a big western city is requesting federal funding for a park-and-ride project. One of the requirements in the request application is a network plan for the design phase of the project. Yousif Walker, the chief engineer, wants you to develop a project network plan to meet this requirement. He has gathered the activity time estimates and their dependencies shown here. Draw your project network by AOA method with T box, computing the activity early, late, and slack times. Mark the critical path. Using this legend: Legend of AOA Slack ES LF LS EF ID Time Predecessor None A 5 Description Survey Soil report Traffic design B A 20 C A 30 D Lot layout A 5 E B, C, D 80+N Approve design illumination F E 15 G Drainage E 30 H Landscape E 25 I Signing E 20 J Bid proposal F, G, H, I 10 *N= student's number. N=30

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
a big western city is requesting federal funding for a park-and-ride project. One of the
requirements in the request application is a network plan for the design phase of the project.
Yousif Walker, the chief engineer, wants you to develop a project network plan to meet this
requirement. He has gathered the activity time estimates and their dependencies shown here.
Draw your project network by AOA method with T box, computing the activity early, late,
and slack times. Mark the critical path. Using this legend:
Legend of AOA
Slack
ES LF
LS EF
ID
Time
Predecessor
None
A
5
Description
Survey
Soil report
Traffic design
B
A
20
C
A
30
D
A
5
Lot layout
Approve design
E
B, C, D
80+N
F
illumination
E
15
G
Drainage
E
30
H
Landscape
E
25
I
Signing
E
20
J
Bid proposal
F, G, H, I
10
*N= student's number.
N=30
Transcribed Image Text:a big western city is requesting federal funding for a park-and-ride project. One of the requirements in the request application is a network plan for the design phase of the project. Yousif Walker, the chief engineer, wants you to develop a project network plan to meet this requirement. He has gathered the activity time estimates and their dependencies shown here. Draw your project network by AOA method with T box, computing the activity early, late, and slack times. Mark the critical path. Using this legend: Legend of AOA Slack ES LF LS EF ID Time Predecessor None A 5 Description Survey Soil report Traffic design B A 20 C A 30 D A 5 Lot layout Approve design E B, C, D 80+N F illumination E 15 G Drainage E 30 H Landscape E 25 I Signing E 20 J Bid proposal F, G, H, I 10 *N= student's number. N=30
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Types of Scheduling Techniques
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning