An approach to a signal-controlled intersection has a width of 22 ft. and carries a flow of 600 vehicle/hr. The intersection is in a busy shopping street with many pedestrians. There is a 3% uphill gradient, 20% of the vehicles tur left without exclusive lanes for queueing in and 20% turn right. Knowing tha the pcu factor is 1.12, then Saturation flow = Your answer Correction for turning traffic, Your answeE Degree of saturation
Q: Two C310x45 channels are latticed together so they have equal moments of inertia about the principal…
A: step 1-
Q: F10-2. Determine the moment of inertia of the shaded area about thex axis,
A: step 1-
Q: Q2/List grop erties of sieve analysis? ca Sieving?
A: Properties of Sieve Analysis Performing the sieve analysis is important while analyzing the…
Q: 100 15.00
A: Given:- lift pressure at points A,B and C To find:- Lane's coefficient
Q: 54. Calculate the magnetic declination, if the magnetic bearing of a line is N 81°E and true bearing…
A: Given data: Magnetic meridian = N 81o E True meridian = N 77o E
Q: 10 kN/m 20 kN IB C 1 D 4m ㅡ→
A:
Q: If aquifer hydraulic conductivity and effective porosity are found to be 0.2 m/day and 0.25…
A: step 1-
Q: What will be the pressure head of a point in mm of Hg if pressure head of that point is equal to 53…
A: For same amount of pressure. Yh= constant.
Q: A layer of saturated clay 5 m thick is overlain by sand 4.0 m deep. The water table is 3 m below the…
A:
Q: H.W2.1 Q1- The deflection angles of closed loop traverse ABCDEF where measured as showing below A…
A: Given Bearing of AB = N42⁰31'E Deflection at B = 149⁰48'10" Back azimuth = Forward azimuth±180⁰…
Q: WHICH SECTION BEAM WILL BE STRONGER
A:
Q: SUPPLEMENTARY QUESTION The figure shows two reservoirs connected by a pipe. The discharge rate in…
A:
Q: TWO BEAM OF EQUAL CROSS-SECTIONAL AREA ARE SUBJECT TO EQUAL BENDING MOMENT. IF ONE BEAM HAS SQUARE…
A:
Q: Problem 3 Given in the tabulation below are the observed forward and backward bearings of an open…
A:
Q: b) Figure Q1 (b) shows a log with 1.2 m of diameter and 4 m of width is located between the two…
A: step 1-
Q: U=2.55 m/s a=1.2 m/s2 t=2 s Find final velocity of car
A: Introduction : The given question is related with mechanics . In this question we are provided with…
Q: Griven olat Mace of ball - 2 Kg Velority of boll - 1mls
A: Given:- The mass of the ball = 2 kg The velocity of the ball = 1 m/s To determine:- The kinetic…
Q: (Welded Connection - I attach some references on how to solve welded connections but I cannot solve…
A: Solution: Given: Assume material properties: A 36 steel for designing the member and the gusset…
Q: horizontally from one conveyor to the next using a ramp for which uk = 0.15. The top conveyor is…
A: Given:- w=15lb top conveyor =6 ft/sec To find:- required speed
Q: A Compound circular curve have: - R1= 290.75 m, Ai= 40' 14', C:= 175 m, - 27 40', Stat. P.C. = 50 +…
A:
Q: 3. Which one of the following is not categorized as a long-term loss of pre-stress in a pre-stressed…
A: As per Bartleby policy i can answer only one question at a time. Please upload other questions…
Q: Determine the force in members CD, ED, and CF of the space truss and state if the members are in…
A: The given figure is shown below:
Q: The number of flow channels and head drops is 4 and 12 respectively. If the difference in the…
A:
Q: important is geology in structural engineering
A: The significance of geology in structural engineering might be momentarily framed as follows:…
Q: 66. The magnetic bearing of a line is found as 35° 45'. If the declination is 3° 45' E, the true…
A: Given data, Magnetic bearing = 35°45' Declination = 3° 45' E To find out the true bearing of line.…
Q: Determine the dead weight of the reinforced concrete T-beam bridge interior beam using Figure 26 and…
A: The dead weight of bridge will include the dead weight of concrete mainly. Wearing surface load on…
Q: A Compound Circular Horizontal Curve Have :, A1 =42° 16`, E 2 =38.08 m AZp.c + P.I =62°12 AZp + P.T=…
A: Data is presented below and figure is drawn
Q: The following data were taken on five vehicles traveling consecutively 1.5 km portion of the NLEX.…
