Please explain the Coordination of a construction project with Area Economic Development Activities.
Q: What you done during your time at the university to develop enough of a specialization in…
A: Currently, I am pursuing my master's degree in civil engineering, specialisation in geotechnical…
Q: Consider the given retaining wall with backfill. The active earth pressure at base of wall is kN/m2.…
A: For the given retaining wall with backfill,To find the active earth pressure at base of wall
Q: Situation 4: A member of the top chord of a truss of an industrial building is 10 m long has…
A:
Q: A cylinder with a 6.0 in. diameter and 12.0 in. length is put under a compressive load of 150 kips.…
A: D = 6 inL = 12 in P = 150 kipsE = 8000 ksi v = 0.35
Q: Lacey's scour depth for a stream flowing at a rate of 10 cumec per m width through an alluvial soil…
A: Flow rate, q = 10 cumec per m widthsoil particles size, d = 4 mm
Q: In the loaded beam shown below. determine the reactions, Value of maximum shear value of maximum…
A:
Q: The beam cross-section shown below has 90 kip-ft of bending moment applies to it. calcul 6" T 8" 2"…
A:
Q: Assuming the conduit in the figure is a 42” rough concrete pipe flowing full: a) Calculate the head…
A: a.) Head loss = 92.22 ft.b.) Velocity = 26.52 ft/sec ; Q = 255.15 ft^3/secc.) Velocity =…
Q: Lacey's scour depth for a stream flowing at a rate of 10 cumec per m width through an alluvial soil…
A: Flow rate, q = 10 cumec per m widthsoil particles size, d = 4 mm
Q: Base on the Images provided of the 2023 Turkey Earthquake: 7.8 Magnitude and other data on the…
A: The Turkey earthquake magnitude on the reactor scale of 7.8Need to findA. what causes the buildings…
Q: A B 4 m E 4m
A:
Q: A double bolted lap joint in used to connect two plates of 10 mm thickness using M20 bolt of grade…
A: Joint:Type: Double bolted lap jointPlate thickness: 10 mmBolt:Grade: M20Material: 4.6 (assumed to be…
Q: 8. The upper portion of an inverted U-tube is filled with oil having a pecific gravity of 0.98. The…
A: Determine the pressure difference (PB - PA).
Q: A filter press with an effective filtering area between 350m^2 operates constantly maintaining a…
A: The objective of the question is to calculate the filtration velocity at a given time (t=120m) for a…
Q: Please solve this Shear strength test
A:
Q: A wooden bar beam arrangement is shown in the figure. The beam is formed by nailing wooden bar and…
A: For a wooden bar beam arrangementThe beam is formed by nailing wooden bar and each nailshearing…
Q: d. What is the clearance "E" required? e. What is the diagonal minimum distance? f. What is the…
A: A sheared flat bar 8" in width, which is to have a double line of 1 3/8" Dia bolts.Need to findd.…
Q: An asphalt concrete mix contains 2250 Kg of agg. and 150 Kg of asphalt per 1 m², asphalt absorption…
A:
Q: An unconfined aquifer (porosity, n = 0.29) with a specific retention of 0.11 has an area of 130…
A:
Q: Compute the rectangular components (vertical and horizontal) for the 400-lb force shown below. X(-)…
A:
Q: The block shear strength of the tension member as shown in figure is (round off to two decimal…
A: For given tension member,grade of plate Fe410Angle specification: -ISA 80 x 50x 8 mmBolt…
Q: Name Station BS BM-A Inst. 1 TP #1 Inst. 2 TP #2 Inst. 3 TBM-1 HI FS Instructions: fill out the…
A: The elevation of benchmark is given =658.57'And also given the values of staff readings.
