Time between job arrivals at a machining station is exponentially distributed with mean 4.4 minutes. There are 2 types of jobs to be processed 30% of which is Type 1 and, 70% are of Type 2. Processing times are exponentially distributed. Mean processing time for Type 1 is 4.8 minutes, for Type 2 it is 2.5 minutes. After the job is processed, they go through an inspection process with one single inspector and an inspection time with triangular distribution (1,2,3.5). Inspector decides whether the part is good enough, scrap or should be reworked. 80% of the parts produced is good, 10% is scrap and the rest needs rework. Rework is done by the same manufacturing machine. The priority among the parts will be Part1 first, part2 second and reworks of both type comes later. Rework time is normally distributed with mean 2 minutes and 0,2 std dev. Simulate the system for one 8-hour day.

Precision Machining Technology (MindTap Course List)
2nd Edition
ISBN:9781285444543
Author:Peter J. Hoffman, Eric S. Hopewell, Brian Janes
Publisher:Peter J. Hoffman, Eric S. Hopewell, Brian Janes
Chapter2: Measurement, Materials, And Safety
Section2.5: Quality Assurance, Process Planning, And Quality Control
Problem 10RQ: If an X-bar chart graph falls below the LCL or rises above the UCL, a machining process is said to...
icon
Related questions
Question
Basic Manufacturing Process with 2 Job Types +
Inspection
Time between job arrivals at a machining station is exponentially distributed with mean 4.4 minutes.
There are 2 types of jobs to be processed 30% of which is Type 1 and, 70% are of Type 2. Processing
times are exponentially distributed. Mean processing time for Type 1 is 4.8 minutes, for Type 2 it is
2.5 minutes.
After the job is processed, they go through an inspection process with one single inspector and an
inspection time with triangular distribution (1,2,3.5). Inspector decides whether the part is good
enough, scrap or should be reworked. 80% of the parts produced is good, 10 % is scrap and the rest
needs rework.
Rework is done by the same manufacturing machine. The priority among the parts will be Part1 first,
part2 second and reworks of both type comes later. Rework time is normally distributed with mean 2
minutes and 0,2 std dev.
Simulate the system for one 8-hour day.
Transcribed Image Text:Basic Manufacturing Process with 2 Job Types + Inspection Time between job arrivals at a machining station is exponentially distributed with mean 4.4 minutes. There are 2 types of jobs to be processed 30% of which is Type 1 and, 70% are of Type 2. Processing times are exponentially distributed. Mean processing time for Type 1 is 4.8 minutes, for Type 2 it is 2.5 minutes. After the job is processed, they go through an inspection process with one single inspector and an inspection time with triangular distribution (1,2,3.5). Inspector decides whether the part is good enough, scrap or should be reworked. 80% of the parts produced is good, 10 % is scrap and the rest needs rework. Rework is done by the same manufacturing machine. The priority among the parts will be Part1 first, part2 second and reworks of both type comes later. Rework time is normally distributed with mean 2 minutes and 0,2 std dev. Simulate the system for one 8-hour day.
Expert Solution
steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Knowledge Booster
Automation of Manufacturing Processes
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Precision Machining Technology (MindTap Course Li…
Precision Machining Technology (MindTap Course Li…
Mechanical Engineering
ISBN:
9781285444543
Author:
Peter J. Hoffman, Eric S. Hopewell, Brian Janes
Publisher:
Cengage Learning