Material conditional

Sort By:
Page 12 of 50 - About 500 essays
  • Better Essays

    solution and strategies to Gorilla Health Bars Pty Ltd and at the same time provide recommendations for future considerations. Scope of investigation Access relevant information from available number of sources, the company itself and other learning materials. Methodology Analyze all learning resources and academic journals with the sole purpose of finding sustainable solutions to the company’s current problems. Findings Present a range of sustainable solutions to the manager for consideration Right away

    • 764 Words
    • 4 Pages
    Better Essays
  • Decent Essays

    significant amount and this would decrease the company’s raw material purchases, sales volume, production and profit:  The raw material purchases would be affected as with the same amount of money used in purchasing the materials, less number of raw materials could be purchased, for example: if we the material cost per unit is $4 and we purchase raw materials of $1,000,000, we can produce 250,000 units (1,000,000/4). Whereas if the material cost increases to $6, we would only be able to produce

    • 1125 Words
    • 5 Pages
    Decent Essays
  • Better Essays

    product zones. • Documented visual inspection after cleaning. Verify all validated cleaning parameters (time, temperature, flow, concentration of detergents) are met. • Flushing: Quality clean before and validated quantity of flushing material (inert non-allergic materials or product) • Use of vacuum cleaning rather than air hoses/compressed air. • Dedicated cleaning tools / cleaning tools program. 11.2 Cleaning Methods • Wet cleaning • Dry cleaning • Flushing 11.3 Validation and verification of

    • 1504 Words
    • 7 Pages
    Better Essays
  • Satisfactory Essays

    they need a lot of raw materials to produce the snacks. The basic ingredients in producing the snack are nuts, flour, sugar, oil and other seasonings (Refer to Appendices 3.2, 3.3). According to Ms Chan, the quality of the raw materials is the most important criteria when Sin Thai Guan Company selecting and eveluating the suppliers. Since Sin Thai Guan Company has operated for so many years, they know the suppliers in the industry and they are clear with the raw materials that provided by each suppliers

    • 704 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    1. INTRODUCTION PT Adaro Indonesia is one of the largest coal mining companies in Indonesia. Since those early days, the Tabalong mine has grown to be the southern hemisphere’s largest single-mine site, and production has grown from an initial 1 million tons in 1992, with some years recording extraordinary growth. In 2006, for example, Adaro Indonesia increased production by more than 28% from the previous year to 34.4 million tons. And it has product called "Envirocoal" to be marketed in the world

    • 1730 Words
    • 7 Pages
    Good Essays
  • Decent Essays

    Strengths Of IKEA

    • 794 Words
    • 4 Pages

    appliances for homes and business offices. The company has also introduced home building materials where customers can use reasonable priced and environmental friendly materials to build their IKEA home. The worldwide market presence and strong brand image and reputation have contributed to its hold on customers and market share. II) Low cost structure Low prices and cost structure is the

    • 794 Words
    • 4 Pages
    Decent Essays
  • Decent Essays

    INTRODUCTION Materials Requirement Planning (MRP) is one of the integral production control techniques used in Enterprise resource planning(ERP). It calculates the net requirements for materials based on its dependence on other materials and develop procurement proposals which are often in the form of purchase requisitions and planned orders. The MRP creates planned orders for all finished and semi-finished products and aims to make sure that the company has sufficient availability of material to meet

    • 1768 Words
    • 8 Pages
    Decent Essays
  • Better Essays

    part only if you don’t see do anything in the SAP system. Let me show you how we are going to proceed, there are 13 main tasks in total, in which various there are numerous sub tasks involved such as creation of purchase requisition using a Raw Material, then will use Semi-Finished product and then finished goods. Our second task is creation of a reference purchasing order using purchase requisition that we are going to generate using Raw Mat, WIP and Finished Goods. Then we will move to the third

    • 1943 Words
    • 8 Pages
    Better Essays
  • Decent Essays

    Trade off examinations are required to choose if structures using low-thickness, high-quality basic materials that require ensuring or ablative materials to secure them are lighter or more volumetrically capable than those using high-thickness, low-quality materials that don't require warm insurance. 2.2.4 Launching requirements Propelling frameworks force dimensional limitations on rocket plans. For future surface-to-surface, territory guard, and wide-region resistance rockets, the essential launcher

    • 1283 Words
    • 6 Pages
    Decent Essays
  • Satisfactory Essays

    semi-finished part, and raw materials. Deliverables: 1) Record observed data where requested, 2) Screen captures where requested, 3) record configuration data (Task 4, step 10), and 4) answers to discussion questions. Task 1 – View sample MM and collect data. 1. In the Display Material T-F101 (Finished Product) screen view and record the following data: EMBED YOUR DATA INTO THE DELIVERABLE DOCUMENT YOUR PROFESSOR HAS PROVIDED FOR YOU. a. Basic Data 1 – Material Description ___Pump PRECISION

    • 621 Words
    • 3 Pages
    Satisfactory Essays