100%
A bridge girder with section shown below is used for a 50 ft. simple-span. The beam is
prestensioned using stranded cables that apply a compressive force P₁= 450 kips at transfer.
After all time-dependent losses, an effective prestresss, P. = 355 kips, is attained. The steel
consists of (29) 3/8-in. diameter Grade 270 strands and the centroid has a constant eccentricity of
12.5 inches. Answer the following:
a) Given that the girder cambers upward immediately upon release of prestress force to the
beam, what concrete stresses are obtained at the midspan at that loading state?
c) What stresses are obtained at the midspan for the unloaded member (prestress plus self-
weight only) after all important losses have occured?
d) What stresses result at the midspan upon application of full service load of 1.65 kips/ft?
11'-0"-1
6"
1-6-
6"
1"-3"
6+6+
-3"
3'-0"
A 369 in²
Ig=50,979 in
C₁ = 20.17 in.
C₂=15.83 in.
²= 138 in²
Wo384 plf (selfweight)
Transcribed Image Text:A bridge girder with section shown below is used for a 50 ft. simple-span. The beam is prestensioned using stranded cables that apply a compressive force P₁= 450 kips at transfer. After all time-dependent losses, an effective prestresss, P. = 355 kips, is attained. The steel consists of (29) 3/8-in. diameter Grade 270 strands and the centroid has a constant eccentricity of 12.5 inches. Answer the following: a) Given that the girder cambers upward immediately upon release of prestress force to the beam, what concrete stresses are obtained at the midspan at that loading state? c) What stresses are obtained at the midspan for the unloaded member (prestress plus self- weight only) after all important losses have occured? d) What stresses result at the midspan upon application of full service load of 1.65 kips/ft? 11'-0"-1 6" 1-6- 6" 1"-3" 6+6+ -3" 3'-0" A 369 in² Ig=50,979 in C₁ = 20.17 in. C₂=15.83 in. ²= 138 in² Wo384 plf (selfweight)
Expert Solution
steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Follow-up Questions
Read through expert solutions to related follow-up questions below.
Follow-up Question

Hello. Thank u very much for this answer.

 

I have a little question: In this case What does Zt refer to?

Solution
Bartleby Expert
SEE SOLUTION
Knowledge Booster
Foundation plan layout
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Steel Design (Activate Learning with these NEW ti…
Steel Design (Activate Learning with these NEW ti…
Civil Engineering
ISBN:
9781337094740
Author:
Segui, William T.
Publisher:
Cengage Learning