7. Compute the takt time for a system where the total time per shift is 480 minutes, there is one shift, and workers are given two 15-minute breaks and 45 minutes for lunch. Daily demand is 300 units.
Q: W 1 WS 2 WS 3 5 minutes 3 minutes 4 minutes An assembly line consists of three workstations (WS)…
A: Efficiency : [Sum of all task times / (Actual work stations*Cycle time)]*100 = Cycle time = Net…
Q: Smart Kids Wonderland has decided to manufacture a new train toy set. The production process consist…
A:
Q: The Big Black Bird Company (BBBC) has a large order for special plastic-lined military uniforms to…
A: Given data: For the normal shift Contract price = $200 Production of the BBBC= 2,500 uniforms per…
Q: b. Suppose that the number of workers at each stage are as follows: Stage Number of Workers A 4 D E…
A: Output at each stage: The output of stage A = 605per hour = 12 per hour The output of stage B =…
Q: The Mach 10 is a one-person sailboat manufactured by Creative Leisure. The final assembly plant is…
A: Since you have posted a question with multiple sub-parts, we will solve the first three sub-parts…
Q: The grouping of equipment with respect need layout O a. cellular O b. product O c. fixed-position O…
A: Answe is option(e)
Q: A.J.’s Wildlife Emporium manufactures two unique birdfeed-ers (Deluxe and Super Duper) that are…
A: (a) The production priority will be decided based on the contribution margin of each product.…
Q: d) Using the longest operation time rule, the assignment of tasks to workstations should be: (Hint:…
A: Find the Calculation methods: Efficiency = Total task timeLead timeTotal task time = ∑ (Task…
Q: a) Which server is the bottleneck of the process ? b) What is the…
A: Note: As per the guidlnies of Bartleby, only three parts have been answered, for getting answers for…
Q: manufacturer operates 8 hours per day for 340 days per year, and has a demand of 2,000 units per…
A: Target Set up cost = (Annual demand/EOQ)*setup cost per hr.
Q: A work cell is scheduled to build 120 digital light processor (DLP) assemblies each week. These…
A: Demand= 120 dlp Work time (cell)= 6.5 hours×5= 32.5 hours= 1950 minutes Takt time= Work time of…
Q: Given the following information, compute the takt time: Total time per shift is 480 minutesper day,…
A: Formula:
Q: Assuming an eight-hour workday, compute the cycle time needed to obtain an output of 400 units per…
A: Hours per day (H) = 8 Minutes per hour (M) = 60 Output per day (O) = 400 units
Q: A production line with four automatic workstations (the other stations are manual) produces a…
A: Since you have posted a question with multiple sub-parts, we will solve the first three sub-parts…
Q: . How many standard hours are needed to run an order of 200 pieces if the setup timeis 1.3 hours and…
A: 200 Pieces Setup time = 1.3 hours Run Time = 0.3 hours per piece Efficiency = 130% Utilization = 70%…
Q: First question in the image Question N0 2: A production line has an hourly throughput rate 6…
A: Given data - Task A Task B Processing time (Min) 9 12 No. of worker 1 1
Q: An university is planning to arrange an international conference with the capacity of 500…
A: The term capacity cushion can be understood as a capacity which a company has maintained separately…
Q: 9.17 Tailwind, Inc., produces high-quality but expensive craining shoes for runners. The Tailwind…
A: Here we have Ta=Total time availaible =400 minutes per dayDa=Daily production rate required= 62…
Q: Some tasks and the order in which they must be performed according to their assembly requirements…
A: Given that: Cycle time = 42 seconds per unit (as computed in part a) Number of workstations = 6 (as…
Q: A manufacturing plant has the process displayed below. The drilling operation occurs separately from…
A: Given that: Capacity per hour Sawing 5 Sanding 5 Drilling 5 Welding 2.3 Assembly…
Q: An assembly line is to be designed to operate 7.5 hours per day and supply a steady demand of 300…
