Question 12 You work for a freight forwarding company responsible for moving carpenter supplies from Toronto, Canada to Casper, Wyoming. Your company has a standardized variable rate structure in place for these shipments and it is as follows: 0 – 500 lbs $ 100.00 flat rate 501 – 1999 lbs $ 19.00 cwt 2000 – 4999 lbs $ 16.40 cwt 5000 – 9999 lbs $ 13.25 cwt 10000 – 19999 lbs $ 10.25 cwt 20000 – 29999 lbs $ 8.75 cwt 30000 – 45000 lbs $2500.00 flat rate ** Rates are based on 10 pounds per cubic feet A local manufacturer has approached your trucking company about shipping 150 rubbermaid wheelbarrels from Toronto to Casper, Wyoming. The wheelbarrels weigh 45 pounds each including packaging. The dimension of the shipping box is 5’ x 3’ x 2’. What is the volume weight of this shipment?. Total volume weight 4500kg Total volume weight 45,000lb Total volume weight 30 cubic feet
Critical Path Method
The critical path is the longest succession of tasks that has to be successfully completed to conclude a project entirely. The tasks involved in the sequence are called critical activities, as any task getting delayed will result in the whole project getting delayed. To determine the time duration of a project, the critical path has to be identified. The critical path method or CPM is used by project managers to evaluate the least amount of time required to finish each task with the least amount of delay.
Cost Analysis
The entire idea of cost of production or definition of production cost is applied corresponding or we can say that it is related to investment or money cost. Money cost or investment refers to any money expenditure which the firm or supplier or producer undertakes in purchasing or hiring factor of production or factor services.
Inventory Management
Inventory management is the process or system of handling all the goods that an organization owns. In simpler terms, inventory management deals with how a company orders, stores, and uses its goods.
Project Management
Project Management is all about management and optimum utilization of the resources in the best possible manner to develop the software as per the requirement of the client. Here the Project refers to the development of software to meet the end objective of the client by providing the required product or service within a specified Period of time and ensuring high quality. This can be done by managing all the available resources. In short, it can be defined as an application of knowledge, skills, tools, and techniques to meet the objective of the Project. It is the duty of a Project Manager to achieve the objective of the Project as per the specifications given by the client.
Question 12
You work for a freight forwarding company responsible for moving carpenter supplies from Toronto, Canada to Casper, Wyoming. Your company has a standardized variable rate structure in place for these shipments and it is as follows:
0 – 500 lbs $ 100.00 flat rate
501 – 1999 lbs $ 19.00 cwt
2000 – 4999 lbs $ 16.40 cwt
5000 – 9999 lbs $ 13.25 cwt
10000 – 19999 lbs $ 10.25 cwt
20000 – 29999 lbs $ 8.75 cwt
30000 – 45000 lbs $2500.00 flat rate
** Rates are based on 10 pounds per cubic feet
A local manufacturer has approached your trucking company about shipping 150 rubbermaid wheelbarrels from Toronto to Casper, Wyoming. The wheelbarrels weigh 45 pounds each including packaging. The dimension of the shipping box is 5’ x 3’ x 2’. What is the volume weight of this shipment?.
Total volume weight 4500kg
|
||
Total volume weight 45,000lb
|
||
Total volume weight 30 cubic feet |
Step by step
Solved in 2 steps