Chapter 6.6, Problem 38P
Summary Introduction
To determine: The way to cut the coils into various widths to meet its necessity at minimal cost.
Introduction: The variation between the present value of the
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A tire factory wants to set a minimum mileage
guarantee on its tyre. Tyre tests reveals that the
mean mileage has a normal distribution with
mean 128 and standard deviation 1.76.
the manufacturer wants to set the minimum
guaranteed mileage so that no more than 2.5
percent of tyres will have to be replaced.
The Lower limit of guaranteed mileage is :?
(Write your answer in 2 decimals
places)
The Decision Sciences Department is trying to determine whether to rent a slow or a fast
copier. The department believes that an employee's time is worth $15 per hour. The slow
copier rents for $4 per hour, and it takes an employee an average of 10 minutes to
complete copying. The fast copier rents for $15 per hour, and it takes an employee an
average of six minutes to complete copying. On average, four employees per hour need to
use the copying machine. (Assume the copying times and interarrival times to the
copying machine are exponentially distributed.) Which machine should the department
rent to minimize expected total cost per hour?
Worst to slow copier.
Better to slow copier.
Worst to fast copier.
Better to slow copier.
A)
B)
C)
D)
Answer
O A
D
The Decision Sciences Department is trying to determine whether to rent a slow or a fast copier. The department believes that an employee’s time is worth $15 per hour. The slow copier rents for $4 per hour, and it takes an employee an average of 10 minutes to complete copying. The fast copier rents for $15 per hour, and it takes an employee an average of six minutes to complete copying. On average, four employees per hour need to use the copying machine. (Assume the copying times and interarrival times to the copying machine are exponentially distributed.) Which machine shouldthe department rent to minimize expected total cost per hour?
Chapter 6 Solutions
Practical Management Science
Ch. 6.3 - Prob. 1PCh. 6.3 - Prob. 2PCh. 6.3 - Solve Problem 1 with the extra assumption that the...Ch. 6.3 - Prob. 4PCh. 6.3 - Prob. 5PCh. 6.3 - Prob. 6PCh. 6.3 - Prob. 7PCh. 6.3 - Prob. 8PCh. 6.3 - Prob. 9PCh. 6.3 - Prob. 10P
Ch. 6.4 - Prob. 11PCh. 6.4 - Prob. 12PCh. 6.4 - Prob. 13PCh. 6.4 - Prob. 14PCh. 6.4 - Prob. 15PCh. 6.4 - Prob. 16PCh. 6.4 - Prob. 17PCh. 6.4 - Prob. 18PCh. 6.4 - Prob. 19PCh. 6.4 - Prob. 20PCh. 6.4 - Prob. 21PCh. 6.4 - Prob. 22PCh. 6.4 - Prob. 23PCh. 6.5 - Prob. 24PCh. 6.5 - Prob. 25PCh. 6.5 - Prob. 26PCh. 6.5 - Prob. 28PCh. 6.5 - Prob. 29PCh. 6.5 - Prob. 30PCh. 6.5 - In the optimal solution to the Green Grass...Ch. 6.5 - Prob. 32PCh. 6.5 - Prob. 33PCh. 6.5 - Prob. 34PCh. 6.5 - Prob. 35PCh. 6.6 - Prob. 36PCh. 6.6 - Prob. 37PCh. 6.6 - Prob. 38PCh. 6 - Prob. 39PCh. 6 - Prob. 40PCh. 6 - Prob. 41PCh. 6 - Prob. 42PCh. 6 - Prob. 43PCh. 6 - Prob. 44PCh. 6 - Prob. 45PCh. 6 - Prob. 46PCh. 6 - Prob. 47PCh. 6 - Prob. 48PCh. 6 - Prob. 49PCh. 6 - Prob. 50PCh. 6 - Prob. 51PCh. 6 - Prob. 52PCh. 6 - Prob. 53PCh. 6 - Prob. 54PCh. 6 - Prob. 55PCh. 6 - Prob. 56PCh. 6 - Prob. 57PCh. 6 - Prob. 58PCh. 6 - Prob. 59PCh. 6 - Prob. 60PCh. 6 - Prob. 61PCh. 6 - Prob. 62PCh. 6 - Prob. 63PCh. 6 - Prob. 64PCh. 6 - Prob. 65PCh. 6 - Prob. 66PCh. 6 - Prob. 67PCh. 6 - Prob. 68PCh. 6 - Prob. 69PCh. 6 - Prob. 70PCh. 6 - Prob. 71PCh. 6 - Prob. 72PCh. 6 - Prob. 73PCh. 6 - Prob. 74PCh. 6 - Prob. 75PCh. 6 - Prob. 76PCh. 6 - Prob. 77PCh. 6 - Prob. 78PCh. 6 - Prob. 79PCh. 6 - Prob. 80PCh. 6 - Prob. 81PCh. 6 - Prob. 82PCh. 6 - Prob. 83PCh. 6 - Prob. 84PCh. 6 - Prob. 85PCh. 6 - Prob. 86PCh. 6 - Prob. 87PCh. 6 - Prob. 88PCh. 6 - Prob. 89PCh. 6 - Prob. 90PCh. 6 - Prob. 91PCh. 6 - Prob. 92PCh. 6 - This problem is based on Motorolas online method...Ch. 6 - Prob. 94PCh. 6 - Prob. 95PCh. 6 - Prob. 96PCh. 