Practical Management Science
6th Edition
ISBN: 9781337406659
Author: WINSTON, Wayne L.
Publisher: Cengage,
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
thumb_up100%
Chapter 6, Problem 90P
Summary Introduction
To determine: An assignment which would minimize the total cost.
Introduction: The variation between the present value of the
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
There are two companies manufacturing drones. Company A manufactures mass market drones, while company B manufactures customised drones according to customers’ requirements. In 2020, company A produces 3,200 drones, 3% of which were found to be defective and cannot pass the quality check. Company A employs 5 workers working an average of 8 hours a day in the drone production, and they worked 200 working days in 2020.In contrast, company B produces 900 drones, 10% of which were found to be defective and cannot pass the quality check. Company B employs 3 workers working an average of 6 hours a day in the drone production, and they worked 170 days in 2020.
(a) If the drone manufacturing is seen as a process, what is considered as the output of the production processes of companies A and B and why?
(b) Measure the single-factor manpower productivity for the two companies.
(c) Is it reasonable to compare the manpower productivity of the two companies and reach a conclusion that one company…
Long-Life Insurance has developed a linear model that it uses to determine the amount of term life Insurance a family of four should
have, based on the current age of the head of the household. The equation is:
y=150 -0.10x
where
y= Insurance needed ($000)
x = Current age of head of household
b. Use the equation to determine the amount of term life Insurance to recommend for a family of four of the head of the household is
40 years old. (Round your answer to 2 decimal places.)
Amount of term life insurance
thousands
A Las Vegas, Nevada, manufacturer has the option to make or buy one of its component parts. The annual requirement is 20,000 units. A supplier is able to supply the parts for $10 per piece. The firm estimates that it costs $600 to prepare the contract with the supplier. To make the parts in-house, the firm must invest $50,000 in capital equipment, and the firm estimates that it costs $8 per piece to make the parts in-house.
Assuming that cost is the only criterion, use breakeven analysis to determine whether the firm should make or buy the item.
1. What is the breakeven quantity?
2. Should the manufacturer Make or Buy?
3. What is the cost savings using your decision in number 2 (above)? Show the total cost for each scenario then the savings amount.
Chapter 6 Solutions
Practical Management Science
Ch. 6.3 - Prob. 1PCh. 6.3 - Prob. 2PCh. 6.3 - Solve Problem 1 with the extra assumption that the...Ch. 6.3 - Prob. 4PCh. 6.3 - Prob. 5PCh. 6.3 - Prob. 6PCh. 6.3 - Prob. 7PCh. 6.3 - Prob. 8PCh. 6.3 - Prob. 9PCh. 6.3 - Prob. 10P
Ch. 6.4 - Prob. 11PCh. 6.4 - Prob. 12PCh. 6.4 - Prob. 13PCh. 6.4 - Prob. 14PCh. 6.4 - Prob. 15PCh. 6.4 - Prob. 16PCh. 6.4 - Prob. 17PCh. 6.4 - Prob. 18PCh. 6.4 - Prob. 19PCh. 6.4 - Prob. 20PCh. 6.4 - Prob. 21PCh. 6.4 - Prob. 22PCh. 6.4 - Prob. 23PCh. 6.5 - Prob. 24PCh. 6.5 - Prob. 25PCh. 6.5 - Prob. 26PCh. 6.5 - Prob. 28PCh. 6.5 - Prob. 29PCh. 6.5 - Prob. 30PCh. 6.5 - In the optimal solution to the Green Grass...Ch. 6.5 - Prob. 32PCh. 6.5 - Prob. 33PCh. 6.5 - Prob. 34PCh. 6.5 - Prob. 35PCh. 6.6 - Prob. 36PCh. 6.6 - Prob. 37PCh. 6.6 - Prob. 38PCh. 6 - Prob. 39PCh. 6 - Prob. 40PCh. 6 - Prob. 41PCh. 6 - Prob. 42PCh. 6 - Prob. 43PCh. 6 - Prob. 44PCh. 6 - Prob. 45PCh. 6 - Prob. 46PCh. 6 - Prob. 47PCh. 6 - Prob. 48PCh. 6 - Prob. 49PCh. 6 - Prob. 50PCh. 6 - Prob. 51PCh. 6 - Prob. 52PCh. 6 - Prob. 53PCh. 6 - Prob. 54PCh. 6 - Prob. 55PCh. 6 - Prob. 56PCh. 6 - Prob. 57PCh. 6 - Prob. 58PCh. 6 - Prob. 59PCh. 6 - Prob. 60PCh. 6 - Prob. 61PCh. 6 - Prob. 62PCh. 6 - Prob. 63PCh. 6 - Prob. 64PCh. 6 - Prob. 65PCh. 6 - Prob. 66PCh. 6 - Prob. 67PCh. 6 - Prob. 68PCh. 6 - Prob. 69PCh. 6 - Prob. 70PCh. 6 - Prob. 71PCh. 6 - Prob. 72PCh. 6 - Prob. 73PCh. 6 - Prob. 74PCh. 6 - Prob. 75PCh. 6 - Prob. 76PCh. 6 - Prob. 77PCh. 6 - Prob. 78PCh. 6 - Prob. 79PCh. 6 - Prob. 80PCh. 6 - Prob. 81PCh. 6 - Prob. 82PCh. 6 - Prob. 83PCh. 6 - Prob. 84PCh. 6 - Prob. 85PCh. 6 - Prob. 86PCh. 6 - Prob. 87PCh. 6 - Prob. 88PCh. 6 - Prob. 89PCh. 6 - Prob. 90PCh. 6 - Prob. 91PCh. 6 - Prob. 92PCh. 6 - This problem is based on Motorolas online method...Ch. 6 - Prob. 94PCh. 6 - Prob. 95PCh. 6 - Prob. 96PCh. 6 - Prob. 97PCh. 6 - Prob. 98PCh. 6 - Prob. 99PCh. 6 - Prob. 100PCh. 6 - Prob. 1CCh. 6 - Prob. 2CCh. 6 - Prob. 3.1CCh. 6 - Prob. 3.2CCh. 6 - Prob. 3.3CCh. 6 - Prob. 3.4CCh. 6 - Prob. 3.5CCh. 6 - Prob. 3.6C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Seas Beginning sells clothing by mail order. An important question is when to strike a customer from the companys mailing list. At present, the company strikes a customer from its mailing list if a customer fails to order from six consecutive catalogs. The company wants to know whether