Determine the vertical clearance at the left ve in meters.
Q: Determine the components of the P kN force. The components must parallel and perpendicular to the…
A: Given P = 10KN Angle of force = 20⁰
Q: Water is flowing at velocity of 0.8m/s in a pipeline (diameter = 1.25 inch). Its initial pressure is…
A:
Q: A tension plate shown below is used to support suspended load "T". Gusset Plate Fy = 248 MPa Fu =…
A:
Q: The state transportation agency has established crash reduction factors shown in the table. An…
A: Given Data - To Find - (a) The appropriate countermeasures. (b) The expected reduction in crashes…
Q: Write the equations for moment as a function of distance x along the longitudinal axis of the beam…
A:
Q: Water is flowing at velocity of 0.8m/s in a pipeline (diameter = 1.25 inch). Its initial pressure is…
A: step 1-
Q: Just after the fan is turned on, the motor gives the blade an angular acceleration a = (20e-0.6t)…
A:
Q: The uniform I-beam has a mass of 54 kg per meter of its length. Determine the tension in the two…
A: Determine the tension in the two supporting cables and the reaction at D..
Q: A steel block is axially loaded with P = 10 kN as shown in the figure with length equal to 3m and…
A:
Q: A Plane Truss Is Loaded As Shown In The Figure. A.)Which Of The Following Most Nearly Gives The…
A: A plane truss is given in the question we need to find out the following A.)Which Of The Following…
Q: In Figure 6 is shown a siphon discharging water from reservoir A into the air at B. Distance 'a' is…
A:
Q: Determine the flow in a trapezoidal irrigation canal with a bottom width of 6.6ft. and a side slope…
A: Given: The bottom width is 6.6 ft or 2 m. The side slope is 1V:2H. The depth is 1.5 m. The…
Q: Problem 4 Design of Flexural Members A W 16 x 26 is used for beam AB as shown in the figure. Service…
A: Solution- Length (L)=9mConsider steel be A992fy=345MPaFallow=0.9×345=310.5MPaShear strength =0.58…
Q: Design a concrete lined channel to carry a discharge of 350 cumecs at a slope of 1 in 6400. The side…
A:
Q: 1. A large tank contains a layer of oil floating on water as shown in the figure below. The flow is…
A: Given data Specific gravity of oil = 0.8 Density of water = 1000 Pa Acceleration due to gravity =…
Q: In a sudden enlargement of a pipe cross-section, if the velocity of flow at the inlet of pipe (V1) =…
A: Given data: The velocity at inlet of pipe V1=40 m/s The velocity at outlet of pipe V2=20 m/s The…
Q: Q 2: Calculate the (We) and permeability (k), where the data are available: Pi=2500 psi P-2460 psi…
A: Given, Pi = 2500 psi P' = 2460 psi K' = 1200 bbl/month/psi radius of aquifer r0 = 15750 ft radius of…
Q: Determine Deflection caused by unit force applied in the direction of unknown is also determined…
A:
Q: Solve for all bar forces
A: Find support reactions Sin θ = 4/5 Cos θ =3/5 ΣFy = 0 (10 ×45) +VA + VP = 10 Sin 200 + 10+10+10 VA…
Q: An airplane whose absolute ceiling is 14,200ft climbs at 650 ft/min at sea level. How long will it…
A: Given, Airplane's absolute ceiling=14,200 ft It climbs at 650 ft/min at sea level So,…
Q: The 6-cm-diameter 20°C water jet in Fig. P3.64 strikes a plate containing a hole of 4-cm diameter.…
A: step 1-
Q: JUII Vertical back and retained sand as a backfill that is submerged. The sand has Ysat = 20 kN/m…
A: This question is related to the Earth pressure on retaining wall from Soil Mechanics.