A:
Q: Find the value of coefficient of friction if friction force is 200 N and Normal force is 500 N
A: Introduction : The given question is related with mechanics . In this question we are provided with…
Q: Example : 5.2 A column section I.S.H.B. 350 @ 661.2 N/m carries an axial load of 1100 KN. Design a…
A:
Q: Determine the joint moments E=200,000 MPa, I=104 x106 mm4 (Hint: Consider 8 cycles of C.O.-Bal)…
A:
Q: each beam shown in figure:
A:
Q: Example 5: Determine the location of the center of mass of the cylinder shown n Figure if its…
A:
Q: C: Determine the reactions of the truss shown in Fig. using the method of consistent deformations.…
A: Truss is shown in the figure shown in the figure above and it has been asked in the question to…
Q: Q1.4 An eyebolt is subjected to four forces (Fl-12KN, F2-8kN, F3-18KN, F4-4kN) that act under given…
A:
Q: The typical floor height of a 20-floors building is 4 m. The building is served by a of lifts. Each…
A: As per our company guidelines we are supposed to answer only first 3 sub-parts. Kindly repost other…
Q: Building permit application and project management is a tedious task just like any other…
A:
Q: 40 kN 10 kN/m B -3 m 6 m 45 kN 55 kN Instruction: Draw the Moment Diagram by Parts using points A,…
A:
Q: of peg A to the center of the eye-piece is 1.50 m 14. A dumpy level is set up with its eye-piece…
A: given- Two pegs A and BReadings-1.50 m and 0.705 m1.490 m and 2.195 m
Q: For the cantilever beam and loading shown, plot shear and bending moment diagrams and then determine…
A:
Q: Find the force applied Work done=20 J Displacement=3 m
A: Introduction : The given question is related with mechanics . In this question we are provided with…
Q: alculations You must plot the data correctly,(the material weight = gm ) Sieve Mass Retained Percent…
A: in this question curve between percentage passing and sieve size is being asked . and we have to…
Q: Q2. A simply supported pre-stressed beam, of span 8 m ar carrying a live load equals to 12 kN/m.…
A:
Q: c) The chlorine residuals measured when various dosages of chlorine were added to a sample of water…
A: in this question a table of chlorine residue jar test is given and we are asked to find amount of…
Q: Fore O, Rectangle, » Distance of Centroid fom x- axis, i-e, (7) A, = (42) (46 +19+21) = 3612 mm2 X,…
A: To Determine Volume using Pappus-Guldinus Theorem.
Q: Supposing you were part of the students who visited Barekease water treatment plant for a practical…
A:
Q: tion shown. Determine the maximum umber) and compression (a negative esses produced in segment BCof…
A: IN Section BC :Bending moment is M=17(1.1)=18.7kN-m
Q: Water flow at 650 m/sec over the 12 m wide spillway of the dam. If the depth of the water 1. at the…
A:
Q: A simply supported beam of span Land flexural rigidity El, carries a unit point load at its centre.…
A:
Q: Determine the maximum moment that occurs on a 7m beam which is simply supported and loaded along the…
A: By the given data figure is drawn
Step by step
Solved in 2 steps with 1 images
- A rail transit system has prescribed the following factors:1. Peak hour demand = 30000 passengers/hr2. Minimum required speed = 55 ft/sec3. Deceleration = 3 ft/sec24. Safety factor = 1.455. Vehicle length = 80 ft6. Allowable vehicle capacity = 150 pass/veh7. Guideway utilization factor = 0.838. Minimum headway = 110 secHow many cars should the train consist of to provide adequate passenger capacity?Q3b. The 15km Atta Mills road connecting Old Barrier to Kokrobite operates with a capacity of 2250 pcu/hr and can be traversed within 15 minutes under free flow conditions. If a flow of 3100 pcu/hr is assigned to the road based on the capacity-restrained approach, what would be the resultant travel time after the traffic assignment proce ss.The average normal flow of traffic on cross roads A and B during design period are 400 and 250 pcu per hour; the saturations flow values on these roads are estimated as 1250 and 1000 pcu per hour respectively. The all-red time required for pedestrian crossing is 12 secs. Design two phase traffic signal by Webster's method.
