Question
thumb_up100%
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution
Trending nowThis is a popular solution!
Step by stepSolved in 5 steps with 3 images
Knowledge Booster
Similar questions
- A 3.25-kg crate starting at rest slides down a rough 7.00-m-long ramp, inclined at 27.5° below the horizontal. The magnitude of the force of friction between the crate and the ramp is 9.00 N. (a) How much work is done on the crate by friction? (b) What is the change in potential energy of the crate in sliding down the ramp? (c) What is the speed of the crate at the bottom of the incline? m/s Need Help? Read Itarrow_forwardA object of mass 3.00 kg is subject to a force Fx that varies with position as in the figure below. (a) Find the work done by the force on the object as it moves from x = 0 to x = 5.00 m. (b) Find the work done by the force on the object as it moves from x = 5.00 m to x = 11.0 m. (c) Find the work done by the force on the object as it moves from x = 11.0 m to x = 17.0 m. (d) If the object has a speed of 0.400 m/s at x = 0, find its speed at x = 5.00 m and its speed at x = 17.0 m. speed at x = 5.00 m speed at x = 17.0 marrow_forwardA child exerts a horizontal 15 N force on a 10 kg box to push it 7 m across a floor that has a coefficient of kinetic friction of 0.1 with the box. (a) How much work does the child do on the box? (b) How much work does gravity do on the box? (c) How much work does the normal force do on the box? (d) How much work does the force of kinetic friction do on the box? (e) What is the total work done on the box? (f) How much kinetic energy has the box gained during this process? (g) If the box was initially at rest, then how fast is the box moving at the end of this process?arrow_forward
- A object of mass 3.00 kg is subject to a force Fx that varies with position as in the figure below. (a) Find the work done by the force on the object as it moves from x = 0 to x = 4.00 m. (b) Find the work done by the force on the object as it moves from x = 4.00 m to x = 10.0 m. (c) Find the work done by the force on the object as it moves from x = 10.0 m to x = 17.0 m.arrow_forwardThe force acting on a particle varies as in the figure below. (The x axis is marked in increments of 10.0 m.) F, (N) 6 4 2 0 A B C D E x (m) Find the work done by the force as the particle moves across the following distances. (a) from x = 0 m to x = 80.0 m (b) from x = 80.0 m to x = 120.0 m (c) from x = 0 m to x = 120.0 marrow_forwardPlease asaparrow_forward
- A force F = 20.0 Newtons at a 20.0 degree angle with the X axis. This force is applied over a distance of 20.0 meters along the X axis. What work is done by the Force?arrow_forwardYou push a stalled car with a constant force of 235 NN as it moves a distance 8.40 mm in a straight line. The amount of work that you do in this process is 1.47×103J1.47×103J. What is the angle between the direction of your push and the direction of the car's motion? Express your answer in degrees.arrow_forwardA shopper in a supermarket pushes a cart with a force of 33.0 N directed at an angle of 25.0° below the horizontal. The force is just sufficient to balance various friction forces, so the cart moves at constant speed. Find the work done by the shopper on the cart as she moves down a 54.2-m-long aisle. The shopper goes down the next aisle, pushing horizontally and maintaining the same speed as before. If the work done by frictional forces doesn't change, would the shopper's applied force be larger, smaller, or the same? What about the work done on the cart by the shopper? Is the work larger in part a, or is the work larger in part b; or is the work the same in both parts?arrow_forward
- A object of mass 3.00 kg is subject to a force Fx that varies with position as in the figure below. (a) Find the work done by the force on the object as it moves from x = 0 to x = 4.00 m. (b) Find the work done by the force on the object as it moves from x = 4.00 m to x = 11.0 m. (c) Find the work done by the force on the object as it moves from x = 11.0 mto x = 17.0 m. (d) If the object has a speed of 0.600 m/s at x = 0,find its speed at x = 4.00 m and its speed at x = 17.0 m. speed at x = 4.00 m m/s speed at x = 17.0 m m/sarrow_forwardFind the work (in J) done by the force F (6 N/m)yî + (27 N/m)xĵ between the points A = (0, 0) and B = (2 m, 2 m) over a circular arc of radius 2 m, centered at (0, 2 m). Evaluate the path integr %3D using Cartesian coordinates. (Hint: You will probably need to consult a table of integrals.) y(m)4 (2, 2) F(x, y) (0, 0) x(m)arrow_forwardA pail and its contents weigh 80 lbs. The pail is attached to the end of a 100 ft rope that weighs 10 lb and is hanging vertically. How much work is done in winding up the rope with the pail attached? For this problem, set up the appropriate integral(s), and evaluate the integral(s). The integral(s) can be evaluated by a calculator.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios