A team of 2 skilled mason and 4 laborers are assigned to work on a 20 cubic meter volume of concreting work. They finished the job in 5 days, working 8 hours a day. What is there Productivity rate for the activity?
2. Machine A has a price of $60,000, annual operating cost of $24,000, and life of 5 years. Machine
B has a price of $120,000, annual operating cost of $12,000, and life of 10 years. At MARR=10% per
year, use EAC and PW to choose the better machine.
(a) Using EAC, which machine would you choose?
2.1) Show your calculation in determining the total required storage yard for reinforcing steel bar (A) in m' given that:-
the total quantity of rebar required for the project (Q) = 1,800 tons,
project duration (T) = 120 days,
the average stock (t) = 7 days,
fluctuation factor of usage (k) = 0.80,
quantity of rebar can be stored/m (g.) = 1.40 tons/m, and
• utilization index for rebar () = 0.75
Knowledge Booster
Similar questions
- 3. A portable conveyor system is used to load wet sand from a stockpile to a concrete mix plant. The conveyor has a 30" wide belt that has a travel speed of 300 feet per minute. The angle of repose for the sand is 15°. Compute the average production rate of the conveyor in cubic yards per hour.arrow_forwardS No. 1 2 3 4 Prepare the lead statement and total cost for the following materials Assume for Metal Track -Lead x 1, Carts Track-Lead x 1.1, and S. Track-Lead x 1.4 Lead in KM Materials Rate at Source Metal Truck Carts Sandy Truck Truck Conveyance Chargé per KM $80/m³ 1 0.5 0.8 $0.3/m² $160/1000Nos 0.8 0.5 $7/1000Nos./km $6/m³ 0.67 1 ($1.9/Km/m³ $26/m³ 0.7 0.9 $1.4/Km/m² "Cement Brick Sand Gravel 40mm www 0.35 0.3 14 Toll Charge $2 $6/1000Nos $1 ANEVELRE Taxes Charges $3 $3/500NOS $2arrow_forwardA contractor needs 3715 m³ of aggregate base for a highway construction project. It will be compacted to a dry unit weight of 18.9 kN/m³. This material is available in a stockpile at a local material supply yard at a water content of 7.75%, but is sold by the metric ton and not by cubic meters (ton 3 1000kg). a. How many tons of aggregate should the contractor purchase? Round your answer to the nearest whole number. b. A few weeks later, an intense rainstorm increased the water content of the stockpile to 14%. If the contractor orders the same quantity for an identical section of the highway, how many cubic meters. of compacted aggregate base will he produce?arrow_forward
- Determine the tonnage or capacity/truck using the following parameters: Ore hauling Cycle time = 30 minutes hauling time = 18 hrs/day Production target = 30,000 tons per day Truck Capacity = 100 tonner Truck factor = 85 %arrow_forwardA customer estimates that he is getting 30 cubic yards(loose) of gypsum in his scraper. Determine the percentoverload if the load estimate is correct. The maximum loadcapacity of the scraper is 84,000 pounds.arrow_forward12.13 A civil engineer involved in construction requires 4800, 5810, and 5690 m³ of sand, fine gravel, and coarse gravel, respectively, forarrow_forward
- Problem 2: Complete the missing information in the concrete placing labor cost estimating table below. Number 1 2 5 1 Component Foundation Wall to elevation Slab 10 in Beams elevated Beams elevated Member Slab elevation Interior wall Slab elevation Walls Walls Floors elevated Manhole walls Roof Headwall Carpenter foreman Cement mason Laborers Concrete pump Production rate of crew under normal circumstances = 18 m³/hr. The actual production rate can be lower in the different components based on the efficiency factor Total cost 14 12 Quantity (m3) Efficiency factor 44 59 7 14 9 12 57.2 42 8.9 Concrete placing crew 27.3 14 -8 8.5 Rate per hour $45/hr $35/hr $25/hr $55/hr Crew hourly rate ($/hr) 0.89 0.90 Cost/m3 Total 0.75 0.85 0.79 0.78 0.65 0.70 0.85 0.88 0.85 0.80 0.75 0.87 Total labor cost for concretearrow_forwardThe crew hour productivity rate for cast in place concrete is: O 0.128 ch/m3 O 0.067 ch/m3 O 0.111 ch/m3 O None of the above QUESTION 15 The man hour cost for cast in place concrete is: $38.50/mh O $40.43/mh 37.33/mh O None of the above QUESTION 16 The crew hour cost for cast in place concrete is: $283.00/ch $224.00/ch $269.50hch O None of the abovearrow_forwardQuestion: Each of the four silos seen in the figure has an empty weight of 30MN, and can hold up to 105 MN of grain. The weight of the mat is 55 MN. Since each silo is filled independently, the resultant load imposed on the mat does not necessarily act through the centroid. Evaluate the various loading conditions and determine whether centrally loaded, one-way eccentric loaded, and two-way eccentric loading requirements will be met. If these requirements are not met, determine the minimum mat width, B, needed to satisfy these requirements. Allowable bearing capacity is given as qa=265kPa). 50m 12,5m Plan 50m 12,5m Profile Mat foundationarrow_forward
- 14.1 A customer estimates that he is getting 30 cubic yards (loose) of gypsum in his scraper. Determine the percent over-load if the load estimate is correct. The maximum load capacity of the scraper is 84,000 pounds.arrow_forwardSOM 6. Show your complete solution.arrow_forwardPlease Solve the Question fully ! If the BOD3 of a waste is 75 mg/L and the K is 0.150 d^-1 , what is the ultimate BOD? (Report your answer to two significant figures).arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,