Given the mix design for a 20-liter batch of concrete: 20-liter Batch Materials W (dry), kg W(wet), kg Water 4.40 3.99 Cement 8.15 8.15 Gravel 21.76 22.20 Sand 11.07 11.84 Answer the following : (round-off volumes in cu.m. up to 4 decimal places, round-off the rest to 2 decimal places). a) If the density of fresh concrete is 2260 kg/cu.m., what is the yield for the 20-liter batch? cu.m. b) If the density of fresh concrete is 2260 kg/cu.m., what is the yield for the 1 cu.m. batch? cu.m. c) What should be the adjusted water (for the dry weights) due to the yield and if the measured slump is 40 mm short of the target slump? kg

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Answer please b and c
Given the mix design for a 20-liter batch of concrete:
20-liter Batch
Materials
W (dry), kg
W(wet), kg
Water
4.40
3.99
Cement
8.15
8.15
Gravel
21.76
22.20
Sand
11.07
11.84
Answer the following : (round-off volumes in cu.m. up to 4 decimal places, round-off the rest to 2 decimal places).
a) If the density of fresh concrete is 2260 kg/cu.m., what is the yield for the 20-liter batch?
cu.m.
b) If the density of fresh concrete is 2260 kg/cu.m., what is the yield for the 1 cu.m. batch?
cu.m.
c) What should be the adjusted water (for the dry weights) due to the yield and if the measured slump is 40 mm short of the target slump?
kg
Transcribed Image Text:Given the mix design for a 20-liter batch of concrete: 20-liter Batch Materials W (dry), kg W(wet), kg Water 4.40 3.99 Cement 8.15 8.15 Gravel 21.76 22.20 Sand 11.07 11.84 Answer the following : (round-off volumes in cu.m. up to 4 decimal places, round-off the rest to 2 decimal places). a) If the density of fresh concrete is 2260 kg/cu.m., what is the yield for the 20-liter batch? cu.m. b) If the density of fresh concrete is 2260 kg/cu.m., what is the yield for the 1 cu.m. batch? cu.m. c) What should be the adjusted water (for the dry weights) due to the yield and if the measured slump is 40 mm short of the target slump? kg
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Knowledge Booster
Transportation planning process
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning