Tailwind, Inc., produces high-quality but expensive training shoes for runners. The Tailwind shoe, which sells for $210, contains both gas- and liquid-filled compartments to provide more stability and better protection against knee, foot, and back injuries. Manufacturing the shoes requires 10 separate tasks. There are 400 minutes available for manufacturing the shoes in the plant each day. Daily demand is 62. The information for the tasks is as follows: Fig. 1 Task A Performance Time (mins) 1 Predecessors 3 A 1 B B C, D A F Н G 1 4 E, H | 42326- BCDEFGHI - J a-b) The correct precedence relationship with one of the possible assignments of tasks using the "ranked positioned weight" to workstations is shown in c) The efficiency of the assembly line with 5 workstations shown in the figure chosen above= % (enter your response as a percentage rounded to one decimal place). d) The idle time for the assembly line per cycle = ☐ minute(s) (enter your response as a whole number). ☑ B E H → Fig. 2 B Fig. 3 E B H ☑

Glencoe Algebra 1, Student Edition, 9780079039897, 0079039898, 2018
18th Edition
ISBN:9780079039897
Author:Carter
Publisher:Carter
Chapter9: Quadratic Functions And Equations
Section9.4: Solving Quadratic Equations By Factoring
Problem 2GP
icon
Related questions
Question
Tailwind, Inc., produces high-quality but expensive training shoes for runners. The Tailwind shoe, which
sells for $210, contains both gas- and liquid-filled compartments to provide more stability and better
protection against knee, foot, and back injuries. Manufacturing the shoes requires 10 separate tasks.
There are 400 minutes available for manufacturing the shoes in the plant each day. Daily demand is
62. The information for the tasks is as follows:
Fig. 1
Task
A
Performance
Time (mins)
1
Predecessors
3
A
1
B
B
C, D
A
F
Н
G
1
4
E, H
|
42326-
BCDEFGHI -
J
a-b) The correct precedence relationship with one of the possible assignments of tasks using the
"ranked positioned weight" to workstations is shown in
c) The efficiency of the assembly line with 5 workstations shown in the figure chosen above= %
(enter your response as a percentage rounded to one decimal place).
d) The idle time for the assembly line per cycle = ☐ minute(s) (enter your response as a
whole number).
☑
B
E H
→
Fig. 2
B
Fig. 3
E
B
H
☑
Transcribed Image Text:Tailwind, Inc., produces high-quality but expensive training shoes for runners. The Tailwind shoe, which sells for $210, contains both gas- and liquid-filled compartments to provide more stability and better protection against knee, foot, and back injuries. Manufacturing the shoes requires 10 separate tasks. There are 400 minutes available for manufacturing the shoes in the plant each day. Daily demand is 62. The information for the tasks is as follows: Fig. 1 Task A Performance Time (mins) 1 Predecessors 3 A 1 B B C, D A F Н G 1 4 E, H | 42326- BCDEFGHI - J a-b) The correct precedence relationship with one of the possible assignments of tasks using the "ranked positioned weight" to workstations is shown in c) The efficiency of the assembly line with 5 workstations shown in the figure chosen above= % (enter your response as a percentage rounded to one decimal place). d) The idle time for the assembly line per cycle = ☐ minute(s) (enter your response as a whole number). ☑ B E H → Fig. 2 B Fig. 3 E B H ☑
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Glencoe Algebra 1, Student Edition, 9780079039897…
Glencoe Algebra 1, Student Edition, 9780079039897…
Algebra
ISBN:
9780079039897
Author:
Carter
Publisher:
McGraw Hill
College Algebra
College Algebra
Algebra
ISBN:
9781938168383
Author:
Jay Abramson
Publisher:
OpenStax
Algebra & Trigonometry with Analytic Geometry
Algebra & Trigonometry with Analytic Geometry
Algebra
ISBN:
9781133382119
Author:
Swokowski
Publisher:
Cengage