Practical Management Science
6th Edition
ISBN: 9781337406659
Author: WINSTON, Wayne L.
Publisher: Cengage,
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 4, Problem 114P
Summary Introduction
To develop: A work
Linear programming:
It is a mathematical modeling procedure where a linear function is maximized or minimized subject to certain constraints. This method is widely useful in making a quantitative analysis which is essential for making important business decisions.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
A bank is trying to determine which of two machines to rent for check processing. Machine 1 rents for $10,000 per year and processes 1000 checks per hour. Machine 2 rents for $15,000 per year and processes 1600 checks per hour. Assume that machines work eight hours a day, five days a week, 50 weeks a year. The bank must process an average of 800 checks per hour, and the average check processed is for $100. Assume an annual interest rate of 20%. Then determine the cost to the bank (in lost interest) for each hour that a check spends waiting for and undergoing processing. Assuming that interarrival times and service times are exponentially distributed, which machine should the bank rent?
During an eight-hour shift, 750 non-defective parts are desired as a result of a manufacturing operation. The default operation time is 15 minutes. As the operators of machine are inexperienced, the actual time they take to perform the operation is 20 minutes, and, on average, a fifth of the parts that start to be manufactured are lost. Assuming that each one of the machines used in this operation will not be available for one hour in each shift, determine the number of machines needed.
A manufacturing facility stores spare parts for maintenance in a storage facility. Throughout theworking day, manufacturing personnel go to the storage facility to pick up supplies needed for theirjobs. The storage facility employees receive a request for supplies, on average, every five minutes fromthe manufacturing personnel. The average request requires 3.2 minutes to fill a request. Manufacturingpersonnel are paid $29.50 per hour and storage facility employees are paid $18.75 per hour. The storagefacility operates 8 hours per day. Base your costs on an 8-hour workday, the given arrival and servicerates, and the fact that when the manufacturing personnel are at the storage site picking up parts – theyare unable to complete their normal job in manufacturing.a) What is the system cost per day (to the nearest $) if there is only 1 storage facility employeeworking?b) What is the system cost per day (to the nearest $) if there are 2 storage facility employeesworking?c) What is the system…
Chapter 4 Solutions
Practical Management Science
Ch. 4.2 - Prob. 1PCh. 4.2 - Prob. 2PCh. 4.2 - Prob. 3PCh. 4.2 - Prob. 4PCh. 4.2 - Prob. 5PCh. 4.2 - Prob. 6PCh. 4.3 - Prob. 7PCh. 4.3 - Prob. 8PCh. 4.3 - Prob. 9PCh. 4.3 - Prob. 10P
Ch. 4.3 - Prob. 11PCh. 4.3 - Prob. 12PCh. 4.4 - Prob. 13PCh. 4.4 - Prob. 14PCh. 4.4 - Prob. 15PCh. 4.4 - Prob. 16PCh. 4.4 - Prob. 17PCh. 4.4 - Prob. 18PCh. 4.4 - Prob. 19PCh. 4.5 - Prob. 20PCh. 4.5 - Prob. 21PCh. 4.5 - Prob. 22PCh. 4.5 - Prob. 23PCh. 4.5 - Prob. 24PCh. 4.5 - Prob. 25PCh. 4.6 - Prob. 26PCh. 4.6 - Prob. 27PCh. 4.6 - Prob. 28PCh. 4.6 - Prob. 29PCh. 4.7 - Prob. 30PCh. 4.7 - Prob. 31PCh. 4.7 - Prob. 32PCh. 4.7 - Prob. 33PCh. 4.7 - Prob. 34PCh. 4.7 - Prob. 35PCh. 4.7 - Prob. 36PCh. 4.7 - Prob. 37PCh. 4.7 - Prob. 38PCh. 4.7 - Prob. 39PCh. 4.7 - Prob. 40PCh. 4.8 - Prob. 41PCh. 4.8 - Prob. 42PCh. 4.8 - Prob. 43PCh. 4.8 - Prob. 44PCh. 4 - Prob. 45PCh. 4 - Prob. 46PCh. 4 - Prob. 47PCh. 4 - Prob. 48PCh. 4 - Prob. 49PCh. 4 - Prob. 50PCh. 4 - Prob. 51PCh. 4 - Prob. 52PCh. 4 - Prob. 53PCh. 4 - Prob. 54PCh. 4 - Prob. 55PCh. 4 - Prob. 56PCh. 4 - Prob. 57PCh. 4 - Prob. 58PCh. 4 - Prob. 59PCh. 4 - Prob. 60PCh. 4 - Prob. 61PCh. 4 - Prob. 62PCh. 4 - Prob. 63PCh. 4 - Prob. 64PCh. 4 - Prob. 65PCh. 4 - Prob. 66PCh. 4 - Prob. 67PCh. 4 - Prob. 68PCh. 4 - Prob. 69PCh. 4 - Prob. 70PCh. 4 - Prob. 71PCh. 4 - Prob. 72PCh. 4 - Prob. 73PCh. 4 - Prob. 74PCh. 4 - Prob. 75PCh. 4 - Prob. 76PCh. 4 - Prob. 77PCh. 4 - Prob. 78PCh. 4 - Prob. 79PCh. 4 - Prob. 80PCh. 4 - You want to take out a 450,000 loan on a 20-year...Ch. 4 - Prob. 82PCh. 4 - Prob. 83PCh. 4 - Prob. 84PCh. 4 - Prob. 85PCh. 4 - Prob. 86PCh. 4 - Prob. 87PCh. 4 - Prob. 88PCh. 4 - Prob. 89PCh. 4 - Prob. 90PCh. 4 - Prob. 91PCh. 4 - Prob. 92PCh. 4 - Prob. 93PCh. 4 - Prob. 94PCh. 4 - Prob. 95PCh. 4 - Prob. 96PCh. 4 - Prob. 97PCh. 4 - Prob. 98PCh. 4 - Prob. 99PCh. 4 - Prob. 100PCh. 4 - Prob. 101PCh. 4 - Prob. 102PCh. 4 - Prob. 103PCh. 4 - Prob. 104PCh. 4 - Prob. 105PCh. 4 - Prob. 106PCh. 4 - Prob. 107PCh. 4 - Prob. 108PCh. 4 - Prob. 109PCh. 4 - Prob. 110PCh. 4 - Prob. 111PCh. 4 - Prob. 112PCh. 4 - Prob. 113PCh. 4 - Prob. 114PCh. 4 - Prob. 115PCh. 4 - Prob. 116PCh. 4 - Prob. 117PCh. 4 - Prob. 118PCh. 4 - Prob. 119PCh. 4 - Prob. 120PCh. 4 - Prob. 121PCh. 4 - Prob. 122PCh. 4 - Prob. 123PCh. 4 - Prob. 124PCh. 4 - Prob. 125PCh. 4 - Prob. 126PCh. 4 - Prob. 127PCh. 4 - Prob. 128PCh. 4 - Prob. 129PCh. 4 - Prob. 130PCh. 4 - Prob. 131PCh. 4 - Prob. 132PCh. 4 - Prob. 133PCh. 4 - Prob. 134PCh. 4 - Prob. 135P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- In an M/MA queueing system, the arrival rate is 6 customers per hour and the service rate is 8 customers per hour.arrow_forwardApproximately 40 percent of a medical clinic’s weekly incoming calls for doctors’ appointments occur on Monday. Due to this large workload, 20 percent of the callers receive a busy signal and have to call back later. The clinic has one clerk for each two departments to handle incoming calls. Each clerk handles calls for the same departments all week and thus is familiar with the doctors’ hours, scheduling practices, and idiosyncrasies. Consider the following alternatives to solve thi problem: ∙ Continue the present system, which results in some customer inconvenience, loss of business, and perceived poor service. About 1000 patients attempt to call the clinic on Mondays. The clinic has 50,000 patients in all. ∙ Expand the phone lines and add more people to handle the peak load. The estimated cost for adding two more lines and two clerks is $60,000 per year. ∙ Install a computer to speed up appointments. In this case, the peak load could be handled with the current personnel. The…arrow_forwardYour company has a very complex conveyor system in the warehouse. The conveyors take product from a receiving dock and route them to one of ten different shipping points on the shipping dock. The conveyors are controlled by computers. You need to find an employee maintain this computer system on the night shift. Your assignment recruit an employee to fill this position. How would find a qualified candidate?arrow_forward
- CPU-on-Demand (CPUD) offers real-time high-performance computing services. CPUD owns 1 supercomputer that can be accessed through the Internet. Their customers send jobs that arrive, on average, every 5 hours. The standard deviation of the interarrival times is 5 hours. Executing each job takes on average 3 hours on the supercomputer and the standard deviation of the processing time is 4.5 hours. How long does a customer have to wait to have a job completed?arrow_forwardfi Auto mobile company manufactures cars and trucks. Each vehicle must be processed in the paint shop and body assembly shop. If the paint shop were only painting trucks, then 80 per day could be painted. If the paint shop were only painting cars, then 120 per day could be painted. If the body shop were only producing cars, then it could process 100 per day. If the body shop were only producing trucks, then it could process 100 per day. Each truck contributes GHS60,000 to profit, and each car contributes GHS40,000 to profit. Use linear programming to determine a daily production schedule that will maximize the company’s profits.arrow_forwardAn emergency room (ER) at a Prisma Health Hospital has 10 total beds it can hold patients, i.e., the capacity of the queueing system of this ER is 10. Patients arrive to the ER at a rate of 5 per hour. Therefore, we have that λn = 6 for n = 0, 1, . . . , 9 and λ10 = 0 for this queueing system. A patient is seen by an ER doctor as the ‘service’ of this queueing system. The amount of time required for an ER doctor to treat a patient is exponentially distributed with a mean of .4 hours. We seek the minimum number of ER doctors so that the expected time of a patient waiting to be seen (so the Wq) is less than or equal to 15 minutes (.25 hours). You should begin by analyzing s = 1 and show any calculations that were used to determine Wq for each number of servers that you considered until you meet the target metric.arrow_forward
- money borrowed for personal reasons; to be repaid within a specific time frame and with added interest money borrowed for the purchase of real estate; to be repaid within a specific time frame and with added interest money borrowed for business reasons; to be repaid within a specific time frame and with added interest money borrowed for the purchase of a vehicle; to be repaid within a specific time frame and with added interest : Business Loan :: Auto Loan :: Mortgage Loan :: Personal Loan 1 4 6. 8. 9. Finish Siarrow_forwardBased on Quinn et al. (1991). Winter Riggers handles approximately $400 million in telephone orders per year. Winter Riggers’ system works as follows. Callers are connected to an agent if one is available. Otherwise, they are put on hold (if a trunk line is available). A customer can hang up at any time and leave the system. Winter Riggers would like to efficiently manage the telephone system (lines and agents) used to process these orders. Of course, orders are very seasonal and depend on the time of day. a. What decisions must Winter Riggers make? b. What would be an appropriate objective for Winter Riggers to minimize (or maximize)? What difficulties do you see in specifying the objective? c. What data would Winter Riggers need to keep track of to improve its efficiency?arrow_forwardThere are two companies manufacturing drones. Company A manufactures mass market drones, while company B manufactures customised drones according to customers’ requirements. In 2020, company A produces 3,200 drones, 3% of which were found to be defective and cannot pass the quality check. Company A employs 5 workers working an average of 8 hours a day in the drone production, and they worked 200 working days in 2020.In contrast, company B produces 900 drones, 10% of which were found to be defective and cannot pass the quality check. Company B employs 3 workers working an average of 6 hours a day in the drone production, and they worked 170 days in 2020. (a) If the drone manufacturing is seen as a process, what is considered as the output of the production processes of companies A and B and why? (b) Measure the single-factor manpower productivity for the two companies. (c) Is it reasonable to compare the manpower productivity of the two companies and reach a conclusion that one company…arrow_forward
- A call center employs 1,425 agents. Every month 57 employees leave the company and 57 new employees are hired. a. How long on average does an agent work for this call center (in months) Suppose the cost of hiring and training a new agent is $1,140. The manager of this call center believes that increasing agents’ salaries would keep them working longer at the company. The manager wants to increase the average time that an agent works for the call center to 36 months, or three years. b-1. Given the current average working time for agents at this call center, determine the current annual cost for hiring and training. b-2. Assuming the average time that an agent works for the call center is increased to 36 months, determine the new annual cost for hiring and training. b-3. If the time an agent works for the call center is increased to 36 months on average, how much could the company save on hiring and training costs over a year?arrow_forwardBased on Kolesar et al. (1974), Metropolis PD Precinct 88 must determine the minimum number of police cars required to meet its needs for the next 24 hours. An average call for service requires 30minutes. The number of calls the police department expects to receive during each hour is shown in the file P12_61.xlsx. The Metropolis PD standard of service is that there should be a 90% chance that a car is avail-able to respond to a call. For each of the following,discuss how you might find a solution.a. Suppose that patrol officer teams assigned to a car work an 8-hour shift beginning at 12 a.m., 8 a.m., or 4 p.m. Officers get an hour off for a meal. This hour can be anytime between the second and fifthhour of their shift. The precinct wants to know how many teams are needed to meet daily demand.b. Suppose that patrol officer teams assigned to a car begin their 8-hour shifts at 12 a.m., 8 a.m., 12 p.m., 4 p.m., and 8 p.m. An hour off for meals may be taken anytime during a shift. The…arrow_forwardThe Decision Sciences Department is tyring to determine whether to rent a slow or fast copier. The department believes that an employee's time is worth $15/hour. The slow copier rents for $4/hr, and it takes an employee an average of 10 minutes to complete copying. The fast copier rents for $15/hr, and it takes an employee an average of 6 minutes to complete copying. On average, four employees per hour need to use the copying machine. (Assume the copying times and interarrival times to the copying machine are exponentially distributed.) Which machine should the department rent to minimize expected total cost per hour? Please note this class revolves around Microsoft Excel so the answer I need needs to show the formulas in Excel, along with any corresponding graphs, etc. Thank you in advance!arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,