Q: The Safety Performance functions for injury, fatal and property damage only crashes are:SPinj =…
A: The objective of the question is to determine the long term average number of injury, fatal and…
Q: The truss loaded as shown has a pin support at A and a roller support at B. Using the Method of…
A:
Q: 3. A thin strip of rubber has an initial length of 25 in. If it is stretched around a pipe having an…
A: Solution:Unstretched Length Lo= 25 inDiameter of pipe = 7 inTo find :Average Normal Strain…
Q: Problem 2: What is the U value for these cases? 1. Plate connected using bolts (fasteners) only. 2.…
A: Note: Since you have posted a question with multiple sub-parts, we will solve the first three…
Q: 4 kN ↑ 5 m 7 kN 3 m
A:
Q: with
A: Wind speed = 90 mphmean height of roof = 30 ftdimension of building = 100*100 (ft*ft)Exposed…
Q: A W 21 x 48 beam is simply supported on a span 7 m. The beam is laterally supported at its ends and…
A: A W 21 x 48 beam is simply supported on a span 7 m. The beam is laterally supported at its ends and…
Q: The block shear strength of the tension member as shown in figure is (round off to two decimal…
A: For given tension member,grade of plate Fe410Angle specification: -ISA 80 x 50x 8 mmBolt…
Q: The beam cross-section shown below has 90 kip-ft of bending moment applies to it. calculate the…
A: Maximum bending moment (M) = 90 kip-ft Determine the maximum compressive bending stress about…
Q: Given the following information, what is the approximate value the subject property? Adjustments…
A: To estimate the value of the subject property, use the comparable property and make adjustments…
Q: #2! I During a storm, gage station A was inoperative but the surrounding stations B, C, and D,…
A:
Q: 1. Did internal or external factors (e.g. new staff/volunteers, unanticipated delays, increased…
A: The objective of the question is to understand the impact of internal and external factors on the…
Q: A wooden bar beam arrangement is shown in the figure. The beam is formed by nailing wooden bar and…
A: Given,B = 200 mm H = 360 mm t = 20 mm F = 250 NV = 3.2 kN or 3200 N
Q: A tapered bar AB of solid circular cross section and length Lis supported at end B and subjected to…
A:
Q: At full draw, an anchor applies a pull of 130 N to the bowstring of the bow as shown in the figure.…
A: Ans1)Pull=130KnThe diagram is given below-
Q: If the angle of obliquity for the resultant stress at a plane which is 45° from the principal stress…
A: To find the ratio of stress in x-direction to stress in y-direction
Q: Determine the design moment capacity Mn of the beam shown in the figure if b1=160 mm, b=76 mm, a=78…
A: Φbar = 34 mmfc = 31 MPafy 413 MPa
Q: If you have 3/4-inch NMAS with a dry rodded unit weight of 93 lb/ft^3,a fineness modulus of 2.5 for…
A: Nominal maximum aggregate size (NMAS) = 3/4-inchDry rodded unit weight = 93 lb/ft^3Fineness modulus…
Q: A simply supported beam of length '2L' carries a uniformly distributed load of 2w per unit length…
A: For simply supported beam,Length :2L uniformly distributed load : 2w per unit length To find the…
Q: D 7.0m. 2.0m Yt = 16.5 kN/m³ $' = 30° Loose sand fill: Yt = 19.5 kN/m3 $' = 30° Dense sand: Yt = 21…
A: The surcharge is equal to 10 KPa.Unit weight of water = 10 KN/m³for loose sand = 0.3 and for dense…
Q: Problem 2 For the closed tank with Bourdon-tube gages tapped into it, what is the specific gravity…
A:
Q: A watershed has five rain gauge stations. In a year, the annual rainfall recorded by rain gauges are…
A: 1. Annual rainfall recorded by the five rain gauge stations (in cm): 115.5, 106.8, 125.4, 95.6, and…
Q: Since the industrial revolution (~1750), humans have released over 1.5 trillion tons of CO2 into the…
A:
Q: A dam of 21.5 m height and has free board of 1.5 m. A flow net is constructed containing following…
A: A dam of 21.5 m height and has free board of 1.5 m.Number of potential drops = 12Number of flow…
Q: The following information is available in a for use sediment storage got a downstreem effective…
A:
Q: A cylindrical rod with a length of 380 mm and a diameter of 10 mm is to be subjected to a tensile…
A: Length (L) = 380 mm Diameter (D) = 10 mm Applied load, P = 24.5 kN or 24500 N
Q: L Mo
A:
Q: A vertical dam has a semicircular gate as shown in the figure. The total depth d of the figure is 14…
A: d = 14 mh = 2 mw = 4mkg/m3
Please explain the Coordination of a construction project with Area Economic Development Activities.
Unlock instant AI solutions
Tap the button
to generate a solution
Click the button to generate
a solution
- 1. What is the completion time? 2. When will the project be completed?Project closeout is the final construction phase of the project lifecycle. This phase occurs after physical construction has been completed, but before the project is actually turned over to the owner. Identify and discuss the activities necessary to ensure a smooth project close out. Give appropriate examples such as charts or diagrams.Give three examples of benefits that may be achieved by implementing BIM on a construction project.
- CONSTRUCTION METHOD AND PROJECT MANAGEMENT 3. The owner of a shopping center is considering modernizing and expanding the current 32-business shopping complex. He hopes to add 8 to 10 new business or tenants to the shopping complex. The specific activities that make up the expansion project, together with information on immediate predecessor and completion time, are listed in the following table. (a) What is the total completion time of the project? (b) What are the scheduled start and completion time for each activity? (c) Which activities are critical and must be completed exactly as scheduled in order to keep the project on schedule? (d) How long can the non-critical activities to be delayed before they cause a delay in the completion time for project? Time (days) Activity A B C D E F G H I Immediate Predecessor A A A E D, F B, C G, H po Completion Time (Weeks) 5 6 4 133 3 1 4 14 12 2. What are the Project Management Functions and Construction Project Phases according to CMAA? Explain briefly each function (just one sentence is enough).List at least five important types of meetings held during the construction phase of a project.
- How might the lessons learned from a construction project impact planning, performance, or services for future projects?How does a project's intended lifespan influence its estimated cost, particularly regarding maintenance?Quality Management Plan describes the activities and resources necessary for the project management team to achieve the quality objectives set for the project. As a future construction manager, how are you going to regulate and make sure that the quality of works will be met as stipulated in the project specification?