 and a purchased D 19. All A parts are made in Department 2979, B parts are made in Department 4330, and C parts are made in department 2976. Lead times are set at one week. An A 36 requires 2.5 hours. A B22 requires 3 hours. All other parts require 0.5 hour per part of time. Develop a capacity load profile for this plant.
Permutations and Combinations
If there are 5 dishes, they can be relished in any order at a time. In permutation, it should be in a particular order. In combination, the order does not matter. Take 3 letters a, b, and c. The possible ways of pairing any two letters are ab, bc, ac, ba, cb and ca. It is in a particular order. So, this can be called the permutation of a, b, and c. But if the order does not matter then ab is the same as ba. Similarly, bc is the same as cb and ac is the same as ca. Here the list has ab, bc, and ac alone. This can be called the combination of a, b, and c.
Counting Theory
The fundamental counting principle is a rule that is used to count the total number of possible outcomes in a given situation.
In the SohnCo Baby Products Division plant located in New Brunswick, NJ, one Baby Mobile is assembled from the following:
A36 4
B22 2
C35 1
A B22 requires 1 C7 and a purchased D 19. All A parts are made in Department 2979, B parts are made in Department 4330, and C parts are made in department 2976. Lead times are set at one week. An A 36 requires 2.5 hours. A B22 requires 3 hours. All other parts require 0.5 hour per part of time. Develop a capacity load profile for this plant.
Trending now
This is a popular solution!
Step by step
Solved in 2 steps