A: Given that - Demand = 300 units Operating time = 7.5 hours per day
Q: What is the takt time
A: Takt time indicating the relationship between Net production time and customer demand. Identifying…
Q: Given the following information, compute the takt time: Total time per shift is 480 minutes per day,…
A: Takt Time = Net time available per day/ Daily demand Daily demand = 80
Q: How many standard hours are needed to run an order of 500 pieces if the setup timeis 2.0 hours and…
A: Given, Order for 500 pieces Setup time is is 2.0 hours Run time is 0.3 hours per piece Efficiency is…
Q: A newly opened bed-and-breakfast projects the following: Monthly fixed costs Variable cost per…
A: Break-even analysis helps in determining the minimum levels of sales which is required to cover the…
Q: Classify the following types of processes as continuous, assembly line, batch, job shop, or…
A: Correct answer: Project. Justification: The doctor’s office is classified under the project as it…
Q: a) what is the bottleneck time of the system? b) what is the bottleneck station of this work cell?…
A: Production is the process in which inputs are combined to have the required output. It includes a…
Q: A.J.’s Wildlife Emporium manufactures two unique birdfeed-ers (Deluxe and Super Duper) that are…
A: Bottleneck in a process refers to the input who's limited capacity can reduce the capacity of the…
Q: If the firm operates 10 hours per day, 5 days per week, what is the weekly capacity of this work…
A: Weekly available time = 600 Minutes (10 hours) * 5 days = 3000…
Q: The table below defines the precedence relationships and element times for a new assembled product.…
A:
Q: You have been asked to put together a capacity plan for a critical operation at the Surefoot Sandal…
A: Formula:
Q: b)(i) If there are only three resource skills available ource load chart based on the resource…
A: A small introduction about Resource Constraint: The term "resource constraint" refers to the…
Q: A work center assigns tasks to 7 work stations. The total of all the task times is 24. If the cycle…
A: Remember the formulas for this problem Total time taken = No. of stations * Cycle time Efficiency =…
Q: Capacity Constraints (the chart is in the picture below) A visa application process from a…
A: a) The difference between bottleneck and constraints are : Bottlenecks Constraints 1 The…
Q: A manufacturing plant has the process displayed below. The drilling operation occurs separately from…
A: A) Bottleneck Bottleneck is the cycle or a stage that restricts a whole framework's ability to…
Q: 1. Aljon, a softdrink dealer, delivers 14 cases on Monday, 10 cases on Tuesday, 12 cases on…
A: No. of cases delivers on Monday =14 No. of cases delivers on Tuesday = 10 No. of cases delivers on…
Q: Purple Swift manufactures birdhouses in lots of 10. Eachbirdhouse takes 45 minutes to paint. After…
A: Utilization = Average Output Rate / Maximum Capacity Utilization = [(Number of lots x Setup Time) +…
Q: To meet holiday demand, Penny’s Pie Shop requires a pro-duction line that is capable of producing 50…
A: Given Information: The capacity of the shop = 50 pecan pies per week Operation hours = 40 hours per…
Q: The Big Black Bird Company (BBBC) has a large order for special plastic-lined military uniforms to…
A: Productivity is measure of output produced per single unit of input (resource) consumed. More the…
Q: A firm uses a serial assembly system and needs answers to the following:a. An output of 900 units…
A:
Q: A manufacturing plant has the process displayed below. The drilling operation occurs separately from…
A: A) Bottleneck Bottleneck is the cycle or a stage that restricts a whole framework's ability to…
Q: 3. A production line must produce 2,500 units every 6 hours of operating time. What is its cycle…
A: Cycle time = Total available time / Output
Q: What is the goal as stated by the theory of constraints(TOC), and how is that goal achieved?
