Question
Chapter 9.5, Problem 9E
To determine
To find:
The completion time.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
please refer to the pictures and answer part a, b, c. thank you so much.
Question 3.
Develop a solution for the following line balancing problem, allowing
a cycle time of 5 minutes.
a) Calculate the theoretical minimum number of workstations.
b) Use the longest task time approach to Assign tasks to work
c) Does the solution have the minimum number of stations? Explain.
d) How much idle time is there?
e) What is the efficiency of this line?
Work Task
Task Time (seconds) Task Predecessor(s)
A
70
B
60
A
C
120
B
D
60
E
240
С, D
F
100
A
190
E, F
ds
EV
1. Construct a table showing:
Normal
LE English (Australia)
No Spacing
Heading 1
Accessibility: Investigate
Heading 2
AdBOAaBb CcDdEt
Subtitle
The Adelaide University Judo Club offers 2 fitness programs to enhance player fitness performance leading up for the upcoming
regional championships in 12 weeks.
Title
In programme A, Coach A coaches for a period of 2 hours on the components of endurance and agility, Coach B coaches for power
and speed training for 4 hours and Coach C coaches for coordination and balance for 2 hours.
In programme B, Coach A 6 hours of training, Coach B trains for 3 hours and Coach C trains for 4 hours.
Coach A is available for a minimum of 10 hours and a maximum of 36 hours.
Coach B is limited to train for a maximum of 24 hours whereas Coach C is contracted to train for a minimum of 8 hours.
Program A costs $75 per session and program B costs $125 per session.
The head coach aims to minimise the cost while satisfying the requirements of the three coaches…
Chapter 9 Solutions
MATHEMATICS A PRACTICAL ODYSSEY W/ACCESS
Ch. 9.1 - In Exercises 1 3, use the following information:...Ch. 9.1 - In Exercises 1 3, use the following information:...Ch. 9.1 - Prob. 3ECh. 9.1 - Prob. 4ECh. 9.1 - Prob. 5ECh. 9.1 - Prob. 6ECh. 9.1 - In exercise 7-10, determine the number of...Ch. 9.1 - Prob. 8ECh. 9.1 - In exercise 7-10, determine the number of...Ch. 9.1 - Prob. 10E
Ch. 9.1 - Prob. 11ECh. 9.1 - a. Determine the number of vertices, edges and...Ch. 9.1 - Prob. 13ECh. 9.1 - Prob. 14ECh. 9.1 - a. Why do the two diagrams in Figure 9.10...Ch. 9.1 - Prob. 16ECh. 9.1 - Prob. 17ECh. 9.1 - Prob. 18ECh. 9.1 - Prob. 19ECh. 9.1 - Prob. 20ECh. 9.2 - In Exercise 1-6, do the following: a. Find two...Ch. 9.2 - Prob. 2ECh. 9.2 - Prob. 3ECh. 9.2 - Prob. 4ECh. 9.2 - Prob. 5ECh. 9.2 - Prob. 6ECh. 9.2 - Exercise 7-12, can be done as homework problem or...Ch. 9.2 - Exercise 7-12, can be done as homework problem or...Ch. 9.2 - Prob. 9ECh. 9.2 - Prob. 10ECh. 9.2 - Exercise 7-12, can be done as homework problem or...Ch. 9.2 - Exercise 7-12, can be done as homework problem or...Ch. 9.2 - Prob. 13ECh. 9.2 - Prob. 14ECh. 9.2 - Prob. 15ECh. 9.2 - Prob. 16ECh. 9.2 - Prob. 17ECh. 9.2 - Prob. 18ECh. 9.2 - Prob. 19ECh. 9.2 - Prob. 20ECh. 9.2 - Prob. 21ECh. 9.2 - 22. Once a month, the utility company sends an...Ch. 9.2 - Prob. 23ECh. 9.2 - Prob. 24ECh. 9.2 - Figure shows a map of New Yorks cities and bridges...Ch. 9.2 - Prob. 26ECh. 9.2 - Prob. 27ECh. 9.2 - Prob. 28ECh. 9.2 - Figure 9.7 on page 673 shows a map of the BART Bay...Ch. 9.2 - Prob. 30ECh. 9.2 - Prob. 31ECh. 9.2 - Prob. 32ECh. 9.2 - Prob. 35ECh. 9.3 - Prob. 1ECh. 9.3 - Prob. 2ECh. 9.3 - Prob. 3ECh. 9.3 - Exercise 1-4, use the flight costs shown in...Ch. 9.3 - Prob. 5ECh. 9.3 - Exercises 5-12 use the FedEx travel times shown in...Ch. 9.3 - Prob. 7ECh. 9.3 - Prob. 8ECh. 9.3 - Prob. 9ECh. 9.3 - Prob. 10ECh. 9.3 - Prob. 11ECh. 9.3 - Prob. 12ECh. 9.3 - Prob. 13ECh. 9.3 - Prob. 14ECh. 9.3 - Prob. 15ECh. 9.3 - Use the following information in Exercises 13-22....Ch. 9.3 - Prob. 17ECh. 9.3 - Prob. 18ECh. 9.3 - Prob. 19ECh. 9.3 - Prob. 20ECh. 9.3 - Prob. 21ECh. 9.3 - Prob. 22ECh. 9.3 - Prob. 23ECh. 9.3 - Prob. 24ECh. 9.3 - Use the information in Figure 9.55 and the...Ch. 9.3 - Prob. 26ECh. 9.3 - Use the information in Figure 9.55 and the...Ch. 9.3 - Prob. 28ECh. 9.3 - Prob. 29ECh. 9.3 - Prob. 30ECh. 9.3 - Prob. 31ECh. 9.4 - Prob. 1ECh. 9.4 - Prob. 2ECh. 9.4 - Prob. 3ECh. 9.4 - Prob. 4ECh. 9.4 - Prob. 5ECh. 9.4 - Prob. 6ECh. 9.4 - Prob. 7ECh. 9.4 - Prob. 8ECh. 9.4 - Prob. 9ECh. 9.4 - Prob. 10ECh. 9.4 - Prob. 11ECh. 9.4 - Prob. 12ECh. 9.4 - Prob. 13ECh. 9.4 - Prob. 14ECh. 9.4 - Prob. 15ECh. 9.4 - Prob. 16ECh. 9.4 - Prob. 17ECh. 9.4 - Prob. 18ECh. 9.4 - Prob. 19ECh. 9.4 - Prob. 20ECh. 9.4 - Prob. 21ECh. 9.4 - Prob. 22ECh. 9.4 - Prob. 23ECh. 9.4 - Prob. 24ECh. 9.4 - Prob. 25ECh. 9.4 - Prob. 26ECh. 9.4 - Prob. 27ECh. 9.4 - Prob. 28ECh. 9.4 - Prob. 29ECh. 9.4 - Prob. 30ECh. 9.4 - Prob. 31ECh. 9.4 - Prob. 32ECh. 9.4 - Prob. 33ECh. 9.4 - Prob. 34ECh. 9.4 - Prob. 35ECh. 9.4 - Prob. 36ECh. 9.4 - Prob. 37ECh. 9.4 - Prob. 38ECh. 9.4 - Prob. 39ECh. 9.4 - Prob. 40ECh. 9.4 - Prob. 41ECh. 9.4 - Prob. 42ECh. 9.4 - Prob. 43ECh. 9.4 - Prob. 44ECh. 9.4 - Prob. 45ECh. 9.4 - Prob. 46ECh. 9.4 - Prob. 47ECh. 9.4 - Prob. 48ECh. 9.4 - Prob. 49ECh. 9.4 - Prob. 50ECh. 9.4 - Prob. 51ECh. 9.4 - Prob. 52ECh. 9.4 - Prob. 53ECh. 9.4 - Prob. 54ECh. 9.4 - Prob. 55ECh. 9.4 - Prob. 56ECh. 9.4 - Prob. 57ECh. 9.4 - Prob. 58ECh. 9.4 - Prob. 59ECh. 9.4 - Prob. 60ECh. 9.5 - Prob. 1ECh. 9.5 - Prob. 2ECh. 9.5 - Prob. 3ECh. 9.5 - Prob. 4ECh. 9.5 - Prob. 5ECh. 9.5 - Prob. 6ECh. 9.5 - Prob. 7ECh. 9.5 - Exercises 8-14 involve the information in Figure...Ch. 9.5 - Prob. 9ECh. 9.5 - Exercises 8-14 involve the information in Figure...Ch. 9.5 - Prob. 11ECh. 9.5 - Exercises 8-14 involve the information in Figure...Ch. 9.5 - Prob. 13ECh. 9.5 - Prob. 14ECh. 9.5 - Exercises 15-21 involve the information in Figure...Ch. 9.5 - Prob. 16ECh. 9.5 - Prob. 17ECh. 9.5 - Prob. 18ECh. 9.5 - Prob. 19ECh. 9.5 - Prob. 20ECh. 9.5 - Prob. 21ECh. 9.5 - Prob. 22ECh. 9.5 - Prob. 23ECh. 9.5 - Prob. 24ECh. 9.5 - Prob. 25ECh. 9.5 - Prob. 26ECh. 9.5 - Prob. 27ECh. 9.5 - Prob. 28ECh. 9.5 - Prob. 29ECh. 9.5 - Prob. 30ECh. 9.5 - Prob. 31ECh. 9.5 - Prob. 32ECh. 9.5 - Prob. 33ECh. 9.5 - Prob. 34ECh. 9.5 - Prob. 35ECh. 9.CR - In Exercises 1-6, do the following: a. Determine...Ch. 9.CR - Prob. 2CRCh. 9.CR - Prob. 3CRCh. 9.CR - Prob. 4CRCh. 9.CR - Prob. 5CRCh. 9.CR - Prob. 6CRCh. 9.CR - Prob. 7CRCh. 9.CR - Prob. 8CRCh. 9.CR - Prob. 9CRCh. 9.CR - Prob. 10CRCh. 9.CR - Prob. 11CRCh. 9.CR - Prob. 12CRCh. 9.CR - Prob. 13CRCh. 9.CR - Prob. 14CRCh. 9.CR - Prob. 15CRCh. 9.CR - Prob. 16CRCh. 9.CR - Prob. 17CRCh. 9.CR - Prob. 18CRCh. 9.CR - Prob. 19CRCh. 9.CR - Prob. 20CRCh. 9.CR - Prob. 21CRCh. 9.CR - Prob. 22CRCh. 9.CR - Prob. 23CRCh. 9.CR - Prob. 24CRCh. 9.CR - Prob. 25CRCh. 9.CR - Prob. 26CRCh. 9.CR - Exercises 2531 use the flight costs shown in...Ch. 9.CR - Exercises 2531 use the flight costs shown in...Ch. 9.CR - Prob. 29CRCh. 9.CR - Prob. 30CRCh. 9.CR - You live in Chicago, and you need to visit New...Ch. 9.CR - Prob. 32CRCh. 9.CR - Prob. 33CRCh. 9.CR - Prob. 34CRCh. 9.CR - Prob. 35CRCh. 9.CR - Prob. 36CRCh. 9.CR - Prob. 37CRCh. 9.CR - Prob. 38CRCh. 9.CR - Prob. 39CRCh. 9.CR - Prob. 40CRCh. 9.CR - Prob. 41CRCh. 9.CR - Prob. 42CRCh. 9.CR - Prob. 43CRCh. 9.CR - Prob. 44CRCh. 9.CR - Prob. 45CRCh. 9.CR - Prob. 46CRCh. 9.CR - Prob. 47CRCh. 9.CR - Prob. 48CRCh. 9.CR - Prob. 49CRCh. 9.CR - Prob. 50CRCh. 9.CR - Prob. 51CRCh. 9.CR - Prob. 52CRCh. 9.CR - Prob. 53CRCh. 9.CR - Prob. 54CRCh. 9.CR - Prob. 55CRCh. 9.CR - Prob. 56CRCh. 9.CR - Prob. 57CRCh. 9.CR - Prob. 58CRCh. 9.CR - Prob. 59CRCh. 9.CR - Prob. 60CRCh. 9.CR - Prob. 61CRCh. 9.CR - Prob. 62CRCh. 9.CR - Prob. 63CRCh. 9.CR - Prob. 64CR
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, subject and related others by exploring similar questions and additional content below.Similar questions
- . An island is located 3 miles off the shore of the mainland. A fiber optic cable is to be built connecting the island to the mainland. The switching plant for the cable company located 10 miles along the coast from a point directly opposite the island. It has been determined that it will cost $20,000 per mile to place the cable in the ocean and $15,000 per mile to place the cable along the shoreline. Where should the underwater cable meet the shoreline in order to minimize the construction cost? . After waiting for the completion of the design phase and the acceptance of bids, it was found that the costs have changed to $26,000 per mile for the underwater cable and $25,000 per mile for the shoreline cable. Should the place where the cable meets the shoreline be adjusted? Explain why your answer did or did not change.arrow_forwardParent W requires one of component B and two of component C. Both B and Care run on work center 10. Setup time for B is 2 hours, and run time is 0.1 hour perpiece. For component C, setup time is 2 hours, and run time is 0.15 hour per piece. Ifthe rated capacity of the work center is 80 hours, how many Ws should be producedin a week?arrow_forwardSulaiman is planning to take his car for regular service. The work required in servicing is divided into several activities and represented in the below table along with the time taken for each task: ACTIVITY TASK Activitysymbol iMMEDIATEPREDECESSORS Duration (min) Open the petrol tank cap A - 2 Add petrol (Paid service) B A 14 Close the petrol tank cap C B 10 Open bonnet, check and add engineoil (Paid service) D - 19 Check radiator coolant, Checkbattery, Close bonnet E D 12 Clean the wind shield, Check airpressure in tires F - 12 Prepare bill G B,E 11 Collect payment H G 15 Draw the network diagram and find the earliest start and latest finish time of all the activities. Also determine thetotal project time for which Sulaiman will stay at the service station and list out the critical activities.arrow_forward
- A hurricane has been predicted to make landfall in Louisiana. The counties that lie within the path of the storm along with current population estimates are given in Table 1 below. There are several regional warehouses located in Texas, Alabama and Georgia that have capacity available to lease so that supplies can be prepositioned in advance of the storm. The lease capacity available at each of the warehouses is 100,000 units of MREs (meals ready-to-eat). The cost to lease each warehouse along with the capacity available is displayed in Table 2. The distance (in miles) to ship product to each of the counties from each possible