Consider the following tasks that must be assigned to four workers on a conveyor-paced assembly line (i.e., a machine-paced line flow). Each worker must perform at least one task. There exists unlimited demand unless stated otherwise.
Time to Complete Task (seconds):
Task 1: 30
Task 2: 25
Task 3: 15
Task 4: 20
Task 5: 15
Task 6: 20
Task 7: 50
Task 8: 15
Task 9: 20
Task 10: 25
Task 11: 15
Task 12: 20
The current conveyor-paced assembly-line configuration assigns the workers in the following way:
• Worker 1: Tasks 1, 2, 3
• Worker 2: Tasks 4, 5, 6
• Worker 3: Tasks 7, 8, 9
• Worker 4: Tasks 10, 11, 12
Assume a demand rate of 20 units per minute. What would be the takt time of the process (in seconds per unit)?
Trending nowThis is a popular solution!
Step by stepSolved in 2 steps with 2 images
- □ Andry produces all-natural tote bags. She currently hires 20 workers who produce 240 bags a day. If she hires another worker, the worker's marginal product will be 33 tote bags a day. What would be the average product per day of 21 workers? Selected answer will be automatically saved. For keyboard navigation, press up/down arrow keys to select an answer. a b C Question 33 d 33 tote bags 1.6 tote bags 13 tote bags 273 tote bagsarrow_forwardPlease complete this tablearrow_forwardAplia Homework: Production and Cost in the Firm Underground Sandwiches, a sandwich shop, has the following marginal product curve (labeled MP) for its hourly production. (?) 20 18 16 MP LABOR (Workers) When labor increases from two to three workers, total product increases by per hour. Use the orange points (square symbol) to plot the production function on the following graph. Assume that if there are no workers, Underground Sandwiches does not have any output. Note: Plot your points in the order in which you would like them connected. Line segments will connect the points automatically. 80 72 Production Function 64 56 48 32 24 16 MARGINAL PRODUCT (Sandwiches per worker)arrow_forward
- Can you assist in filling out this chart?arrow_forward2. With reference to Example 9.5.1, let R(Q) = 80Q and C(Q) = Q2 + 10Q + 900. The firm can produce at most 50 units. (a) Draw the graphs of R and C in the same coordinate system. (b) Answer the following questions both graphically and by computation: (i) How many units must be produced for the firm to make a profit? (ii) How many units must be produced for the firm to maximize profits?arrow_forwardExperiment with manipulating the shape of the line given on the following graph by selecting and dragging each endpoint.arrow_forward
- oboard S Font Paragraph S Sensitivity Styles Editing Voice A Cobb-Douglas production function for new company is given by FF(KK, LL) = KK3/5LL2/5 where K represents the units of capital and L represents the units of labor. Suppose units of labor and capital cost $200 and $100 each respectively. If the budget constraint is $30,000, find the maximum production level for this company. VAAAWMMAA AAAAAAAAA SAAAAAAAarrow_forwardExercise 5.C.1: Prove that, in general, if the production set Y exhibits nondecreasing returns to scale, then either n(p) SO or n(p) = +0. Lan frntnedar conditionsarrow_forwardIsoquant curves Gym requires exactly 3 bottles of water per athlete to maximise performance (athletes on horizontal) What is the shape is the isoquant curve? Find slope of cuve at: (20,15) (5,25) (5,15)arrow_forward
- Cigarland is a Latin American country producing cigars. If the unit cost is 11 dollars and firms' mark up is 20 per cent, calculate the price of each cigar. Answer the question by providing just the appropriate number of dollars in the box below to one decimal place (eg 12.3). Do not enter a comma, space, letters, words or symbols (such as $). Failure to follow these instructions may result in your answer being marked as incorrect. Next page > < Previous pagearrow_forwardConsider an airline's decision about whether to cancel a particular flight that hasn't sold out. The following table provides data on the total cost of operating a 100-seat plane for various numbers of passengers. Total Cost Number of Passengers (Dollars per flight) 40,000 10 60,000 20 65,000 30 68,000 40 70,000 50 71,000 60 72,500 70 73,500 80 74,000 90 74,300 100 74,500 Given the information presented in the previous table, the fixed cost to operate this flight is s At each ticket price, a different number of consumers will be willing to purchase tickets for this flight. Assume that the price of a flight is fixed for the duration of ticket sales. Use the previous table as well as the following demand schedule to complete the questions that follow. Price Quantity Demanded (Dollars per ticket) (Tickets per flight) 1,000 700 30 400 90 200 100arrow_forwardLabor Total Production Marginal Production Average Production 0 0 2 30 4 10 6 20 8 200 10 25 In the above table, the marginal production and the average production of the 7th and 8th workers (the values in the row for the 8th worker) are, respectively: Group of answer choices 80; 25 20; 25 80; 100 25; 25 40; 25 25; 200arrow_forward
- Principles of Economics (12th Edition)EconomicsISBN:9780134078779Author:Karl E. Case, Ray C. Fair, Sharon E. OsterPublisher:PEARSONEngineering Economy (17th Edition)EconomicsISBN:9780134870069Author:William G. Sullivan, Elin M. Wicks, C. Patrick KoellingPublisher:PEARSON
- Principles of Economics (MindTap Course List)EconomicsISBN:9781305585126Author:N. Gregory MankiwPublisher:Cengage LearningManagerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage LearningManagerial Economics & Business Strategy (Mcgraw-...EconomicsISBN:9781259290619Author:Michael Baye, Jeff PrincePublisher:McGraw-Hill Education