Q: A 100 x 100 mm in cross- section and 400 mm long is lbaded to failure by either a con centrated two…
A: Solution: Given: Beam dimension = 100 x 100 x 400 mm Find Compressive strength: Note: concentrated…
Q: Problem 3 Design of Tension Members A double channel shape is used as 75 a tension member. The…
A: Th given data is: A=3555mm2 tw=12.18mm U=0.90 Bolt diameter do=22mm fy for channel=345Mpa fu for…
Q: The tangents of a sag curve connects at the point of intersection having Station 18+407.60 and…
A: 1. Given : At point of intersection (PI) ⇒ Station = 18 + 407.60…
Q: Write the equations for moment as a function of distance x along the longitudinal axis of the beam…
A:
Q: H.W A triangular open channeL wi th (o.25.) depth and 60 angle conveys water. i fthe bed slope is…
A: Chezy's equation : Chezy's formula explains the mean flow velocity of turbulent open channel flow in…
Q: Problem. On one side of the gate, water stands level with the top of a vertical rectangular gate 4…
A: solution Given height of plate h=6feet and width of the plate b=4feetahydrostatic force on lest side…
Q: A curve having tangents of UV and VW intersects at point V. UV and VW has an azimuth (from south) of…
A: Solution Deflection Angle, I = 2150 - 1650 = 500
Q: Determine the hydraulic radius Wetted area=18 m2 Wetted perimeter=15 m
A: The given question is related with fluid mechanics . In this question we are provided with value of…
Q: Problem #3 lo lag An eccentrically loaded continuous foundation is shown in (Eccentricity in one…
A:
Q: H / The beam shown below has across seclion of channel Shape with widhth 360mm and haghs h= loomm,…
A: Web thickness = 14mm Width of the beam = 360mm Height of the section = 100mm Unifrom loading =…
Q: A spherical shell made of a material with a density of 1600 kg/m3 is placed in water. If the inner…
A:
Q: Use the bisection A beam is loaded as shown in Fig menod to solve for the positon Inside the bram…
A:
Q: Given the Frame as shown below. Using Method of Members, determine the following: a.) The External…
A:
Q: A prestressed beam has a width of 300 mm and depth of 600 mm. It is subjected to a bonded prestress…
A: Given Data: The width of the prestressed beam is b=300 mm. The depth of a prestressed beam is d=600…
Q: Q3: Q3/ A 300x500 mm column as shown in the figure below. If P= 1200 kN, M,=1800 kN.m and f =28 MPa.…
A:
Q: On the upstream side of a hydraulic jump, the Froude number and the depth of flow are 12 and 0.5 m,…
A: Given data : The depth of flow on upstream side Y1=0.5 m The value of Froude number on upstream side…
Q: A rectangular concrete beam having width of 250 mm and effective depth of 350, will be designed to…
A: Given data, b=250 mm d=350 mm fy=275 MPa fck=20.7 MPa d'=60 mm xu,maxd=0.53 1)Maximum moment applied…
Q: Foundation – A03 Design a combined footing to support the exterior column having a dimension of 400…
A: Solution: Given: Loads Dead loads = 630+770 =1400 kN Live loads = 420+ 510=930kN Self wt of…
Q: Problem 2 Design of Shear Members A cantilever beam has a span of 3 m. The beam carries a uniform…
A:
Q: M MEQ2 jpg 200mmø 690mm 300 mm 400 mmø Tit H20 LHg (13.6) A 200mm diameter venturi meter is…
A:
Q: Convert the following moisture content as indicated. Show your solutions. 18% wb to MCdb 26% wb to…
A:
Q: A stepped shaft ACB having solid circular cross sections with two different diameters is held…
A:
Q: Write the equations for moment as a function of distance x along the longitudinal axis of the beam…
A:
Q: Sieve No. Opening (mm) Mas Retained (grams) 4 4.75 0.0 10 2.00 21.6 20 0.85 49.5 40 0.425 102.6 89.1…
A: To Determine Plot particle size distribution curve D10 D30 D60 Cu Cc
Q: Provide the correct points, draw the figure below using Absolute, Relative and Polar coordinate…
A: Given figure ,
Q: The following interior angles of a triangle traverse were measured with the same precision. STATION…
A:
Q: An irregular container, closed at the end, is filled with water (999 kg/m3). Consider the opening…
A:
Q: Water flows through an orifice at the vertical side of a closed cylindrical tank. The water level…
A:
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 1 images
- A-2.4% grade meets a +7.4% grade at a vertex (El. 142.68m) directly under an overpass bridge having underside elevation of 156.98 m. A 7.9 meters clearance under the bridge and the center of the curve was observed. Determine the vertical clearance at the left edge of a 15.3 meters bridge from the curve in meters.An underpass crossing a reinforced concrete bridge along the Shaw Blvd. has downward grade of -4% meeting an upward grade of +8% at the vertex (elev. 170 m) at Sta 7 + 700, exactly underneath the center of the bridge having a width of 10 m. The required minimum clearance under the bridge is 5 m and the elevation of the bottom of the bridge is 178.1. Determine the following: a. length of the parabolic curve that shall connect the two tangents b. the stationing where a catch basin will be placed c. the elevation where a catch basin will be placed G&I: PVC Reg'd: L₁ 4/2 9₁ = -40% sta m, 5n 5m H 5m el. m AV PVI sta 7+700 ½/₂ el. 178.1 92=8% PVT el. 170mA -4.1% grade meets a 8.7% grade at a vertex (El. 144.78m) directly under an overpass bridge having underside elevation of 150.83m. A 5.6 meters clearance under the bridge and the center of the curve was observed. A horizontally inclined water pipe will be installed throughout the curve. The pipe has an outside diameter of 1.3 meters and a thickness of 50.7mm. What is the total length of the pipe in meters if the bridge above the curve is having a width of 14.3 meters
