Structural Analysis
Structural Analysis
6th Edition
ISBN: 9781337630931
Author: KASSIMALI, Aslam.
Publisher: Cengage,
Bartleby Related Questions Icon

Related questions

Question
(c) Shown in Figure 5, the drop gate at the end of the truck has a mass of 0.5 Mg at point
G. It is supported by cable AB and hinge C. Calculate the tension of the cable AB when
the truck accelerates at 4.7 m/s?. If the size of the drop gate is extended by 30%, the
center of gravity of the drop gate to hinge C become 1.56 m and the mass becomes 0.65
Mg. If the acceleration is the same, redesign the support system so that the tension of
the cable is the same. Find the reaction of hinge C for the new.
[Seperti yang ditunjukkan dalam Rajah 5, pintu penurunan di hujung trak mempunyai jisim 0.5Mg pada
titik G. la disokong oleh kabel AB dan engsel C. Hitung ketegangan kabel AB apabila trak memecut
pada 4.7 m/s2. Sekiranya ukuran pintu gerbang dipanjangkan sebanyak 30%, pusat graviti pintu
gerbang jatuh ke engsel C menjadi 1.56 m dan jisimnya menjadi 0.5 Mg. Jikalau kadar pecutan adalah
sama, reka bentuk semula sistem sokongan supaya ketegangan kabel sama. Cari reaksi engsel C untuk
reka bentuk baru.)
A
27°
B
0.8m
1.2m
50°
Figure 5
(Rajah S)
expand button
Transcribed Image Text:(c) Shown in Figure 5, the drop gate at the end of the truck has a mass of 0.5 Mg at point G. It is supported by cable AB and hinge C. Calculate the tension of the cable AB when the truck accelerates at 4.7 m/s?. If the size of the drop gate is extended by 30%, the center of gravity of the drop gate to hinge C become 1.56 m and the mass becomes 0.65 Mg. If the acceleration is the same, redesign the support system so that the tension of the cable is the same. Find the reaction of hinge C for the new. [Seperti yang ditunjukkan dalam Rajah 5, pintu penurunan di hujung trak mempunyai jisim 0.5Mg pada titik G. la disokong oleh kabel AB dan engsel C. Hitung ketegangan kabel AB apabila trak memecut pada 4.7 m/s2. Sekiranya ukuran pintu gerbang dipanjangkan sebanyak 30%, pusat graviti pintu gerbang jatuh ke engsel C menjadi 1.56 m dan jisimnya menjadi 0.5 Mg. Jikalau kadar pecutan adalah sama, reka bentuk semula sistem sokongan supaya ketegangan kabel sama. Cari reaksi engsel C untuk reka bentuk baru.) A 27° B 0.8m 1.2m 50° Figure 5 (Rajah S)
Expert Solution
Check Mark
Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Text book image
Structural Analysis
Civil Engineering
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:Cengage,
Text book image
Structural Analysis (10th Edition)
Civil Engineering
ISBN:9780134610672
Author:Russell C. Hibbeler
Publisher:PEARSON
Text book image
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Text book image
Fundamentals of Structural Analysis
Civil Engineering
ISBN:9780073398006
Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:McGraw-Hill Education
Text book image
Sustainable Energy
Civil Engineering
ISBN:9781337551663
Author:DUNLAP, Richard A.
Publisher:Cengage,
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning