Programmable Logic Controllers
Programmable Logic Controllers
5th Edition
ISBN: 9780073373843
Author: Frank D. Petruzella
Publisher: McGraw-Hill Education
Expert Solution & Answer
Book Icon
Chapter 15.5, Problem 1RQ

Explanation of Solution

ControlLogix ladder rung with a math instruction:

The ControlLogix ladder rung for adding the value of “Pressure_A” and constant value “50” is given below:

Explanation:

From the above diagram, the math instruction is used for the given ControlLogix ladder rung is “ADD” instruction.

  • When the “Toggle_Switch” is closed, the rung becomes “true”...

Blurred answer
Students have asked these similar questions
The OFF state of bool type variable can be expressed by: Only normally closed contact instruction. O Only normally open contact instruction. Normally open or normally closed contact instructions.
Computer Science A circuit for two output ports (A&C) of the AVR ATmega16 microcontroller each connected to 8 LEDs. Write a program to control the LEDs in a sequence shown by stepping to lit on the LED sequentially as in the figure by toggling the LED at the same time for both ports (500mS) ending at the last state of the figure and looping back inversely to the start. This s done for 3 times back and forth.
The ON state of bool type variable can be expressed by: O Only normally open contact instruction. Normally open or normally closed contact instructions. Only normally closed contact instruction.

Chapter 15 Solutions

Programmable Logic Controllers

Ch. 15.1 - Prob. 11RQCh. 15.1 - Compare the accessibility of program scope and...Ch. 15.1 - Prob. 13RQCh. 15.1 - What is the difference between a produced tag and...Ch. 15.1 - Prob. 15RQCh. 15.1 - State the data type used for each of the...Ch. 15.1 - Describe the make-up of a predefined structure.Ch. 15.1 - Describe the make-up of a module-defined...Ch. 15.1 - Describe the make-up of a user-defined structure.Ch. 15.1 - Prob. 20RQCh. 15.1 - Prob. 21RQCh. 15.1 - Prob. 22RQCh. 15.1 - Prob. 23RQCh. 15.2 - Prob. 1RQCh. 15.2 - Prob. 2RQCh. 15.2 - Prob. 3RQCh. 15.2 - Prob. 4RQCh. 15.2 - Prob. 5RQCh. 15.2 - Prob. 6RQCh. 15.2 - Prob. 7RQCh. 15.2 - Prob. 8RQCh. 15.2 - Prob. 9RQCh. 15.2 - Prob. 10RQCh. 15.2 - Prob. 11RQCh. 15.2 - Extend control of the original ControlLogix...Ch. 15.2 - Prob. 3PCh. 15.3 - Prob. 1RQCh. 15.3 - Prob. 2RQCh. 15.3 - Prob. 3RQCh. 15.3 - Prob. 4RQCh. 15.3 - Prob. 5RQCh. 15.3 - Prob. 6RQCh. 15.3 - Prob. 7RQCh. 15.3 - Prob. 8RQCh. 15.3 - Prob. 9RQCh. 15.3 - Prob. 10RQCh. 15.3 - Prob. 11RQCh. 15.3 - Prob. 12RQCh. 15.3 - Modify the original CLX ten-second TON timer...Ch. 15.3 - Prob. 2PCh. 15.3 - Prob. 3PCh. 15.3 - Prob. 4PCh. 15.3 - Prob. 5PCh. 15.3 - Prob. 6PCh. 15.4 - Prob. 1RQCh. 15.4 - Prob. 2RQCh. 15.4 - Prob. 3RQCh. 15.4 - Prob. 4RQCh. 15.4 - Prob. 5RQCh. 15.4 - Prob. 6RQCh. 15.4 - Prob. 7RQCh. 15.4 - Prob. 1PCh. 15.4 - Prob. 2PCh. 15.5 - Prob. 1RQCh. 15.5 - Prob. 2RQCh. 15.5 - Prob. 3RQCh. 15.5 - Prob. 4RQCh. 15.5 - Prob. 5RQCh. 15.5 - Construct a ControlLogix ladder rung with compare...Ch. 15.5 - Prob. 2PCh. 15.5 - A single pole switch is used in place of the two...Ch. 15.6 - Prob. 1RQCh. 15.6 - Name the four basic elements of an FBD.Ch. 15.6 - Prob. 3RQCh. 15.6 - Prob. 4RQCh. 15.6 - Prob. 5RQCh. 15.6 - Prob. 6RQCh. 15.6 - Prob. 7RQCh. 15.6 - Prob. 8RQCh. 15.6 - Prob. 9RQCh. 15.6 - Prob. 10RQCh. 15.6 - Prob. 11RQCh. 15.6 - How is a function block feedback loop created?Ch. 15.6 - Prob. 13RQCh. 15.6 - Prob. 14RQCh. 15.6 - Prob. 1PCh. 15.6 - Prob. 2PCh. 15.6 - Prob. 3PCh. 15.6 - Prob. 4PCh. 15.6 - Prob. 5P
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
EBK JAVA PROGRAMMING
Computer Science
ISBN:9781337671385
Author:FARRELL
Publisher:CENGAGE LEARNING - CONSIGNMENT
Text book image
COMPREHENSIVE MICROSOFT OFFICE 365 EXCE
Computer Science
ISBN:9780357392676
Author:FREUND, Steven
Publisher:CENGAGE L