Costs that include items that cannot be readily charged to any one project, but represent the cost of operating the construction company are known as overhead: QUESTION 23 O a. Field O b. Home office OC. project O d. All of the above
Q: PROBLEM 1. A tension member consists of a 9 by 1/2 in. A242 Gr50 steel plate connected to a gusset…
A: Answer We are given Plate 9 x 1/2 in A 242 grade 50 steel plate Effective Net area (Ae) = Net…
Q: A compound channel is designed with a semi-circular and a rectangular channel attached to it.…
A:
Q: 10-6. A law enforcement officer has taken the following readings with her sound level meter. Is the…
A: given readings A. =80 dB B= 84 dB c=90 dB
Q: A beam ISLB 350, 8 m span, carries a total uniformly distributed load of 280 kN. It is supported on…
A:
Q: A man weighing 75 kg passes over a simply supported plank 3 m span. Compute the maximum bending…
A: To Find :- maximum bending moment in the beam
Q: A trapezoidal plate shown in the figure is submerged in water is 3.4 m below the surface. The bases…
A:
Q: torrsa and the local gravity is 978.892 cm/s". Determine the (a) density, (b) specific gravit and,…
A: Manometer: - It is an instrument by which one can find fluid pressure.
Q: On a hot, sunny day, a 30 – meter chain is used to measure the distance between two highway…
A:
Q: In a 200-hectare corn project, the field has to be tilled in 30 days. What size of heavyduty…
A: Given, Area A=200 hectare Tilling period = 30 days Speed =5 kph Field efficiency=75% Operating time…
Q: The rectangular bin with an inclined gate AB is filled with oil to the depth shown. Determine the…
A:
Q: AT- shape section composed of two 12 mm by 24 rectangles. What is the section modulus of the…
A: Calculate section modulus,Z=?
Q: Find roller support reaction
A: The given question is related with solid mechanics . In this question we are provided with different…
Q: The light rigid bar ABCD shown Is pinned at C and connected to two vertical rods. The bar was…
A:
Q: An aluminum block show in Figure 9 is subjected to uniform pressure on all faces. If the chang ein…
A:
Q: PROBLEM 2 COMPUTE THE SUPPORT REACTIONS FOR THE FOLLOWING FRAME USING THE FLEXIBILITY METHOD. SELECT…
A: The flexibility method : The flexibility technique, also known as the method of consistent…
Q: From boat sailing due North of 16.5 kph, a wreck ship k and an observation tower T are observed in a…
A: Using principles of trigonometric surveying. The distance can be calculated.
Q: Determine the Hydraulic radius if area oc channel is 20 m2 and wetted perimeter is 14 m
A: Hydraulic radius is defined as the ratio of the wetted cross-sectional area of the channel to the…
Q: Under the corner at point C Under the center D. If another footing of size 3 x 1 m with a total load…
A:
Q: 10-14. The following noise record was obtained in the front yard of a home. Is this a relatively…
A:
Q: Dr Nu Assignments 30 3- The following Figure shows an irregular area drawn on a plan on a plan to a…
A:
Q: A solid cylinder of 3 metres diameter has a height of 3 metres. It is made up of a material whose…
A:
Q: Find the area of a piece of land with an irregular boundary as follows: STA. Offset Distance (m) 0 +…
A:
Q: Q\Determination of liquid levels in industrial strong tanks using police radar?