striking a customer from its list after a customer fails to order from four consecutive catalogs results in a higher profit per customer. The following data are available: If a customer placed an order the last time she received a catalog, then there is a 20% chance she will order from the next catalog. If a customer last placed an order one catalog ago, there is a 16% chance she will order from the next catalog she receives. If a customer last placed an order two catalogs ago, there is a 12% chance she will order from the next catalog she receives. If a customer last placed an order three catalogs ago, there is an 8% chance she will order from the next catalog she receives. If a customer last placed an order four catalogs ago, there is a 4% chance she will order from the next catalog she receives. If a customer last placed an order five catalogs ago, there is a 2% chance she will order from the next catalog she receives. It costs 2 to send a catalog, and the average profit per order is 30. Assume a customer has just placed an order. To maximize expected profit per customer, would Seas Beginning make more money canceling such a customer after six nonorders or four nonorders?arrow_forwardYou have graduated from Holmes Institute with your Master of Professional Accounting degree. You are working for an accounting firm, and a client has made an appointment to see you about setting up a business. The client tells you that he is thinking about opening his own computer support business and running his business on his own from his house so that the customers can bring their laptop or PC's to his premises and then repair it. He also tells you that he is thinking about buying into a franchise called IT Support, and he asks you for advice about what is a franchise and is it a good idea? Your task is to give the client advice on what types of business structures, including franchises, would be best suitable for him. In your answer, you must provide advantages and disadvantages for each of the business structures you have suggested to him.arrow_forwardEasy Moving, a moving company, is seeking outside advice from a consultant (you) about the appropriate selection measures to use to analyze job candidates. The position that the company most often hires for is a Driver/Mover. Individuals in this job must be able to drive long hours, and lift and carry heavy objects for long periods of time. When people are moving from one home to another they contact Easy Moving to take care of relocating all of their belongings. The people responsible for the move are the Drivers/Movers. Because driving a truck is an essential function of the job, individuals must not only be physically capable of driving, but also must have an impeccable driving record. Driving a truck can be considered a safety hazard if the individuals were not in the right frame of mind to be a good driver. Easy Moving should keep these things in mind when analyzing applicants. Additionally, individuals applying for a Driver/Mover position with Easy Moving must have the physical…arrow_forward
- Consider the following relational database for Happy Cruise Lines. It keeps track of ships, cruises, ports, and passengers. A ''cruise'' is a particular sailing of a ship on a particular date. For example, the seven-day journey of the ship Pride of Tampa that leaves on June 13, 2009, is a cruise. Note the following facts about this environment.arrow_forwardSuppose you are running a construction company and are in the process of signing a new contract with a lumber supplier. Getting lumber to a work site on time is critical and based on two things. First is the effort exerted by the lumber supplier and second how fast the shipper of the lumber will get the lumber to the construction site which involves some randomness. The lumber supplier can exert a high or low level of effort. If they exert a high level of effort they will produce the lumber quickly and there is then a 75% chance the shipper can get it to the construction site on time, and only a 25% chance that the shipper will be slow, and the lumber will arrive late. If the lumber supplier exerts a low level of effort, they will take a long time to produce the lumber and there is no chance that it will ship on time. If the lumber supplier exerts low effort it costs them zero dollars, but if high effort is exerted then it costs six thousand dollars in extra resources. The lumber…arrow_forwardA call center employs 1,425 agents. Every month 57 employees leave the company and 57 new employees are hired. a. How long on average does an agent work for this call center (in months) Suppose the cost of hiring and training a new agent is $1,140. The manager of this call center believes that increasing agents’ salaries would keep them working longer at the company. The manager wants to increase the average time that an agent works for the call center to 36 months, or three years. b-1. Given the current average working time for agents at this call center, determine the current annual cost for hiring and training. b-2. Assuming the average time that an agent works for the call center is increased to 36 months, determine the new annual cost for hiring and training. b-3. If the time an agent works for the call center is increased to 36 months on average, how much could the company save on hiring and training costs over a year?arrow_forward
