An owner is considering upgrading the siding on her house. Package A costs $50,000 and is expected to save $7,000 annually in heating and cooling. Package B costs $70,000, and the expected annual savings is $9,000. Which package should be chosen if the discount rate is 9% over a 20-year period?
A warehouse rents for $5,236 per month.  Assuming that the warehouse contains 9,520 square feet (sq. ft.), calculate the annual rent per square foot.
A flooring subcontractor must install three types of flooring in an existing building. The subcontractor is given 10 days to finish all the work. Assume he has crews to start all three jobs concurrently. Four days after the start of the work, he discovers the following: Type Quantity Unit Total Installed Actual Cost 2. (m) Price Price (m) Carpet 2600 2.30 5980 1600 3150 Vinyl tile 1200 2.95 3540 800 2488 Ceramic 3330 4.95 16484 750 3638 tile Total 7130 26004 What is the Schedule Performance Index (SPI) value for Ceramic tile
Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
Pricing Concrete Jobs - 24' X 24' Concrete Floor (Prep, Pour, Finish); Author: Mike Day Concrete;https://www.youtube.com/watch?v=V-fgI1Hiu9w;License: Standard Youtube License