A: Radar : Radar is a radio-wave-based detecting technology that determines the distance, angle, and…
Q: The isosceles triangle gate shown in the figure is hinged at A and filled with water. What is the…
A:
Q: 4. For the beam and loading shown, determine the tension in the cable and the support reactions at…
A:
Q: A man weighing 70 kg passes over a simply supported plank 2.5 m span. Compute the maximum bending…
A:
Q: A compound shaft consists of two pipe segments. Segment (1) has an outside diameter of 200 mm, a…
A: Given data in question Torque Length Diameter Thickness Rigidity modulus To find out Maximum…
Q: A. In the transit business, a rule of thumb suggests that for every 1% rise in fares, ridership will…
A: Fare1 = 7 Fare2 = 9 Ridership1 = 3500 Let ridership2 be x
Q: A vertical rectangular gate 1.8 m wide and 4.2 m high is submerged in oil (SG=0.88) with its top…
A:
Q: Loaded as shown, the beam rest in the inclined smooth surface at A and supported by a hinge at B.…
A: Based on the given beam loading and support let us draw the free body diagram showing all the forces…
Q: The isosceles triangle gate shown in the figure is hinged at A and filled with oil (SG-0.8). What is…
A:
Q: he loads act at an eccentrici
A:
Q: 4. Determine the maximum shear and maximum moment of the beam loaded as shown. Use the area method…
A:
Q: A compound shaft consists of two pipe segments. Segment (1) has an outside diameter of 200 mm, a…
A: Given data in question Torque Length Diameter Thickness Modulus of rigidity To find out Maximum…
Q: The 80-kg crate is subjected to the forces shown. If it is originally at rest, determine the…
A:
Q: 2. Find the moments of inertia about the coordinate axes of a thin rectangular plate of constant…
A: step 1-
Q: A rectangular sedimentation tank has dimensional proportions of 10:1:3 (L:W:H). If sedimentation is…
A:
Q: A smooth vertical wall 4 m retains cohesive soil backfill with c= 10 kN/m?. $ = 0 and y = 18 kN/m2.…
A:
Q: The boom ABC in Fig. 4 is held by the ball and socket joint at A and the two cables EBF and CD, as…
A:
Q: Find the force pneed to fill the gap. Young's modulus as 300 GPa. C 1.5 ст2 2 cm2 A 1 cm 1/2 p 05 m…
A: P is the force which is required to fill 0.5mm gap.
Q: Given data : Friction force%=120 N Normal force%-200 N Find coefficient of friction
A:
Q: A vertical summit curve has its highest point of the curve at a distance of 48 m. from the P.T. The…
A: Appreciate if there is detailed work with explanation and finds you helpful for ease of…
Q: A vertical curve has its highest point at a distance 48 meters from point PT. The curve is having…
A:
Q: A compound shaft consists of two pipe segments. Segment (1) has an outside diameter of 200 mm, a…
A:
Q: A man weighing 70 kg passes over a simply supported plank 2.5 m span. Compute the maximum bending…
A: Given data Weighing of man(M ) = 70 kg Then W =M*g = 70 * 9.81 = 686.7 N Span of simply…
Q: Use Simpson's 1/3 Rule to approximate the given integral with the specified value of 4 dx n = 10…
A:
Q: In an undamped free vibration of single degree of freedom, the initial displacement and velocity are…
A: Given- Undamped free vibrationSingle degree of freedomInitial displacement y=0.01 mvelocity v=0.50…
Q: g a distance to the
A:
Q: a.) Determine the average flow or arrival rate b.) Determine the probability that one, two, three,…
A:
Q: A trapezoidal channel having a bed slope of (1 to 750) carries discharge of 10 m3/sec. find the…
A:
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 2 images
- If you were bidding on a project in your own town, which of the following activities are not important when preparing the estimate: O a. Your commute time to the office O b. Bid our sub-contractor work OC. Visit the project site Od. Considering contingencyQuestion 51 During the stage, retainage money will start to be returned to the contractors. O planning and contract O mobilization and startup O steady velocity O drawdown and closeout O amazonA construction contract is an agreement between two or more parties to execute the construction works as per certain terms and conditions. a) Traditional Lump-Sum and Design and Built are the two most used project delivery methods in Malaysia for housing projects. Compare the delivery methods in the following aspect. i. Involvement of contractor in the design stage ii. Flexibility of change during the construction stage Project duration iii. iv. Organization structure