- The following data structure and constraints exist for a magazine publishing company:a. The company publishes one regional magazine in each of four states: Florida (FL), South Carolina (SC), Georgia (GA), and Tennessee (TN).b. The company has 300,000 customers (subscribers) distributed throughout the four states listed in Problem 2a.c. On the first day of each month, an annual subscription INVOICE is printed and sent to each customer whose subscription is due for renewal. The INVOICE entity contains a REGION attribute to indicate the customer's state of residence (FL, SC, GA, TN):The company is aware of the problems associated with centralized management and has decided to decentralize management of the subscriptions into the company's four regional subsidiaries. Each subscription site will handle its own customer and invoice data. The management at company headquarters, however, will have access to customer and invoice data to generate annual reports and to issue ad hoc queries such…arrow_forwardManufacturing operations can be classified according to the amount of processing or assembly that occurs after a customer order is received. The highest degree of processing occurs in make-to-order operations. A make-to-order operation does not start processing or assembling products until it receives a customer order. A moderate degree of processing occurs in assemble-to-order operations. A company using an assemble-to-order operation divides its manufacturing or assembly process into separate parts or modules. The lowest degree of processing occurs in make-to-stock operations (also called Because the products are standardized, meaning each product is exactly the same as the next, a company using a make-to-stock operation starts ordering parts and assembling finished products before receiving customer orders. A second way to categorize manufacturing operations is by manufacturing flexibility, meaning the degree to which manufacturing operations can easily and quickly change the…arrow_forwardAn experiment is to be performed to determine the effectiveness of a new product promotion program. The experiment will be used to compare four different promotion techniques. Each customer will be exposed to only one of the four promotions. Customers from five different geographical regions will be considered. Customers will also be divided up into three categories by size as determined from annual sales. Customers can be exposed to their program for either three or six months. How many different configurations are there in this experiment?arrow_forward
- A company makes four products that have the following characteristics: Product A sells for $75 but needs $40 of materials to produce; Product B sells for $90 but needs $65 of materials to produce; Product C sells for $110 but needs $80 of materials to produce; Product D sells for $135 but needs $105 of materials to produce. The processing requirements for each product on each of the four machines are shown in the table. Work centers W, X, Y, and Z are available for 5 days per week, 1 shift per day (8 hrs.) and have no setup time when switching between products. Market demand is 50 As, 60 Bs, 70 Cs, and 80 Ds per week. In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product. Each worker is paid $15 per hour and is paid for an entire week, regardless of how much the worker is used. Answer the following…arrow_forwardA manufacturing firm has four plants and wants to find the most efficient means of meeting the requirements of its four customers. The relevant information for the plants and customers, along with shipping costs in dollars per unit, are shown in the table below: Customer (requirement) Factory (capacity) Customer 1 (125) Customer 2 (150) Customer 3 (175) Customer 4 (75) A (100) $ 15 $ 10 $ 20 $ 17 B (75) $ 20 $ 12 $ 19 $ 20 C (100) $ 22 $ 20 $ 25 $ 14 D (250) $ 21 $ 15 $ 28 $ 12 Note: This question requires Solver.Formulate the problem in Solver and find the optimal solution. What is the optimal quantity to ship from Factory B to Customer 3? Multiple Choice 25 units 50 units 75 units 100 units 125 unitsarrow_forwardA manufacturing firm has four plants and wants to find the most efficient means of meeting the requirements of its four customers. The relevant information for the plants and customers, along with shipping costs in dollars per unit, are shown in the table below: Customer (requirement) Factory (capacity) Customer 1 (125) Customer 2 (150) Customer 3 (175) Customer 4 (75) A (100) $ 15 $ 10 $ 20 $ 17 B (75) $ 20 $ 12 $ 19 $ 20 C (100) $ 22 $ 20 $ 25 $ 14 D (250) $ 21 $ 15 $ 28 $ 12 How many supply nodes are present in this problem? Multiple Choice: 4 3 1 8 16arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,