IMG_1501
jpeg
School
Des Moines Area Community College *
*We aren’t endorsed by this school
Course
21039
Subject
Mechanical Engineering
Date
Nov 24, 2024
Type
jpeg
Pages
1
Uploaded by DrTapirMaster712
T
Question
9
1/1pts
m—
Which
KPl
measure
assesses
the
ability
of
the
coding
unit
to
comply
with
documentation,
coding,
and
billing
requirements?
EE————
Denial
rate
Case
mix
index
Clean
claim
rate
Discharged,
not
final
billed
Discover more documents: Sign up today!
Unlock a world of knowledge! Explore tailored content for a richer learning experience. Here's what you'll get:
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Documents
Related Questions
Which tool helps to categorise risks into
three colour-coded zones representing
major, moderate, and minor risks
Risk Priority Number
Risk assessment matrix
Failure Mode and Effects Analysis
O Severity Matrix
arrow_forward
I need these 3 parts answered for a review activity.
arrow_forward
A) As the head of the Accelerometer Design Division (ADD), based on the following figures, advise your team on the
production an accelerometer to reduce or eliminate distortions in the readouts.
Magnitude ratio M(Go)
2.0
1.5
1.0
0.8
0.6
0.4
0.2
0.1
0.05
I
0.1
= 10.0
I
0.20
5.0
0.5
w/wn
2.0
H
1.0
{=0
0.3
0.4
0.5
0.707
1.0
2.0
3.0
+6
+3
0
-3
do d
Decibels (dB)
-10
-15
Resonance
band
Transmission
band
Filter
band
Phase shift [°] +(6)
0
-20
-40H
-60
-80
-100-
-120-
-140
-160
-180
0.05
0.10
10.0
0.20
0.50
(=0
1.0
10.0
5.0
2.0
1.0
0.7
0.5
0.4
= 0.3
I
2.0
arrow_forward
List 3 of the main reliability design analysis techniques
arrow_forward
Given the removal and replacement time data in the table, calculate IMART (mean time to repair)
Part identity
Bolts
Earth strap
Power lead
Signal lead
Cover plate
Brushes
Lesson 1.2 HW#1
Quantity Failure rate x 10-4 (h) Total M task time (h)
3
0.20
1
0.10
0.36
0.10
0.26
0.35
2
0.46
0.12
0.36
1.16
1.05
23.6
arrow_forward
I need these 3 parts answered TRUE or FALSE.
arrow_forward
Explain what is represented by the datum feature symbol attached to the feature control frame containing the form geometric tolerance.
arrow_forward
Complete the following statement about diagnostic trouble codes using the following words.
Words:
Body, Character, Chassis, Codes, Condition, Describe, DTCs, Fault, Five-character, Four, Indicate, Mandated, Manufacturers, Modes, More, Network communications, Numbers, Powertrain, Second, Sensor, Set, Special, Specific, System, Tests, Various, Vehicle, Where
OBD-II __________ are standardized, which means that most __________ mean the same thingregardless of the __________. However, vehicle and scan tool __________ can have additional DTCsand add __________ data streams, report __________, and diagnostic __________. DTCs aredesigned to __________ the circuit and the system where a __________ has been detected.An OBD-II DTC is a __________ code with both letters and numbers. This is called the alphanumeric__________.The first __________ of the code is a letter. This defines the system where the code was __________.Currently there are __________ possible first character codes:P:…
arrow_forward
Provide the appropriate datum feature symbols and datum features in the feature control frames on the drawing
arrow_forward
In a continuous review inventory system, the lead time for doorknobs is 5 weeks. The standard deviation of demand during thelead time is 85 units. The desired cycle-service level is 99 per-cent. The supplier of door knobs streamlined its operations andnow quotes a one-week lead time. How much can safety stockbe reduced without reducing the 99 percent cycle-service level?
arrow_forward
I can't find the symbols for the blank ones
arrow_forward
answer the following BOTH questions, and i know the policy, the 2 questions is FINE and i have read the policy, thanks
arrow_forward
The term “Poka Yoke” means:
Error handling
Mistake proofing
Confidence level
arrow_forward
Hello Sir.Good Night.