- Analyze the unsignalized intersection below and calculate the optimum cycle length if the intersection will be signalized. Approach E W N S Maximum no. of lanes 5 5 4 4 Direction Through left Through left Through left Through left N Total volume pcu/hr 1,480 370 860 586 1,360 494 2,030 265 Sat. flow rate pcu/hr/lane 2,400 1,700 2,400 1,700 2,200 1,800 2,200 1,800Plz, solve this problem. Transportation Engineering-2 A four-lane highway (2 lanes in each direction) with 3.65m lanes has a horizontal curve designed for a 380 m centerline radius, and a 110 km/hr design speed. The grade is level. Use a driver perception reaction time of 2.5 sec and a vehicle deceleration rate of 3.4 m/sec2. Determine the closest distance any roadside object may be placed to the centerline of the inside lane of the roadway.(note: Do not round any value. Use calculated values).D. There are 10 vehicles observed in a 450 m length of Aurora Boulevard. If the average time headway is 5 sec. calculate the space mean speed in kph
- A segment of rural freeway is being designed for a FFS of 65 mph using 11 ft lanes in a mountainous area. The lateral clearance is nominal (1 ft). The directional (i.e. one-way) design flow rate is expected to be 2,400 passenger cars per hour. How many lanes in one direction will be needed to provide at least a LOS B? Response Feedback: When FFS=65 mph and flow rate=2400 pcphpl the density=36.9 pcpmpl which translates to a LOS E. When FFS=65 mph and flow rate=1200 pcphpl the density=18.5 pcpmpl which translates to LOS C. When FFS-65 mph and flow rate=800 pcphpl the density=12.3 pcpmpl which translates to LOS B.Traffic volume is 2578 veh/hr with 687 vehicles arriving in peak 15 minutes.There are tow lanes, 12 percent trucks(30/70 split for SUT/TT), the length of the road is 1.8 miles long with a 3.5 percent grade. calculate the analysis flow rate?A developer has applied for a construction permit to build a supermarket at the southeast cornerof an intersection that is formed by a four-lane divided highway in the east-west direction and atwo-lane road in the north-south direction. Traffic on the two-lane road is controlled by a stop signat the intersection. The speed limit on the four-lane highway is 88 km/h. using the sight trianglerequirements at the intersection (Case B1), determine whether permission should be given for theconstruction if the following conditions exist. Provide a diagram for your solution.Major road lane width = 3.6 mMinor road lane width = 3.3 mMedian lane = 2.8 mDesign vehicle is a passenger carApproach grade = 2%Maximum feasible distance building from the center of the nearest lane of four-lane road = 5.4 mMaximum feasible distance building from the center of the nearest lane of two-lane road = 16.5 m
- A two-lane minor street crosses a four-lane major street, with traffic conditions of volumes for each eight hours of an average day (both directions on major street) is 450 veh/h and the volume minor-street approach (one direction only) is 96 veh/h. With pedestrian volume of 198 ped/hr during (two hours in the morning and two hours in the afternoon) and the nearest traffic signal is located 250 ft from this location. The intersection is warranted for: Select one: O a.A traffic signal for warrant 4 O b. Not warranted since the nearest intersection is too close O C.A traffic signal for 70% of the condition of warrant 1 O d. NoneQUESTION 1 A four-lane urban freeway segment has a peak demand volume of 3,500 vehicles per hour for the two eastbound lanes. The PHF is 0.95 and there are no trucks, buses or RVs because the freeway is classified as a parkway and such vehicles are prohibited. The segment has 12 ft lanes, no lateral obstructions, 3 ramps within the influence area, and meanders through some beautiful rolling terrain. Assuming the road will be used by commuters and those familiar with the road, what is the flow rate (pcphpl)? Provide your answer to the nearest integer.QUESTION 3 If the free flow speed is measured in the field, you do not estimate free flow speed using the BFFS and adjustments for lane width, lateral clearance, and presence of ramps. O True False