Problem 1. You have been tasked with the design and quality control of a soil placed behind a retaining wall (good drainage is desired). Laboratory compaction test results on the clayey soil used in the project are listed on the table below. Specific gravity of the soil = 2.85 Wet mass (kg) w (%) 9.50 1.85 1.87 10.20 1.94 11.90 2.00 13.40 2.04 14.70 2.06 17.00 2.03 2.00 19.10 20.90 a) ( What is the O.M.C. and the maximum dry unit weight for that soil? b) Based on your compaction curve, what specification for moisture content and dry unit weight will you give to the contractor? Why? (typically compaction specifications are provided within a small range, (i.e. compact to 18 to 18.3 kN/m^3 with moisture contents in the range of 9%-10%) As part of the quality control, you performed a sand-cone test on the compacted soil and obtained the following data: Density of the sand (kg/m^3)= 1500; Mass of sand to fill the cone = 0.524 kg Mass of jar+cone+sand (before use)= 6.98 kg Mass of jar+cone+sand (after use)= 5.84 kg Mass of moist soil from hole = 0.87 kg c) Moisture content of soil = 0.14 What is the dry unit weight of the compacted soil? e) Based on your results from the sand-cone test, does the field compaction meet the specifications? (if not, the contractor must redo the work).
Problem 1. You have been tasked with the design and quality control of a soil placed behind a retaining wall (good drainage is desired). Laboratory compaction test results on the clayey soil used in the project are listed on the table below. Specific gravity of the soil = 2.85 Wet mass (kg) w (%) 9.50 1.85 1.87 10.20 1.94 11.90 2.00 13.40 2.04 14.70 2.06 17.00 2.03 2.00 19.10 20.90 a) ( What is the O.M.C. and the maximum dry unit weight for that soil? b) Based on your compaction curve, what specification for moisture content and dry unit weight will you give to the contractor? Why? (typically compaction specifications are provided within a small range, (i.e. compact to 18 to 18.3 kN/m^3 with moisture contents in the range of 9%-10%) As part of the quality control, you performed a sand-cone test on the compacted soil and obtained the following data: Density of the sand (kg/m^3)= 1500; Mass of sand to fill the cone = 0.524 kg Mass of jar+cone+sand (before use)= 6.98 kg Mass of jar+cone+sand (after use)= 5.84 kg Mass of moist soil from hole = 0.87 kg c) Moisture content of soil = 0.14 What is the dry unit weight of the compacted soil? e) Based on your results from the sand-cone test, does the field compaction meet the specifications? (if not, the contractor must redo the work).
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning