Using the cut-and-try method for aggregate operations planning, as described in the textbook, we can calculate ending inventory and safety stock as a percent of forecast demand. If beginning inventory = 300 units, the production requirement in units of output = 1,350 units, demand forecast = 1,500 units, then ending inventory and percent safety stock?
Q: A manager is quite concerned about the recent deterioration of a section of the roof on a building t...
A: The decision tree is a strong and well-known method for separating and foreseeing. A decision tree i...
Q: Which one does not necessarily result in cost savings in an industrial facility? Why? a. Energy con...
A: Cost cutting strategies are sweeping all businesses as a result of the current crisis. Building oper...
Q: On which basis can be CONWIP evaluated against Pure Push system? Discuss it with the help of any exa...
A: CONWIP stands for Constant work in process.
Q: 1.5 George Kyparisis makes bowvling balls in his Miami plant. With recent increases in his costs, he...
A: Multifactor productivity is the productivity of all the factors that contribute to producing output....
Q: Discussion Question #1- Using your "own words", discuss the differences among decision making under ...
A: Decision-making is the cycle of making decisions by recognizing a decision, gathering data, and eval...
Q: 4. Prepare a run diagram for this emergency call data. Use five-minute intervals (i.e., count the ca...
A: Given-
Q: The schedule variance is the difference between the earned value and the planned value. True F...
A: Schedule variance - is an expression of whether the project schedule is forward or behind. It is com...
Q: Tuff-Rider, Inc., manufactures touring bikes and mountain bikes in a variety of frame sizes, colors...
A: Given data For touring Demand forecast (D) = 4000 units per year Lot size (Q) = 100 units Standar...
Q: as project manager selected to head the sargussum seaweed project, you are responsible for creating...
A: Here, we could see that the Project manager would head the mentioned project and this project manage...
Q: ANSWER THE QUESTION BELOW BASED UPON THIS INFORMATION (NOTE: THIS INFORMATION DOES NOT CHANGE FOR AL...
A: Decision variable: Suppose-X be the no. of Suits to produceY be the no. of Sports Coats to produce...
Q: 16. To complete the wing assembly for an experimental aircraft, Rhea V. has laid out the major steps...
A: Activity Optimistic time Most Likely time Pessimistic time Predecessor A 1 2 3 B 2 3 4 C ...
Q: What layout features stand out? 2. Is there anything that is not appealing? 3. Does something abou...
A: A Small Introduction about Layout Management Since they utilize different design chiefs to contro...
Q: 'n a system with a single capacity 1 server with Random.Exponential(0.25) minutes inter-arrival time...
A: The Utilization Rate is the rate at which you use the all-out accessible season of your assets. It e...
Q: Describe and differentiate these steps.
A: PERT and CPM both are tools of project management that helps in scheduling the tasks of the activiti...
Q: What does change management accomplish and what are the components of an effective change management...
A: As it is said that change is the law of nature so the business also undergoes number of changes on e...
Q: Tyler bakes Cookies (C) and Breads (B) with the help of two ovens in his little bakery. The time tak...
A: Tyler should produce 99.13 batches of Cookies and 18.26 batches of Breads to achieve a maximized rev...
Q: "he percent change in productivity for one month last year versus one month this year on a multifact...
A:
Q: With the use of a diagram, show (illustrate) the typical levels of uncertainty or project risks asso...
A: A project risk is a dubious occasion that could conceivably happen during a project. In spite of our...
Q: 13. The production analyst of gas company is faced with deciding whether to purchase a patent to dev...
A: In the given situation, there are 2 alternatives. 1. Purchase the patent and develop the product 2. ...
Q: - percent change in productivity for or no month thir vanr a multi nctor bn
A: Multifactor productivity indicating the proportion between total output and total input. Here, we wi...
Q: Scenario The KOREAN factory of Hi-Tech Metal, Inc. primarily manufactures plumbing system parts for ...
A: given, Lengthy 3 to 4 days schedule drafting time, caused by mainframe computer’s long processin...
Q: A wrapping paper company produced 2,000 rolls of paper one day. Standard price is Php35/roll. Labor ...
A:
Q: What central line and control limits should be established
A: A control chart is a statistical toole which identifying the variability or trustworthiness of a pro...
Q: A potential project has an initial capital investment of $100,000. Net annual revenues minus expense...
A: A Small Introduction about Project Management Project management gives construction and control o...
Q: What are hammock activities and when should they be used
A: A hammock activity can be defined as a schedule or project planning term for a gathering of undertak...
Q: After completing the readings for this week and discussing place marketing, the inbound method, and ...
A: Marketing and selling a product/service revolve around a simple concept, and that is marketing mix. ...
Q: Not all business intelligence users are managers interested in forecasting sales figures for the nex...
A: More and more equipment dealers rely on data and statistics to run their businesses. It necessitates...
Q: 2- El Supper Store has a chain of 20 stores in El Gouna and Sahel. Sales figures and profits for the...
A: Given-
Q: If the profit generated per cabinet is P80 and per dresser is P100, write the objecti that best desc...
