Q: Using a digital laser level instrument, the following staff readings were observed via an open loop data collection method 1. 2. TBM 1 49.873 m 3. 4. 5. 2.191 2.505 TBM 1 A S1 2.325 B 1.496 3.019 C 2.513 1.752 2.811 S3 11XZZATS TBM 2 3.824 Insert correctly the data onto the calculation table with their remarks, and calculate the reduced levels for each point using the rise and fall method, then answer the following questions What is the R.L value for TBM 2? How many data checking processes are performed for Rise and Fall method? Perform the data checking and find the value. What is the allowable error for this job in millimetres? How many change points were made during the data collection process? TBM 2

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Q: Using a digital laser level instrument, the following staff readings were observed via an open loop data collection method
TBM 1 49.873 m
2.191
2.505
TBM 1
S1
D
jakbal
2.325
1.496 3.019
2.513
1.752 2.811
S3
TBM 2
3.824
TBM 2
Insert correctly the data onto the calculation table with their remarks, and calculate the reduced levels for each point using the rise and fall method, then answer the following questions
What is the R.L value for TBM 2?
1.
2.
How many data checking processes are performed for Rise and Fall method?
3.
Perform the data checking and find the value.
4.
What is the allowable error for this job in millimetres?
5.
How many change points were made during the data collection process?
Transcribed Image Text:Q: Using a digital laser level instrument, the following staff readings were observed via an open loop data collection method TBM 1 49.873 m 2.191 2.505 TBM 1 S1 D jakbal 2.325 1.496 3.019 2.513 1.752 2.811 S3 TBM 2 3.824 TBM 2 Insert correctly the data onto the calculation table with their remarks, and calculate the reduced levels for each point using the rise and fall method, then answer the following questions What is the R.L value for TBM 2? 1. 2. How many data checking processes are performed for Rise and Fall method? 3. Perform the data checking and find the value. 4. What is the allowable error for this job in millimetres? 5. How many change points were made during the data collection process?
Expert Solution
steps

Step by step

Solved in 4 steps with 2 images

Blurred answer
Knowledge Booster
Methods of Surveying
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning