Arellano Associates is a construction engineering firm that prepares detailed construction drawings for single-family homes. The market for this service is very competitive. To compete successfully Arellano must deliver quality service at low cost. Arellano presents the following data for 2019 and 2020. Engineering labor-hour costs are variable costs. Engineering support costs for each year depend on the engineering support capacity that Arellano chooses to maintain each year (that is, the number of jobs it can do each year). Engineering support costs do not vary with the actual number of jobs done in a year. Requirement 1. Calculate the amount and cost of unused engineering support capacity at the beginning of 2020, based on the number of jobs actually done in 2020. 250 jobs and the cost of unused capacity is $ 92,500 The amount of unused capacity is Requirement 2. Suppose Arellano can add or reduce its engineering support capacity in increments of 50 jobs. What is the maximum amount of costs that Arellano could save in 2020 by downsizing engineering support capacity? Arellano can reduce engineering support capacity by amount of costs Arellano can save by downsizing in 2020. It 50 jobs) because it would for a cost savings of This is the capacity to do the reduce capacity further (by another jobs in 2020. Requirements 1. Calculate the amount and cost of unused engineering support capacity at the beginning of 2020, based on the number of jobs actually done in 2020. 2. Suppose Arellano can add or reduce its engineering support capacity in increments of 50 jobs. What is the maximum amount of costs that Arellano could save in 2020 by downsizing engineering support capacity? 3. Arellano, in fact, does not eliminate any of its unused engineering support capacity. Why might Arellano not downsize? Data table - - 2019 2020 1. Number of jobs billed 2. Selling price per job 300 450 $ 3,500 $ 3,200 3. Engineering labor-hours 20,000 21,000 4. Cost per engineering labor-hour 5. Engineering support capacity (number of jobs the firm can do) 31 $ 700 32 700 6. Total cost of engineering support (space rent, equipment, etc.) $ 245,000 $ 259,000 7. Engineering support-capacity cost per job 350 $ 370 er Data table 1. Number of jobs billed 2. Selling price per job 3. Engineering labor-hours 4. Cost per engineering labor-hour 5. Engineering support capacity (number of jobs the firm can do) 6. Total cost of engineering support (space rent, equipment, etc.) 7. Engineering support-capacity cost per job 2019 2020 450 550 $ 3,700 $ 3,500 27,000 29,000 38 $ 39 750 750 225,000 $ 247,500 300 $ 330 Engineering labor-hour costs are variable costs. Engineering support costs for each year depend on the engineering support capacity that Esparzachooses to maintain each year (that is, the number of jobs it can do each year). Engineering support costs do not vary with the actual number of jobs done in a year. Reference Revenue effect of growth efore cal Ost leade The growth, price-recovery and productivity components of the change in operating income from 2019 to 2020 are as follows: $ 370,000 F shar harke e to cos e varian Cost effect of growth 228,000 U effect $ 142,000 Change in operating income due to growth F arket Growt Revenue effect of price recovery $ 110,000 U leade 5 Cost effect of price recovery 55,500 U 660 $ 165,500 ow calcu vorable Change in operating income due to price recovery U mount J).) $ 156,000 rowth in Change in operating income due to productivity F hange in Requirement Calculate how much of the change in operating income from 2019 to 2020 is due to the industry-market-size factor, product differentiation, and cost leadership. How successful has Esparza been in implementing its strategy? Explain. Print Done

Survey of Accounting (Accounting I)
8th Edition
ISBN:9781305961883
Author:Carl Warren
Publisher:Carl Warren
Chapter11: Cost-volume-profit Analysis
Section: Chapter Questions
Problem 11.2E: Identify cost graphs The following cost graphs illustrate various types of cost behavior: For each...
icon
Related questions
Question
Please calculate the change in operating income due to cost leadership. Label each component as to whether the amount has a favorable effect on operating income or unfavorable effect. (Label each variance as favorable (F) or unfavorable (U).
Arellano Associates is a construction engineering firm that
prepares detailed construction drawings for single-family
homes. The market for this service is very competitive. To
compete successfully Arellano must deliver quality service at
low cost. Arellano presents the following data for 2019 and
2020.
Engineering labor-hour costs are variable costs.
Engineering support costs for each year depend on the
engineering support capacity that Arellano chooses to
maintain each year (that is, the number of jobs it can do
each year). Engineering support costs do not vary with
the actual number of jobs done in a year.
Requirement 1. Calculate the amount and cost of unused engineering support capacity at the beginning of 2020, based on the
number of jobs actually done in 2020.
250 jobs and the cost of unused capacity is
$ 92,500
The amount of unused capacity is
Requirement 2. Suppose Arellano can add or reduce its engineering support capacity in increments of 50 jobs. What is the
maximum amount of costs that Arellano could save in 2020 by downsizing engineering support capacity?
Arellano can reduce engineering support capacity by
amount of costs Arellano can save by downsizing in 2020. It
50 jobs) because it would
for a cost savings of
This is the
capacity to do the
reduce capacity further (by another
jobs in 2020.
Requirements
1. Calculate the amount and cost of unused engineering support capacity at the
beginning of 2020, based on the number of jobs actually done in 2020.
2. Suppose Arellano can add or reduce its engineering support capacity in
increments of 50 jobs. What is the maximum amount of costs that Arellano
could save in 2020 by downsizing engineering support capacity?
3. Arellano, in fact, does not eliminate any of its unused engineering support
capacity. Why might Arellano not downsize?
Data table
-
-
2019
2020
1. Number of jobs billed
2. Selling price per job
300
450
$
3,500 $
3,200
3. Engineering labor-hours
20,000
21,000
4. Cost per engineering labor-hour
5. Engineering support capacity (number of jobs the firm can do)
31 $
700
32
700
6. Total cost of engineering support (space rent, equipment, etc.)
$
245,000 $
259,000
7. Engineering support-capacity cost per job
350 $
370
er
Transcribed Image Text:Arellano Associates is a construction engineering firm that prepares detailed construction drawings for single-family homes. The market for this service is very competitive. To compete successfully Arellano must deliver quality service at low cost. Arellano presents the following data for 2019 and 2020. Engineering labor-hour costs are variable costs. Engineering support costs for each year depend on the engineering support capacity that Arellano chooses to maintain each year (that is, the number of jobs it can do each year). Engineering support costs do not vary with the actual number of jobs done in a year. Requirement 1. Calculate the amount and cost of unused engineering support capacity at the beginning of 2020, based on the number of jobs actually done in 2020. 250 jobs and the cost of unused capacity is $ 92,500 The amount of unused capacity is Requirement 2. Suppose Arellano can add or reduce its engineering support capacity in increments of 50 jobs. What is the maximum amount of costs that Arellano could save in 2020 by downsizing engineering support capacity? Arellano can reduce engineering support capacity by amount of costs Arellano can save by downsizing in 2020. It 50 jobs) because it would for a cost savings of This is the capacity to do the reduce capacity further (by another jobs in 2020. Requirements 1. Calculate the amount and cost of unused engineering support capacity at the beginning of 2020, based on the number of jobs actually done in 2020. 2. Suppose Arellano can add or reduce its engineering support capacity in increments of 50 jobs. What is the maximum amount of costs that Arellano could save in 2020 by downsizing engineering support capacity? 3. Arellano, in fact, does not eliminate any of its unused engineering support capacity. Why might Arellano not downsize? Data table - - 2019 2020 1. Number of jobs billed 2. Selling price per job 300 450 $ 3,500 $ 3,200 3. Engineering labor-hours 20,000 21,000 4. Cost per engineering labor-hour 5. Engineering support capacity (number of jobs the firm can do) 31 $ 700 32 700 6. Total cost of engineering support (space rent, equipment, etc.) $ 245,000 $ 259,000 7. Engineering support-capacity cost per job 350 $ 370 er
Data table
1. Number of jobs billed
2. Selling price per job
3. Engineering labor-hours
4. Cost per engineering labor-hour
5. Engineering support capacity (number of jobs the firm can do)
6. Total cost of engineering support (space rent, equipment, etc.)
7. Engineering support-capacity cost per job
2019
2020
450
550
$
3,700 $
3,500
27,000
29,000
38 $
39
750
750
225,000 $
247,500
300 $
330
Engineering labor-hour costs are variable costs. Engineering support costs for each year depend on the
engineering support capacity that Esparzachooses to maintain each year (that is, the number of jobs it can
do each year). Engineering support costs do not vary with the actual number of jobs done in a year.
Reference
Revenue effect of growth
efore cal
Ost leade
The growth, price-recovery and productivity components of the change in operating
income from 2019 to 2020 are as follows:
$
370,000 F
shar
harke
e to cos
e varian
Cost effect of growth
228,000 U
effect
$
142,000
Change in operating income due to growth
F
arket
Growt
Revenue effect of price recovery
$
110,000 U
leade
5
Cost effect of price recovery
55,500
U
660
$
165,500
ow calcu
vorable
Change in operating income due to price recovery
U
mount
J).)
$
156,000
rowth in
Change in operating income due to productivity
F
hange in
Requirement
Calculate how much of the change in operating income from 2019 to 2020 is due
to the industry-market-size factor, product differentiation, and cost leadership. How
successful has Esparza been in implementing its strategy? Explain.
Print
Done
Transcribed Image Text:Data table 1. Number of jobs billed 2. Selling price per job 3. Engineering labor-hours 4. Cost per engineering labor-hour 5. Engineering support capacity (number of jobs the firm can do) 6. Total cost of engineering support (space rent, equipment, etc.) 7. Engineering support-capacity cost per job 2019 2020 450 550 $ 3,700 $ 3,500 27,000 29,000 38 $ 39 750 750 225,000 $ 247,500 300 $ 330 Engineering labor-hour costs are variable costs. Engineering support costs for each year depend on the engineering support capacity that Esparzachooses to maintain each year (that is, the number of jobs it can do each year). Engineering support costs do not vary with the actual number of jobs done in a year. Reference Revenue effect of growth efore cal Ost leade The growth, price-recovery and productivity components of the change in operating income from 2019 to 2020 are as follows: $ 370,000 F shar harke e to cos e varian Cost effect of growth 228,000 U effect $ 142,000 Change in operating income due to growth F arket Growt Revenue effect of price recovery $ 110,000 U leade 5 Cost effect of price recovery 55,500 U 660 $ 165,500 ow calcu vorable Change in operating income due to price recovery U mount J).) $ 156,000 rowth in Change in operating income due to productivity F hange in Requirement Calculate how much of the change in operating income from 2019 to 2020 is due to the industry-market-size factor, product differentiation, and cost leadership. How successful has Esparza been in implementing its strategy? Explain. Print Done
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 1 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Survey of Accounting (Accounting I)
Survey of Accounting (Accounting I)
Accounting
ISBN:
9781305961883
Author:
Carl Warren
Publisher:
Cengage Learning