Georgetown Metal Works produces two types of metal lamps. Georgetown manufactures 17,500 basic lamps and 6,160 designer lamps. Its activity-based costing system uses two indirect-c pools. One cost pool is for setup costs and the other for general manufacturing overhead. Georgetown allocates setup costs to the two lamps based on setup labour-hours and general manu overhead costs on the basis of direct manufacturing labour-hours. It provides the following budgeted cost information. (Click the icon to view the information.) Calculate the total budgeted costs of the basic and designer lamps using Georgetown'activity-based costing system. Begin by calculating the overhead rates for each of the two indirect-cost pools: setup costs and general manufacturing overhead. First select the formula; then enter the applicable amounts a calculate the rate. Begin with the overhead rate for set up costs. (Round the budgeted rate to the nearest dollar. Abbreviations used: MOH = Manufacturing Overhead.) Budgeted setup rate per setup labour-hour Information Direct materials per lamp Direct manufacturing labour-hours per lamp Direct manufacturing labour rate per hour Setup costs Lamps produced per batch Setup-hours per batch General manufacturing overhead costs $ 8 Basic Lamps Designer Lamps $ 14 Total 0.4 hours 0.5 hours $ 30 $ 30 $ 151,200 250 1 hour 40 2 hours $ 50,400 Print Done
Georgetown Metal Works produces two types of metal lamps. Georgetown manufactures 17,500 basic lamps and 6,160 designer lamps. Its activity-based costing system uses two indirect-c pools. One cost pool is for setup costs and the other for general manufacturing overhead. Georgetown allocates setup costs to the two lamps based on setup labour-hours and general manu overhead costs on the basis of direct manufacturing labour-hours. It provides the following budgeted cost information. (Click the icon to view the information.) Calculate the total budgeted costs of the basic and designer lamps using Georgetown'activity-based costing system. Begin by calculating the overhead rates for each of the two indirect-cost pools: setup costs and general manufacturing overhead. First select the formula; then enter the applicable amounts a calculate the rate. Begin with the overhead rate for set up costs. (Round the budgeted rate to the nearest dollar. Abbreviations used: MOH = Manufacturing Overhead.) Budgeted setup rate per setup labour-hour Information Direct materials per lamp Direct manufacturing labour-hours per lamp Direct manufacturing labour rate per hour Setup costs Lamps produced per batch Setup-hours per batch General manufacturing overhead costs $ 8 Basic Lamps Designer Lamps $ 14 Total 0.4 hours 0.5 hours $ 30 $ 30 $ 151,200 250 1 hour 40 2 hours $ 50,400 Print Done
Managerial Accounting
15th Edition
ISBN:9781337912020
Author:Carl Warren, Ph.d. Cma William B. Tayler
Publisher:Carl Warren, Ph.d. Cma William B. Tayler
Chapter4: Activity-based Costing
Section: Chapter Questions
Problem 3E: Scrumptious Snacks Inc. manufactures three types of snack foods: tortilla chips, potato chips, and...
Related questions
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 3 steps
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, accounting and related others by exploring similar questions and additional content below.Recommended textbooks for you
Managerial Accounting
Accounting
ISBN:
9781337912020
Author:
Carl Warren, Ph.d. Cma William B. Tayler
Publisher:
South-Western College Pub
Managerial Accounting
Accounting
ISBN:
9781337912020
Author:
Carl Warren, Ph.d. Cma William B. Tayler
Publisher:
South-Western College Pub