I have a question in my homework related geometry tolerance lesson. The following below is my question. Please advice. Thank you
arrow_forward
please answer do not image format
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you

Automotive Technology: A Systems Approach (MindTa...
Mechanical Engineering
ISBN:9781133612315
Author:Jack Erjavec, Rob Thompson
Publisher:Cengage Learning
Related Questions
- Which tool helps to categorise risks into three colour-coded zones representing major, moderate, and minor risks Risk Priority Number Risk assessment matrix Failure Mode and Effects Analysis O Severity Matrixarrow_forwardI need these 3 parts answered for a review activity.arrow_forwardA) As the head of the Accelerometer Design Division (ADD), based on the following figures, advise your team on the production an accelerometer to reduce or eliminate distortions in the readouts. Magnitude ratio M(Go) 2.0 1.5 1.0 0.8 0.6 0.4 0.2 0.1 0.05 I 0.1 = 10.0 I 0.20 5.0 0.5 w/wn 2.0 H 1.0 {=0 0.3 0.4 0.5 0.707 1.0 2.0 3.0 +6 +3 0 -3 do d Decibels (dB) -10 -15 Resonance band Transmission band Filter band Phase shift [°] +(6) 0 -20 -40H -60 -80 -100- -120- -140 -160 -180 0.05 0.10 10.0 0.20 0.50 (=0 1.0 10.0 5.0 2.0 1.0 0.7 0.5 0.4 = 0.3 I 2.0arrow_forward
- List 3 of the main reliability design analysis techniquesarrow_forwardGiven the removal and replacement time data in the table, calculate IMART (mean time to repair) Part identity Bolts Earth strap Power lead Signal lead Cover plate Brushes Lesson 1.2 HW#1 Quantity Failure rate x 10-4 (h) Total M task time (h) 3 0.20 1 0.10 0.36 0.10 0.26 0.35 2 0.46 0.12 0.36 1.16 1.05 23.6arrow_forwardI need these 3 parts answered TRUE or FALSE.arrow_forward
- Explain what is represented by the datum feature symbol attached to the feature control frame containing the form geometric tolerance.arrow_forwardComplete the following statement about diagnostic trouble codes using the following words. Words: Body, Character, Chassis, Codes, Condition, Describe, DTCs, Fault, Five-character, Four, Indicate, Mandated, Manufacturers, Modes, More, Network communications, Numbers, Powertrain, Second, Sensor, Set, Special, Specific, System, Tests, Various, Vehicle, Where OBD-II __________ are standardized, which means that most __________ mean the same thingregardless of the __________. However, vehicle and scan tool __________ can have additional DTCsand add __________ data streams, report __________, and diagnostic __________. DTCs aredesigned to __________ the circuit and the system where a __________ has been detected.An OBD-II DTC is a __________ code with both letters and numbers. This is called the alphanumeric__________.The first __________ of the code is a letter. This defines the system where the code was __________.Currently there are __________ possible first character codes:P:…arrow_forwardProvide the appropriate datum feature symbols and datum features in the feature control frames on the drawingarrow_forward
- In a continuous review inventory system, the lead time for doorknobs is 5 weeks. The standard deviation of demand during thelead time is 85 units. The desired cycle-service level is 99 per-cent. The supplier of door knobs streamlined its operations andnow quotes a one-week lead time. How much can safety stockbe reduced without reducing the 99 percent cycle-service level?arrow_forwardI can't find the symbols for the blank onesarrow_forwardanswer the following BOTH questions, and i know the policy, the 2 questions is FINE and i have read the policy, thanksarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Automotive Technology: A Systems Approach (MindTa...Mechanical EngineeringISBN:9781133612315Author:Jack Erjavec, Rob ThompsonPublisher:Cengage Learning

Automotive Technology: A Systems Approach (MindTa...
Mechanical Engineering
ISBN:9781133612315
Author:Jack Erjavec, Rob Thompson
Publisher:Cengage Learning