- A-3.3% grade meets a +7.4% grade at a vertex (El. 139.57m) directly under an overpass bridge having underside elevation of 150.31 m. A 6.5 meters clearance under the bridge and the center of the curve was observed. Determine the vertical clearance at the right edge of a 13.1 meters bridge from the curve in meters. ASAP!A-3.2% grade meets a +8.5% grade at a vertex (El. 138.73m) directly under an overpass bridge having underside elevation of 153.30 m. A 6.3 meters clearance under the bridge and the center of the curve was observed. Determine the vertical clearance at the right edge of a 11.5 meters bridge from the curve in meters.4. An underpass crossing a reinforced concrete bridge along C. Gantuangco Avenue has a downward grade of -4% meeting an upward grade of +8% at the vertex V (elevation 70m) at station 7+700, exactly underneath the centerline of the bridge having a width of 10m. If the required minimum clearance under the bridge is 5m and the elevation of the bottom of the bridge is 78.10m, determine the length of the parabolic curve that shall connect the two tangents.
- A-4.4% grade meets a 8.1% grade at a vertex (El. 135.82m) directly under an overpass bridge having underside elevation of 154.31m. A 5.72 meters clearance under the bridge and the center of the curve was observed. A water pipe will be installed throughout the curve. The pipe has an outside diameter of 0.9 meters and a thickness of 54.8mm. The top of the inlet and the outlet portion of the water pipe are 5.29 meters and 4.09 meters below the surface of the pavement, respectively. What is the total cost of the pipe in pesos if the bridge above the curve is having a width of 15.7 meters. Consider that the inlet is at the beginning of the curve and the outlet is at the end. The following are the cost index and specification: Type of Pipe = Reinforced Concrete Pipes Unit Cost = Php 4,785.93 per meterA-4.5% grade meets a 7.4% grade at a vertex (El. 143.24m) directly under an overpass bridge having underside elevation of 157.26m. A 6.8 meters clearance under the bridge and the center of the curve was observed. Determine the elevation of the invert on center when its location from PC is 75.2m. The pipe has an outside diameter of 1.2 meters and a thickness of 55.4mm. The backfill is 0.9 meters in depth. The bridge is having a width of 16.6 meters.A-4.4% grade meets a 7.9% grade at a vertex (El. 136.35m) directly under an overpass bridge having underside elevation of 156.79m. A 7.8 meters clearance under the bridge and the center of the curve was observed. Determine the elevation of the invert on center when its location from PC is 91.6m. The pipe has an outside diameter of 0.7 meters and a thickness of 59.8mm. The backfill is 0.7 meters in depth. The bridge is having a width of 14.6 meters. asap 30 mins, draw curve and detailed solution
- A-4.4% grade meets a 7.9% grade at a vertex (El. 136.35m) directly under an overpass bridge having underside elevation of 156.79m. A 7.8 meters clearance under the bridge and the center of the curve was observed. Determine the elevation of the invert on center when its location from PC is 91.6m. The pipe has an outside diameter of 0.7 meters and a thickness of 59.8mm. The backfill is 0.7 meters in depth. The bridge is having a width of 14.6 meters. Show solution and Plot.An underpass crossing a reinforced concrete bridge along the Shaw Blvd has a downward grade of 6% meeting an upward grade of 9% at the vertex V at elevation 70m and stationing of 7 + 770 exactly underneath the centerline of the bridge having a width of 10m. If the required minimum clearance under the bridge is 6m and the elevation of the bottom of the bridge is 88.88m. Determine the length of the vertical parabolic curve that shall connect the two tangents. determine the length of the vertical parabolic curve that shall connect the two tangents determine the stationing of the point where the catch basin will be placed.\ determine the elevation of teh point where a catch basin will be placedA -3% grade meets a +5% grade at a vertex (El. 146.24m) directly under an overpass bridge having underside elevation of 155.74m. A 5 meters clearance under the bridge and the center of the curve was observed. The bridge is having a width of 12 meters. Determine the elevation of the invert on center when its location from PC is 75m. The pipe has an outside diameter of 0.4 meters and a thickness of 50mm. The backfill is 0.30 meters in depth.