6 - Prob. 97PCh. 6 - Prob. 98PCh. 6 - Prob. 99PCh. 6 - Prob. 100PCh. 6 - Prob. 1CCh. 6 - Prob. 2CCh. 6 - Prob. 3.1CCh. 6 - Prob. 3.2CCh. 6 - Prob. 3.3CCh. 6 - Prob. 3.4CCh. 6 - Prob. 3.5CCh. 6 - Prob. 3.6C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- The Decision Sciences Department is tyring to determine whether to rent a slow or fast copier. The department believes that an employee's time is worth $15/hour. The slow copier rents for $4/hr, and it takes an employee an average of 10 minutes to complete copying. The fast copier rents for $15/hr, and it takes an employee an average of 6 minutes to complete copying. On average, four employees per hour need to use the copying machine. (Assume the copying times and interarrival times to the copying machine are exponentially distributed.) Which machine should the department rent to minimize expected total cost per hour? Please note this class revolves around Microsoft Excel so the answer I need needs to show the formulas in Excel, along with any corresponding graphs, etc. Thank you in advance!arrow_forwardIn an oil company, its south refinery produces per day 300 barrels of high grade oil, 200 barrels of medium grade oil and 150 barrels of low grade oil. The cost of operation of this refinery amounts to P 600,000 per day. The north refinery of the company produces each day 100 barrels of high grade oil and 100 barrels of medium-grade oil and 150 of low-grade oil. Which has a total of P500,000 operational costs. If the company’s production requirement is at least 900 barrels for high-grade oil, 800 barrels for medium-grade oil, and 750 for low-grade oil, how many days, are required for each refinery to operate to obtain the minimum cost?arrow_forwardJohn Hospital contains 450 beds. The average occupancy rate is 80% per month. In other words, on average, 80% of the hospital’s beds are occupied by patients. At this level of occupancy, the hospital’s operating costs are P56 per occupied bed per day, assuming a 30-day month. This P56 figures contains both variable and fixed cost components. During the month of June, the hospital’s occupancy rate was only 60%. A total of P571,725 in operating costs was incurred during that month. Using the high low method, the amount of variable cost per occupied bed per day is?arrow_forward
- 2. An infinite sheet of uniform charge ps (C/m^2) is placed at z=0. Use Gauss' law to calculate the electric field at a distance z created by the sheet.arrow_forwardA company owns a 5-year-old turret lathe that has a book value of $23,000. The present market value for the lathe is $18,000. The expected decline in market value is $1,700/year to a minimum market value of $4,080; maintenance plus operating costs for the lathe equal $4,470/year.A new turret lathe can be purchased for $46,000 and will have an expected life of 8 years. The market value for the turret lathe is expected to equal $46,000(0.70)k at the end of year k. Annual maintenance and operating cost is expected to equal $1,900. Based on a 12% MARR, should the old lathe be replaced now? Use an equivalent uniform annual cost comparison, a planning horizon of 7 years, and the cash flow approach.EUAC for keeping old turret lathe: $EUAC for replacing turret lathe: $arrow_forwardCWD Electronics sells Televisions (TV), which it orders from the USA. Because of shipping and handling costs, each order must be for 10 TVs. Because of the time it takes to receive an order, the company places an order every time the present stock drops to 5 TVs. It costs $50 to place an order. It costs the company $200 in lost sales when a customer asks for a TV and the warchouse is out of stock. It costs $50 to keep each TV stored in the warehouse. If a customer cannot purchase a TV when it is requested, the customer will not wait until one comes in but will go to a competitor. The following probability distribution for demand for TV has been and the time required to recæive an order once it is placed (lead time) has the following probability distribution: Lead time (weeks) Probability Demand/ week Probability 0.45 0.15 2 0.30 025 0.25 3 0.40 020 The company has 10 TVs in stock. Orders are always received at the beginning of the week. Note that a lead time of 2 weeks imply that an…arrow_forward