- 1. True or False? A payment bond provides the construction contractor a guarantee that they will receive timely payment for properly completed work 2. True or False? The terms price and cost are the same thing as it applies to a construction estimate. 3. From the following list, which item is least governing when interpreting a contract requirement?a. The Contract Agreementb. Amendments to the Contract Agreementc. Section view drawingsd. SpecificationsClassify the under listed instances into the appropriate types of contracts. a. A standard form of construction contract issued by the International Federation of Consulting Engineer (FIDIC). b. A verbal promise to buy a 25-year son a car. c. A written promise to buy a 30-year-old daughter a house. The promise has been written and signed and sealed and delivered to the daughter. d. The supply by a wholesaler of 10,000 bricks to site following a telephone request from the site agent.General Contractors working an a project that requires several months to complete typically request payment from the Owner on a monthly basis. They submit what is referred to as a Pay Application. What do GC's typically ask for payment of? Group of answer choices A)Ordered materials and equipment B)Installed materials and equipment C)Materials and equipment stored on site D)A & B only E)A & C only F)B & C only G)All of the above
- Part 2- Estimate Build Costs The land you are planning to buy for the brewery is for sale for $100,000. You are planning on contracting out the parts of the job yourself. From the various specialties you receive the following cost ranges: Specialty Optimistic Cost Most Likely Cost Pessimistic Cost Site Preparation & Foundation $15000 22500 31000 Structure 400000 525000 600000 Utilities 30000 37000 40000 Equipment Install 150000 200000 275000 Finishing 50000 70000 100000 Using three-point estimation, determine the cost estimate to build the brewery. Note:- Do not provide handwritten solution. Maintain accuracy and quality in your answer. Take care of plagiarism. Answer completely. You will get up vote for sure.Who is responsible for contracting for subcontractor services for construction on a project? a. The owner b. The architect c. The engineer d. The constructor e. All of the above247. To determine a subcontractor's probable financial stability, which of the following would be the most relevant area for inquiry? A. Bonding rate and capacity. B. Cost of general liability insurance. C. Experience of their project managers. D. History of completed projects. 248. The most effective procurement system includes which of the following? A. Submittal log maintained weekly. B. Management system which tracks the number of submittals still outstanding. C. Log system which tracks how long the design team takes to review each submittal. D. Log which maintains fabrication, estimated and actual delivery, and installation dates. 249. Which stage of the management process has the greatest impact on the success of a project? A. Staffing. B. Planning. C. Monitoring. D. Implementing.
- If the specifications are silent on the subject, but a contractor asks you, as the Resident Project Representative or inspector, how to perform the work, which of the following is the recommended procedure? a. Be ready to help by telling the contractor your opinions,because as a member of the construction team,it is your responsibility. b. Politely decline because construction means andmethods are the sole prerogative of the contractor.c. Direct the contractor how to perform the workbecause you know that if the contractor asked you,it meant that he or she did not know how to execute the work, and the project may otherwise suffer delays or failures.7. When a project is performed under contract, the SOW (Statement of Work) is provided by which of the following? A. The project sponsor B. The project manager C. The contractor D. The buyer/owner 8. Projects are initiated in response of: A. Stakeholder's pressure B. Business needs C. Technological obsolescence D. All of the above 9. The scope statement provides all of the following EXCEPT: A. A list of assumptions B. How changes will be monitored and controlled C. Process and criteria for D. A baseline to assist in evaluating potential scope changes acceptance 10. The work breakdown structure is a deliverable-oriented grouping of project elements (products or services) which defines, or provides a structure for defining the: A. Project staffing, skill requirements, scope definition B. Work packages, control accounts, schedules C. Project change control, risk identification, labor rates D. Project charter, project planDetermine the % of risk that has been transferred to sub-contractors given the following information: Materials = $150,000 Labor = $158,000 Equipment = $22,000 Bonded Sub-contracts = $400,000 Other Sub-contracts = 100,000 Overhead = 70,000 a. Risk cannot be transferred or mitigated 40% 50% 60% b. C. d.