Unit 4 Assignment Project Create WBS

xlsx

School

Herzing University *

*We aren’t endorsed by this school

Course

345

Subject

Mechanical Engineering

Date

Dec 6, 2023

Type

xlsx

Pages

4

Report

Uploaded by gionepepp

WBS Number Level 0 Level 1 1 Small Kitchen Renovation 1.1 Planning 1.1.1 1.1.2 1.1.3 1.1.4 1.2 1.2.1 1.2.2 1.2.5 1.3 Plumbing 1.3.2 1.3.3 1.3.4 1.3.5 1.4 1.4.2 1.4.4 1.5 1.5.2 1.5.3 1.6 1.6.1 1.6.3 Demolition 1.2.3 1.2.4 1.3.1 Electrical 1.4.1 1.4.3 Cabinetry 1.5.1 Countertops 1.6.2
1.7 1.7.2 1.7.4 1.8.1 1.9.1 1.9.2 1.9.4 10 Final touches 1.10.1 1.10.2 1.10.3 1.10.4 1.11 1.11.1 1.11.2 Flooring 1.7.1 1.7.3 1.8 Paint 1.8.2 1.8.3 1.8.4 1.9 Appliance installation 1.9.3 Project completion
Level 2 Go over budget and design with my husband Develop renovation timeline Obtain necessary permits and approvals Order materials and supplies Demolish old cabinets Dispose of debris Connect refrigerator water line Install lighting fixtures Install all outlets and switches Install the inside trim for the cabinets Seal and finish countertops Remove existing countertops Remove appliances Tear out flooring Install new plumbing lines Install new sink Connect dishwasher Install new garbage disposal Install new wiring Connect all appliances Assemble, paint and install new cabinets Install cabinet hardware Measure and cut countertops Install countertops
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Prepare and lay new flooring Seal and finish flooring Prime walls and ceiling Touch up trim Install new dishwasher Final inspection Remove old flooring Install new subfloor Prep walls and ceiling Paint walls and ceiling Install new refrigerator Install new stove Install new microwave Install backsplash Install hardware and fixtures Clean and touch up Final walkthrough Closeout and finalize budget