warehouse location is summarized in Table 3. Assume travel cost is proportional to distance traveled. Formulate a mathematical model that will determine which of the warehouses to use to preposition MREs and the amount shipped from each warehouse to each of the counties to assist those who are in need after the storm. Assume that 25% of the population will…arrow_forwardYou work for a company that makes cell phones and have been made project manager for the design of a new cell phone. Your supervisors have already scoped the project, so you have a list showing the work breakdown structure, and this includes major project activities. You must plan the project schedule and calculate project duration. Your boss wants the schedule on his desk tomorrow morning! You have been given the information in Exhibit 4.13. It includes all the activities required in the project and the duration of each activity. Also, dependencies between the activities have been identified. Remember that the preceding activity must be fully completed before work on the following activity can be started. Your project is divided into five major subprojects. Subproject “P” involves developing specifications for the new cell phone. Here, decisions related to such things as battery life, size of the phone, and features need to be made. These details are based on how a customer…arrow_forwardYou work for a company that makes cell phones and have been made project manager for the design of a new cell phone. Your supervisors have already scoped the project, so you have a list showing the work breakdown structure, and this includes major project activities. You must plan the project schedule and calculate project duration. Your boss wants the schedule on his desk tomorrow morning! You have been given the information in Exhibit 4.13. It includes all the activities required in the project and the duration of each activity. Also, dependencies between the activities have been identified. Remember that the preceding activity must be fully completed before work on the following activity can be started. Your project is divided into five major subprojects. Subproject “P” involves developing specifications for the new cell phone. Here, decisions related to such things as battery life, size of the phone, and features need to be made. These details are based on how a customer…arrow_forward
- Make a graphic displayarrow_forwardCost Activity. OMR A. Space Cost 4564000 B. Labour Cost 1600000 C. Equipment Cost 456000 D. Total Direct Cost 6620000 E. Overhead Cost 2122000 Calculate the following: 1. The cost per pallet space, on the basis of 21,000 x curo pallet spaces in the warchouse. 2. Labour cost, on the basis of 175,000 labour hours used annually by the warchouse 3. Equipment cost, on the basis of 115,000 equipment hours used annually by the warchouse. Costs must include overhead costs.arrow_forwardThe dams in and around Cape Town form part of the Western Cape Water Supply System, which is an integrated and collectively managed system of dams, pump stations, pipelines, and tunnels. In addition to servicing Cape Town, the system supplies water to towns in the Overberg, Boland, West Coast, and Swartland areas, and provides irrigation water for agriculture. The change in depth of the Steenbras dam from one day to the next, measured (in feet) at in Cape Town, is a random variable Y with the following density function: f(y) = 2 < y< 4, elsewhere. 2.4.1. Define the random variable Y. 2.4.2 State what type of distribution does Y follow and why: 2.4.3. Find E (Y) and interpret your answer.arrow_forward
