Structural Analysis
6th Edition
ISBN: 9781337630931
Author: KASSIMALI, Aslam.
Publisher: Cengage,
expand_more
expand_more
format_list_bulleted
Question
thumb_up100%
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by stepSolved in 3 steps with 2 images
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- Q4/ Compute the reduce level of the points for the following readings, then draw the profile using scale (1:5000) for distances and (1:50) for the elevations, so draw the grade line starting from station (0+00) sloping (0.5 %) to down to station (5+00) and find the height of cut and fill ? Station 1 2 3 4 5 6 7 8 9 10 11 Dis. (m) 0+00 1.52 0+50 1+00 2.59 1+50 B.S. I.S. 2+00 1.12 2+50 3+00 1.16 3+50 4+00 1.22 4+50 5+00 1.91 1.92 1.44 1.82 2.30 F.S. 2.41 1.48 1.50 1.91 3.85 H.I. Ele. 25.00 Ele.of Height grade of cut Height of fillarrow_forward1. Calculate the grade of points A, B and C. El. 126.42m 3.70% 158.75 A -4.1% 66.45 126-866- B 2.90% 205.6 Carrow_forwardQuestion 2. Below shown is the profile for a road construction at a station. This is a fill section. Sometimes the letter C is used to designate cut and F to indicate fill for the vertical distance or depth. In other words, a point below the base would have a negative sign in a fill section. F 11.8 below corresponds to -11.8 ft. The baseline is 50ft. Calculate the area for the fill section. (Answer: 137.3 yd²) 50ft F 11.8 -42.5 F 14.3 -32.0 0 -25 25 olo F 15.8 25 25 Baseline F 16.3 65.4arrow_forward
- Calculate: The bearing and final length of point AB The slope of the gradeline joining the two points. Given: Point A : N= 3547m E= 755m Z= 699m Point B : N= 10489m E= 1086m Z= 633marrow_forwardDefine the term Slope Inclination Indicator.arrow_forwardQ6/ Below the elevation of points on the center of road project. If the D.L is start at elevation (25m) with ascending slope (0.5%). Find the heights of Fill and depths of cut for each points. с E F H I 100 150 200 250 300 350 400 25.7 25,2 24.8 26.6 26.8 27.2 27 60 28.0 Points A Dist. 0.0 C 26 B 50arrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you
- Structural Analysis (10th Edition)Civil EngineeringISBN:9780134610672Author:Russell C. HibbelerPublisher:PEARSONPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Fundamentals of Structural AnalysisCivil EngineeringISBN:9780073398006Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel LanningPublisher:McGraw-Hill EducationTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Structural Analysis (10th Edition)
Civil Engineering
ISBN:9780134610672
Author:Russell C. Hibbeler
Publisher:PEARSON
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:9780073398006
Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning