A crew of mechanics at the Highway Department garage repair vehicles that break down at an average of 3 vehicles every 12 minutes (approximately Poisson in nature). The mechanic crew can service an average of 3 vehicles every 10 minutes with a repair time distribution that approximates an exponential distribution. The crew cost is approximately $150 per hour. The cost associated with lost productivity from the breakdown is estimated at $50 per hour. Which is cheaper, the existing system with one service crew or a revised system with two service crews? Note that the average waiting time for adding the second crew is 0.0

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter12: Queueing Models
Section12.5: Analytic Steady-state Queueing Models
Problem 9P
icon
Related questions
Question
A crew of mechanics at the Highway Department garage repair vehicles that break down at an average of 3 vehicles every 12 minutes (approximately Poisson in nature). The mechanic crew can service an average of 3 vehicles every 10 minutes with a repair time distribution that approximates an exponential distribution. The crew cost is approximately $150 per hour. The cost associated with lost productivity from the breakdown is estimated at $50 per hour. Which is cheaper, the existing system with one service crew or a revised system with two service crews? Note that the average waiting time for adding the second crew is 0.01.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,