A: Linear programming is a process to reach the best outcome such as maximum profit or lowest cost in a...
Q: Seat your guest at the table. What will be the order of seating? Where should which person be seated...
A: Listing the stakeholders of the meeting Mr Smith - A renowned businessman from Great Britain Profe...
Q: 1. A bakeshop has recorded sales (in dozens) for three products, as shown belowboar en a. Predict or...
A: Given-
Q: e activity times after crashing to show the resulting schedule. (
A: Project crashing indicating the process of reducing the total project completion time using addition...
Q: In your own opinion, explain the phrase “money is important but it is not the essence of motivation”...
A: Human resource management is described as a process through which proper compensation, training, and...
Q: 3. The marketing group for a cell phone manufacturer plans to conduct a telephone survey to determin...
A: Let, D = Number of daytime calls to be made E = Number of evening calls to be made The cost to make ...
Q: the next logical step in any
A: Predictive analytics employs data mining, statistical modelling, and machine learning to create pred...
Q: Determine the weekly product yield
A: Product yield is the sum of total item which are qualified for the sales after the production proces...
Q: 1. It has been said that forecasting using exponential smoothing is like driving a car by looking in...
A: As specified, I have solved the second question for you. Kindly find it's answer ahead and post the ...
Q: unit of time used to develop the activity duration
A: activity duration indicating the time required to complete a task in a given work breakdown structur...
Q: 55. The mail order firm of L. L. Pea receives an averageof 200 calls per hour, where times between c...
A: Given data is as follows: The arrival time is 200/hr. The service rate per hour is 20/hr. The wage r...
Q: Discuss the concept of stakeholders of an organisation. Why the concept is an important concept for ...
A: The stakeholder can be understood as a group of individuals who have interest in the working and fun...
Q: Major overhaul expenses of $5,000 each are anticipated for a large piece of earthmoving equipment. T...
A: Given, Overhaul expenses- $5000 Rate of Interest- 12% Time- 5-13 years
Q: Would you say that system with higher efficiency ratios rather than other systems will have higher u...
A: There is often confusion between efficiency and utilization and sometimes both these terms are consi...
Q: Briefly explain the 5 critical decision making criteria in Operations which can support mission and ...
A: Supply chain management is the management in which production of production services are managed. It...
Q: (H) linear programming formulation Let x- number of units i shipped to client j, using the indices f...
A: Given data is As the capacity was less than demand a dummy row is added.
Q: Are some aspects of organizational effectiveness not taken into account by lean management? Is this ...
A: Lean management is a quality efficiency-oriented method that looks for continuous improvement in an ...
Q: ffing related to each stage of the project life cycle?
A: Phases may be used by project managers or the organization as a way to better manage projects and ke...
Q: Corry Corporation purchases 1,200,000 unit per year of one component. The Fixed Cost per order is $2...
A: given, purchases = 1,200,000 per year fixed cost = $25 carrying cost = 27% of its $2 cost
Q: Answer the following: Consider the impact and contribution of outsourcing on the global business env...
A: When a company hires or contracts with another external company to perform their tasks for a specifi...
Q: What are the best practices in project HR management
A: Project management is the different kinds of management in which different skills and knowledge are ...
Q: 2. Back Savers is a company that produces backpacks primarily for students. They are considering off...
A: given, nylon = 5000 sq foot material each week sales forecast = 1000 colligenate and 1200 minis per...
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- . Case: Flamingo Educational Services Flamingo Educational Services, a company located in the Tema metropolis, is a nationwide market leader in the publishing and distribution of textbooks for first and second cycle schools. Somehow, Flamingo does not use forecasts for production planning. Instead, the operations manager decides which books to produce and the batch size, based on orders and the amounts in inventory. The books that have the fewest amounts in inventory get the highest priority. Demand is uneven, and the company has experienced being overstocked on some items and out of others. Being under-stocked has occasionally created tensions with managers of the retail bookstores the company works with. Flamingo is on the verge of losing a lucrative contract with the Ghana Education Service over a complaint that the books produced over the last four months have defective binding as well as slight but noticeable variations in print quality and sizes of the…A manufacturing company produces single item product. Theproduction manager decide to arrange 6 periods for MPS. Data aboutdemand forecasts are 112, 157, 126, 176, 124 and 181 while data aboutcustomer orders are 128, 156, 196, 147, 152 and 175. On hand inventoryis 300 units and production batch is 300 units. The productionmanager also decide that 3 beginning periods are critical, so that nochanges are allowed. Arrange MPS for that situation ! When system’s bottleneck requires 10 minutes to finish a unit product,make analysis about capacity. What is your suggestion? please explain it using excel or attached the excel sheetGiven the forecast and booked orders shown in the table, and a beginning inventory of 25, what should the master production schedule quantity be for period 4? Note:- Do not provide handwritten solution. Maintain accuracy and quality in your answer. Take care of plagiarism. Answer completely. You will get up vote for sure.
