13.19 A generator is transferring power to a load through a short line when a 3-phase fault occurs on the line. The maximum power limit before fault is 2.1 pu and initial power transfer is I pu. The inertia constant is 5 MJ/ MVA. Find critical clearing angle and critical clearing time. f= 50 Hz. [81.697°, 0.2433 secs]
13.19 A generator is transferring power to a load through a short line when a 3-phase fault occurs on the line. The maximum power limit before fault is 2.1 pu and initial power transfer is I pu. The inertia constant is 5 MJ/ MVA. Find critical clearing angle and critical clearing time. f= 50 Hz. [81.697°, 0.2433 secs]
Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter11: Transient Stability
Section: Chapter Questions
Problem 11.8P
Related questions
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps with 1 images
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning