n the job, calculate the weight of cement, moist gravel, moist sand, and water that should be added to the batch. Summarize and total the mix design when finished.

Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter20: Design Of Rigid Pavements
Section: Chapter Questions
Problem 1P: Portland cement concrete consists of what four primary elements?
icon
Related questions
Question

You are working on a concrete mix design that requires each cubic yard of concrete to have a 0.43 water-cement ratio, 2077 lb/yd³ of dry gravel, 244 lb/yd³ of water, and 4% air content. The available gravel has a specific gravity of Gravel = 2.60, a moisture content of 2.3%, and absorption of 4.5%. The available sand has a

specific gravity of Grand 2.40, a moisture content of 2.2%, and absorption of

1.7%. Air entrainer is to be included using the manufacturers specification of 0.1 fl.

oz/1% air/100 lb cement.

For each cubic yard of concrete needed on the job, calculate the weight of cement,

moist gravel, moist sand, and water that should be added to the batch. Summarize

and total the mix design when finished.

Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 5 steps with 10 images

Blurred answer
Knowledge Booster
Types of Concrete
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning