Consider a two-station production line. Station 1 consists of a single machine with an average processing times of 1 hours per job, while Station 2 have two parallel machines which are identical with average processing times of 2 hours per job. What are the rate of the bottleneck and average raw process time for this line?
-
- rb = 1 parts/hour; To=2 hours.
- rb = 1 parts/hour; To=3 hours.
- rb = 0.5 parts/hour; To=2 hours.
- rb = 0.5 parts/hour; To=3 hours.
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution
Trending nowThis is a popular solution!
Step by stepSolved in 2 steps with 2 images
Knowledge Booster
Similar questions
- A machine makes two components; call them types A and B. It takes 630 seconds to switch production between the component types. During that time, no production occurs. When in production, each unit of A or B requires 0.5 second to be completed. The two components, A and B, are combined in an assembly process to make a final product; call it C. The assembly step can combine the two components into 1 unit every 4 seconds, or 15 units per minute. Suppose the machine rotates between one batch of 2,520 units of A and 2,520 units of B. In that case, what is the capacity of the machine in component pairs per minute, where a component pair is one unit of A and one unit of B? Suppose the machine rotates between one batch of 2,520 units of A and 2,520 units of B. What is the utilization of the machine? Suppose the machine rotates between one batch of 2,520 units of A and 2,520 units of B. What is the average inventory of B components? If the production schedule could be adjusted with…arrow_forwardIn a multi-station serial process system, the capacity of the system is the equal to the capacity of the station that has the highest capacity among all stations. True Falsearrow_forwardThese four phases make up a machine cycle, which is also known as a process loop. What percentage of a machine's cycle time do you value the most? Should I be concerned about replacing parts of the machine cycle when they wear out? Is the problem of switching modules improved by adding a second module?arrow_forward
- Drivers are trained in a process with two resources. The processing times for the resources are 32 and 140 hours. The first resource has 1 worker and the second resource has 5 workers. Demand occurs at the rate 0.025 Drivers per hour. Instruction: Round your answer to one decimal place. What is the implied utilization (%) of the second resource? %arrow_forwardA product requires four parts that are made on the same lathe. Call the parts A, B, C,and D. The product requires 1 unit of A, 2 of B, 4 of C, and 8 of D. Which of the following production cycles is most appropriate?a. A: 100, B: 100, C: 100, D: 100 c. A: 100, B: 150, C: 200, D: 400b. A: 101, B: 102, C: 104, D: 108 d. A: 100, B: 200, C: 400, D: 800arrow_forwardThese four steps make up what is called a machine cycle but is more often known as a process loop. When it comes to machine cycles, what factors do most people prioritise? Should I be concerned that I may have to replace machine cycle parts when they wear out? Is it feasible that doubling the number of modules available would make toggling between them easier?arrow_forward
- Nonearrow_forwardThe bottleneck resource in a process has the least idle time. True or false?a. Trueb. Falsearrow_forwardDreamInflate is a balloon manufacturing company. Balloon manufacturing consists of seven work stations, each performing a single step as indicated in the table below. There are five workers manned for the seven work stations as shown. Assume the workers are paid $15 per Worker Task Sequence Processing Time (secs/balloon) Task Dye production Electrocharging Dipping (Cold and Hot) Mortar Dipping Balloon inflation and delaltexing Vulcanization Inspection/Testing 1 30 w1 20 3 35 W2 25 W3 30 W4 6. 45 W5 7 40 hour. Each balloon pack is sold for $6 and has a variable cost of $1. The company has fixed costs of $200 per hour. There is more demand than the overall production system can provide. Based on the information provided, answer the following questions: • What is the cost of direct labor for balloons? • How much profit does DreamInflate make every hour? (note that the cost of direct labor is also a variable cost). What would the profit of DreamInflate be if the variable costs were 10…arrow_forward
- Compute the required cycle time for a process that operates 8 hours daily with two 15 min break and requires an output of 350 units per day. O 0.753 minutes 01.286 minutes 1.371 minutes 0.778 minutesarrow_forwardBalancing a process with a fixed sequence of activities will achieve a higher average labor utilization than balancing a process with no fixed sequence of activities. True or False?arrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.