3- Estimate the Curve Number for all three AMC conditions for a basin with the following data: Land use Soil group A Soil group Soil group C Soil dnor Total area (%) (%) (%) (%) Farm 12 19 18 60 Seeded 11 Pasture land (fair) 13 16 25

Fundamentals Of Construction Estimating
4th Edition
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Pratt, David J.
Chapter4: Measuring Site Work, Excavation, And Piling
Section: Chapter Questions
Problem 3RQ: What is the purpose of a soils report, and how can the information it contains assist the estimator?
icon
Related questions
Question

It's a hydrology question please answer fast. 

3- Estimate the Curve Number for all three AMC conditions for a basin with the following data:
Land use
Soil group A Soil
group
B.
Soil
group
Soil
Total area (%)
dno
(%)
(%)
%)
(6)
Farm
12
19
18
Seeded
11
15
Pasture land (fair)
16
25
Transcribed Image Text:3- Estimate the Curve Number for all three AMC conditions for a basin with the following data: Land use Soil group A Soil group B. Soil group Soil Total area (%) dno (%) (%) %) (6) Farm 12 19 18 Seeded 11 15 Pasture land (fair) 16 25
Expert Solution
steps

Step by step

Solved in 7 steps with 1 images

Blurred answer