A: An approach is a better way of looking at teaching and learning concepts. An approach gives rise to…
Q: a) What is the throughput time of this work cell? b) What is the bottleneck time of this work cell?…
A:
Q: California Gardens, Inc., prewashes, shreds, and distributes a variety of salad mixes in…
A: Given- Fixed costs for high speed shredders = $85,000 per monthVariable costs for high speed…
Q: a. An output of 930 units per shift (8.00 hours) is desired for a new processing system. The system…
A: Efficiency is the proportion between total activity time and total station time. Here, we can…
Q: A production process consists of a three-step operation. The scrap rate is 10 percent for the…
A: A three-step process Scrap rate at step-1 = 10% = 0.10 Scrap rate at step-2 = 6% = 0.06 Scrap rate…
help please need to see the work and answers done in excel only please
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 2 images
- To meet holiday demand, Penny’s Pie Shop requires a pro-duction line that is capable of producing 50 pecan pies perweek, while operating only 40 hours per week. There areonly four steps required to produce a single pecan pie withrespective processing times of 5 minutes, 5 minutes, 45 min-utes, and 15 minutes.a. What should be the line’s cycle time?b. What is the smallest number of workstations Penny couldhope for in designing the line considering this cycletime?c. Suppose that Penny finds a solution that requires onlyfour stations. What would be the efficiency of this line?Employees Layoffs at the University Medical Center The University Medical Center is medium-sized, 300-bed capacity hospital at Dasmarinas Cavites. The facilities have grown gradually over the years and are now the 2nd largest in the town of Dasmarinas. It is entirely nonunion and has never experienced an employee layoff since its inception. Sister Veronica Cornista, the Chief Executive Officer of the hospital for 8 years presented a rather bleak financial of the BOD. This according to her is the result of the declining occupancy rate which has affected the hospital’s revenues to such an extent that it ran a deficit for the first time last 1998. Such declines have not been unusual for this industry because of increasing competition. So far, the only response to these changes has been tightening of requirements for equipment or supply purchases. The projected deficit for the coming year is around 1,300,000 unless some additional revenues were identified or some additional savings…Number of Processing Time for A Processing Time for B Processing Time for C (minutes) Resource Workers (minutes) (minutes) 1 2 2 2 4 4 5 1 15 3 2 6. 4
- Esplanade Marine Parts Inc. wants to produce parts in batches of 60 parts. Each part must be processed sequentially from workstation A to B. Processing Workstation Batch Size (Q) Time per Part 40 seconds A B 60 60 15 seconds a. How many seconds are required to produce the batch under the assumptions of batch processing? Round your answer to the nearest whole number. seconds b. How many seconds are required to produce the batch under the assumptions of single-piece flow processing? Round your answer to the nearest whole number. seconds C. Compare the two solutions in terms of time saved. Round your answer to the nearest whole number. Using the assumptions of -Select- processing saves seconds.Additional Algo 4-3 Labor Content Meals are cooked in a process with two resources, The first tesource has a capacity of 9.5 meals per hour. The capacity of the second resource is 10 meals per hour. Demand for this process is 72 meals per hour. Instruction: Round your answer to three decimal places. What is the cycle time of this process (in minutes)? minutes5 ints PA 3-9 (Algo) Consider a four-step serial process with... Consider a four-step serial process with the number of workers at each step and processing times given in the following table. Time per Customer (in Minutes) 9 11 14 6 Process Step 1 2 3 4 Number of Workers 1 5 5 3 Assuming that the process starts out empty and is worker-paced, how long will it take (in minutes) to serve 14 customers? Note: Round to nearest minute. Time taken X Answer is complete but not entirely correct. 28 x minutes
- The diagram below shows a system that includes 7 operations with their capacities given as units/hr. What is the capacity (units/hr) of this system? Write the steps out manually please18/hr 4 10/hr 20/hr Current capacity 5 12/hr 19/hr 8/hr 36/hr The diagram describes a service process where customers go through either of two parallel three-step processes and then merge into a single line for two final steps. Capacities of each step are shown on the diagram. a. What is the current capacity of the entire system? units per hour Operation to improve How much additional capacity to strive for Resulting capacity of the process 8 36/hr b. If you could increase the capacity of only one operation through process improvement efforts, which operation would you select, how much additional capacity would you strive for, and what would the resulting capacity of the process be? units per hou units per houPA 3-9 (Algo) Consider a four-step serial process with... Consider a four-step serial process with the number of workers at each step and processing times given in the following table. Time per Customer (in Minutes) 5 14 6 3 Process Step 1 Number of Workers 1 Assuming that the process starts out empty and is worker-paced, how long will it take (in minutes) to serve 30 customers? Note: Round to nearest minute. Time taken minutes
- Mega Corp. is designing a product layout for a new electronic product. They plan to use this production line 8 hours a day in order to meet forecasted demand of 700 units per day. For output to meet the forecasted demand, the cycle time for this production line should be? Round-up to the nearest integer Select one: a. 64 seconds b. 42 seconds c. 32 seconds d. 38 secondsConsider a four-step serial process with the number of workers at each step and processing times given in the following table. Process Step 1 2 3 4 Number of Workers 1 5 4 5 Time per Customer (in Minutes) Assuming that the process starts out empty and is worker-paced, how long will it take (in minutes) to serve 20 customers? (Round to nearest minute.) minutes to serve 20 customers 8 19 13 5Applications are scanned in a process with two resources. The first resource has a capacity of 0.38 applications per minute. The capacity of the second resource is 0.17 applications per minute. Demand for this process is 0.22 applications per minute. Instruction: Round your answer to three decimal places. What is the cycle time of this process (in seconds)? seconds