- A small company produces recreational vehicles. The (in units): Mar Apr May Jun Jul Aug Sep 50 Total Month 359 Forecast 55 60 60 40 50 44 Use the following information: Regular labour cost $240 per unit Overtime labour cost $360 per unit Regular capacity 40 units per month, using 5 workers Overtime capacity 8 units per month Holding cost $30 per unit per month Back-order cost $100 per unit per month Beginning inventory Desired ending inventory 0 Hiring cost $2,000 per worker Develop the minimum cost production plan and compute its total cost.Revenue Management / Yield Management is used when the following conditions exist: Uncertainty in demand and customer behavior (no-show, cancellation) + non-perishable goods Uncertainty in demand and customer behavior + backordering allowed Fixed Capacity + Perishable Inventory (hence, opportunity cost) + Advanced Booking (or sales) None of the aboveQ2: A company has seasonal demand, with the forecast for the next 12 months as given below. The current labor force can produce 500 units per month. Each employee can produce 20 units per month, and is paid $2,000 per month. The inventory carrying cost is $50 per unit per period. It costs $100 to hire or layoff an employee. Assume 200 units of initial inventory and we would like to keep the similar level at the end of the year. Month 1 3 4 7 8 9 10 11 12 Demand 660 700 840 700 660 500 600 840 80 900 700 600 Please use level and chase strategy to calculate the total cost of two plans (please show your work).
- If a company's product demand is 100 units in month 1, 75 units in month 2, 110 units in month 3 and 50 units in morth 4, 4 (Hint: Moving average = sum of demand in period i / number of periods in the moving average) 1.95.50 O2.71.25 3.83.75 O4.103.35The management of Swift Company has determined the aggregated demand schedule in the following units: Month Demand Jan 650 Feb 930 Mar 1110 Apr 1550 May 2120 Jun 3130 Jul 2870 Aug 1690 Sept 1530 Oct 1610 Nov 2110 Des 1330 Each worker can produce an average of 10 units per month and is paid $2,000 (payroll costs) at regular time per month. If workers go home early (undertime) they are paid the same as normal time (regular time). In accordance with the employment contract with the union, the company does not impose overtime hours and sub-contracts work. companies can recruit and train (hire & train) new workers for a fee of $2,000 and lay off per person for $ 500. Inventory cost $ 32 per unit at the end of each month. Currently the company employs 140 workers, to anticipate inventory is 0 then: Make a production plan using the workforce level to anticipate inventory by choosing an additional supply…c. Compute and tabulate the daily demand for each month in the table below (round off to the nearest whole number). MONTH PRODUCTION DAYS DEMAND FORECAST DEMAND PER DAY JAN 2022 16 150 ? FEB 2022 16 150 ? MAR 2022 23 250 ? APR 2022 21 250 ? MAY 2022 22 400 ? JUN 2022 22 500 ? JUL 2022 21 600 ? AUG 2022 20 750 ? SEP 2022 20 450 ? OCT 2022 20 250 ? NOV 2022 16 150 ? DEC 2022 16 150 ? TOTAL ? ? d. Assuming that MPQ Limited had adopted a level strategy for the year ended 31 December 2022, compute the average daily demand for the year (round off to the nearest whole number). e. Prepare a graph showing the monthly forecasts and average daily forecast (in units per day) for MPQ Limited.
- Month# Jan Feb Mar Apr May June Forecast# 1800 1500 1100 1500 2100 1600 Name Labor hours per unit (hr/unit) Initial number of workers Safety Stock (units) Working hours in a day(hr/day) Beginning inventory(units) Value 5 30 0 9 450 Month# Jan Feb Mar Apr May June Working Days available 21 21 21 21 21 19 The tables present forecasts, production, and cost information for aggregate planning. Using a level strategy with backorders to produce at average demand, now many workers are required each month? (Round up the calculated number of workers to the nearest whole number, and round the production rate to the nearest whole numberIn exponential smoothing method, which one of the following statements is true? O a. Alpha is between 0 and 1, and high value of alpha is used for stable demand O b. Alpha is between 0 and 1, and high value of alpha is used for unstable demand O c. Alpha is greater than 1, and high value of alpha is used for stable demand O d. Alpha is greater than one, and high value of alpha is used for unstable demand O e. Alpha is negative, and high value of alpha is used for stable demand US PAGE acer F2 F3 F4 F5 F6 F7 Coc) F8 F9 F10 F11 图, 2$1. Foxie Owl’s Besty Bagel shop makes fresh bagels. She has to buy raw materials fresh every day for selling on that day. She wants to know exactly how much should she spend on raw materials. Foxie did some analysis over the past month and came back with the following numbers: Daily demand was equally likely to be 200, 225, 250, 275, or 300 bagels. What should be the number of bagels on hand to satisfy a Fill Rate requirement of 96%, rounded to next integer value? Group of answer choices 300 275 286 263 2. Suppose that instead of a discrete demand distribution, Foxie’s shop determines that the daily demand for bagels is normally distributed, with a mean of 250 and a standard deviation of 35. Foxie still wants a Fill Rate of 98%. What is the appropriate level of on-hand inventory for Foxie’s shop? Group of answer choices 263 274 257 270