- The National Express Parcel Service has established various truck and air routes around the country over which it ships parcels. The holiday season is approaching, which means a dramatic increase in the number of packages that will be sent. The service wants to know the maximum flow of packages it can accommodate (in tons) from station 1 to station 7. The network of routes and the flow capacities (in tons of packages per day) along each route are shown in the following network: Determine the maximum tonnage of packages that can be transported per day from station 1 to station 7 and indicate the flow along each branch.arrow_forwardMessenger name: Marivic Rubio Daniel-Tañola Phone number: 09501199927 Email account: marivicd67@sccpag.com SAINT COLUMBAN COLLEGE Comer V. Ceriles Sagun Streetn, San Francisco Diatrict, Pagadian Cty Tel Nos 21517999/2151800 I Fax No 21412oI Webae www.sccpagedu ph E-mar sccpc1957@umal.com *Please show your complete solutions. ACTIVITY 1: NAME: STRAND/SECTION: DATE: dy and simplify the result, if possible. dr Find y = sec a sin r-1 1. 2. Cos z y = 1 sinr cos z 3. 4. y =-- tan I cot z secx 5. f(x) = 1-sinz SAINT COLUMBAN COLLEGE Comer V. Ceres Sagun Seeets, San Fancsco Disa Tel Ne 2151r9/2 00 faNo 2200I Webte www.soepag.edu ph Emal sepe 2/5 ACTIVITY 2:arrow_forwardHectic Repair Org. HRO) helps repair homes that are structurally weakened by minor earthquakes. After an earthquake, SmartProtect, an insurance company of some affected customers in the area estimates that the standard time to perform a preliminary damage assessment on an average-sized house would be about two hours. On behalf of the affected customers, SmartProtect is willing to pay a HRO employee doing such damage assessments $65 per hour. Suppose that Michael (an employee at HCRO who does flood damage assessment) takes three hours to complete the assessment on an average-sized house. What is Michael efficiency based on the standard time estimated by SmartProtect? a. Approximately one hundred and fifty percent. b. About one-third of an assessment job per hour c. Approximately one hundred and thirty dollars per assessment d. Approximately one hundred and ninety five dollars per assessment (before taxes) e. Approximately sixty seven percent.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Mathematics For Machine TechnologyAdvanced MathISBN:9781337798310Author:Peterson, John.Publisher:Cengage Learning,
Mathematics For Machine Technology
Advanced Math
ISBN:9781337798310
Author:Peterson, John.
Publisher:Cengage Learning,
Solve ANY Optimization Problem in 5 Steps w/ Examples. What are they and How do you solve them?; Author: Ace Tutors;https://www.youtube.com/watch?v=BfOSKc_sncg;License: Standard YouTube License, CC-BY
Types of solution in LPP|Basic|Multiple solution|Unbounded|Infeasible|GTU|Special case of LP problem; Author: Mechanical Engineering Management;https://www.youtube.com/watch?v=F-D2WICq8Sk;License: Standard YouTube License, CC-BY
Optimization Problems in Calculus; Author: Professor Dave Explains;https://www.youtube.com/watch?v=q1U6AmIa_uQ;License: Standard YouTube License, CC-BY
Introduction to Optimization; Author: Math with Dr. Claire;https://www.youtube.com/watch?v=YLzgYm2tN8E;License: Standard YouTube License, CC-BY