- a. Which of the following best describes the meaning of the equation P(25) = 200? 1. When 200 calculators are sold, the profit is $25. II. When 200 calculators are sold, the profit is increasing at a rate of $25 per additional calculator III. When 25 calculators are sold, the profit is $200. IV. When 25 calculators are sold, the profit is increasing at a rate of $200 per additional calculatoarrow_forwardA roller coaster is being designed for a new theme park. Two "trains" are on the track at any given time. One train is being unloaded/reloaded while the other is moving along the track. The track itself takes 10 minutes to complete. The train being loaded should depart before the arriving train is no closer than one minute away. Each car of a train accommodates four people. Loading a car is estimated to take 6 seconds per passenger. Unloading is estimated to take 6 seconds per passenger. Suppose that (unlike actual roller coasters), only one car can be loaded or unloaded at a time. Unloading can NOT occur at the same time as loading. In order to maximize the number of potential passengers, how many cars should the train be made up of? Round your answer to the nearest whole car.arrow_forwardFRUIT COMPUTER COMPANY Fruit Computer Company manufactures memory chips in batches of ten chips. From past experience, Fruit knows that 80% of all batches contain 10% (1 out of 10) defective chips, and 20% of all batches contain 50% (5 out of 10) defective chips. If a good (that is, 10% defective) batch of chips is sent to the next stage of production, processing costs of $4000 are incurred, and if a bad batch (50% defective) is sent on to the next stage of production, processing costs of $16000 are incurred. Fruit also has the alternative of reworking a batch at a cost of $4000. A reworked batch is sure to be a good batch. Alternatively, for a cost of $400, Fruit can test one chip from each batch in an attempt to determine whether the batch is defective. QUESTIONS 1.Determine a strategy so Fruit can minimize the expected total cost per batch. 2.Compute the EVSI and EVPI.arrow_forward
- Suppose on a road trip to Texas you observe that three out of every four trucks on the road are followed by a car, while only one out of every five cars is followed by a truck. What fraction of vehicles on the road are trucks?arrow_forwardThe following data relate the sales figure of the bar in Mark Kaltenbach's small bed- and -breakfast inn in portland, to the number of guest registered that week: week guests bar sales 1 16 $320 2 12 $265 3 18 $390 4 14 $315 a) the simple linear equation that relates bar sales to the number of guests ( not totime) is (round your response to one decimal place) Bar sales=[__]+[__]X guestarrow_forwardA manufacturer of two products (Widgets and Gadgets) makes a profit of $140 for each widget sold and $200 for each gadget sold. However, production of these products generates hazardous waste charges at the rate of 1w (where W is the number of Widgets produced) and 26 (where G is the number of Gadgets produced). The manufacturer has ample supplies of all raw materials and can sell all the Widgets and Gadgets it produces. The firm has sufficient capacity to produce any realistic quantity of both products. What is the optimal quantity of each product to produce? (Round your answers to 1 decimal place.) Widgets and Gadgets What is the maximum profit the manufacturer can earn? (Round your answer to 2 decimal places.) Maximum profit 2 of 5 ASUSarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,