Tailwind, Inc., produces high-quality but expensive training shoes for runners. The Tailwind shoe, which
sells for $210, contains both gas- and liquid-filled compartments to provide more stability and better
protection against knee, foot, and back injuries. Manufacturing the shoes requires 10 separate tasks.
There are 400 minutes available for manufacturing the shoes in the plant each day. Daily demand is
62. The information for the tasks is as follows:
Fig. 1
Task
A
Performance
Time (mins)
1
Predecessors
3
A
1
B
B
C, D
A
F
Н
G
1
4
E, H
|
42326-
BCDEFGHI -
J
a-b) The correct precedence relationship with one of the possible assignments of tasks using the
"ranked positioned weight" to workstations is shown in
c) The efficiency of the assembly line with 5 workstations shown in the figure chosen above= %
(enter your response as a percentage rounded to one decimal place).
d) The idle time for the assembly line per cycle = ☐ minute(s) (enter your response as a
whole number).
☑
B
E H
→
Fig. 2
B
Fig. 3
E
B
H
☑
expand button
Transcribed Image Text:Tailwind, Inc., produces high-quality but expensive training shoes for runners. The Tailwind shoe, which sells for $210, contains both gas- and liquid-filled compartments to provide more stability and better protection against knee, foot, and back injuries. Manufacturing the shoes requires 10 separate tasks. There are 400 minutes available for manufacturing the shoes in the plant each day. Daily demand is 62. The information for the tasks is as follows: Fig. 1 Task A Performance Time (mins) 1 Predecessors 3 A 1 B B C, D A F Н G 1 4 E, H | 42326- BCDEFGHI - J a-b) The correct precedence relationship with one of the possible assignments of tasks using the "ranked positioned weight" to workstations is shown in c) The efficiency of the assembly line with 5 workstations shown in the figure chosen above= % (enter your response as a percentage rounded to one decimal place). d) The idle time for the assembly line per cycle = ☐ minute(s) (enter your response as a whole number). ☑ B E H → Fig. 2 B Fig. 3 E B H ☑
Expert Solution
Check Mark
Knowledge Booster
Background pattern image
Similar questions
Recommended textbooks for you
Text book image
Advanced Engineering Mathematics
Advanced Math
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Wiley, John & Sons, Incorporated
Text book image
Numerical Methods for Engineers
Advanced Math
ISBN:9780073397924
Author:Steven C. Chapra Dr., Raymond P. Canale
Publisher:McGraw-Hill Education
Text book image
Introductory Mathematics for Engineering Applicat...
Advanced Math
ISBN:9781118141809
Author:Nathan Klingbeil
Publisher:WILEY
Text book image
Mathematics For Machine Technology
Advanced Math
ISBN:9781337798310
Author:Peterson, John.
Publisher:Cengage Learning,
Text book image
Basic Technical Mathematics
Advanced Math
ISBN:9780134437705
Author:Washington
Publisher:PEARSON
Text book image
Topology
Advanced Math
ISBN:9780134689517
Author:Munkres, James R.
Publisher:Pearson,