Komatsu, Ltd. Komatsu Ltd was one of Japan's largest heavy industrial manufacturers.  Komatsu was a large international firm with revenues of ¥989 billion. The company was organized on three major lines of business: Construction equipment, industrial machinery, and electronic-applied products. Construction Equipment Komatsu was the world's 2nd-largest manufacturer of a complete line of construction equipment. The firm's product line contained over 300 models, including bulldozers, hydraulic excavators, wheel loaders, and dump trucks. With a more than 30% share of the domestic excavator market, Komatsu was the largest player in the Japanese market. The Product Development Process and Design for Manufacturability Cost Studies The product development process at Komatsu lasted 2 years on average. The Product Planning Stage The product planning process, which was last updated in 1981, began with the preparation of a long-range development plan. The Design Stage The objective of the design stage of product development was to prepare the product for prototype production. The design phase consisted of 3 major steps: 1st, a conceptual drawing of the product: 2nd, layout drawings for the product and third, detailed parts drawings. During the first step, the first of four design-for-manufacturability studies was conducted. The A study evaluated the feasibility of achieving the target cost and the overall manufacturability of the design . The Trial Production Stage The objective of the trial production stage was to finalize the design of the product Trial production consisted of producing prototypes of each product and was conducted at the plants at which the product was to be manufactured. The completion of trial production allowed the final, or D. study to be carried out . This study examined the ease of production and assembly of the new product and confirmed its quality. If any problems were encountered, a Trial-Manufacture Problem Document was issued. Reducing the Time to Market Players in the highly competitive market for excavators and bulldozers had begun to compete based on the time it took to get new products to market. Part of Komatsu's plan to improve its design for manufacturing was to change its relationship with its suppliers. In 1993, Komatsu manufactured about 30% of its products, designed and subcontracted another 50%, and purchased from outside suppliers the remaining 20%. Target Costing Throughout the product development process, target costs played a critical role in ensuring that the product would be profitable when released for mass production. The preliminary target costs used in the long-range development plan for major subassemblies, such as the engine, power train, and cooling system, were developed from prior experience with similar subassemblies and discussions with production and engineering. These preliminary target costs or target values, were used to help identify when the application of cost reduction techniques was required. Product engineers were expected to identify several design alternatives for each major subassembly of a new product. Two factors were considered: quality and cost. A new design alternative was only adopted if it achieved both the desired levels of quality and cost. Frequently, one of the alternatives proposed produced a higher quality product but at a higher cost. The product engineers then explored ways to manufacture the higher quality alternative at a lower cost. If a cost-effective way to implement the new alternative was identified, then it was adopted; otherwise, the alternative was abandoned or subject to further study for future applications. The process of design analysis in the way the engine and torque converter, transmission, and steering clutch and brakes were positioned in the firm's larger bulldozers. In the old design, these three modules were physically separate. This approach, required 86 hours to mount and dismount these modules during maintenance. The process of functional analysis at Komatsu can be illustrated by the development of the target cost of an excavator cooling system. It began with an analysis of the functions of the cooling system and how they were achieved. The primary function was identified as its cooling capacity; secondary functions included how quickly it started cooling after the engine was first switched on and how stable a temperature it maintained. The determinants of cooling capacity were ranked in the order of importance. The most important determinant of cooling capacity was identified as the surface area of the radiator. The second most important determinant was the size of the fan, followed by the rotation speed of the fan, the volume of water in the system, and the ambient air temperature, The functional analysis began by plotting the cooling capacity versus the radiator surface area for all existing products that used the same type of cooling system. Required: Describes Komatsu's Competitive Environment

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question

Komatsu, Ltd.
Komatsu Ltd was one of Japan's largest heavy industrial manufacturers.  Komatsu was a large international firm with revenues of ¥989 billion. The company was organized on three major lines of business: Construction equipment, industrial machinery, and electronic-applied products.

Construction Equipment

Komatsu was the world's 2nd-largest manufacturer of a complete line of construction equipment. The firm's product line contained over 300 models, including bulldozers, hydraulic excavators, wheel loaders, and dump trucks. With a more than 30% share of the domestic excavator market, Komatsu was the largest player in the Japanese market.

The Product Development Process and Design for Manufacturability Cost Studies

The product development process at Komatsu lasted 2 years on average.

The Product Planning Stage

The product planning process, which was last updated in 1981, began with the preparation of a long-range development plan.

The Design Stage

The objective of the design stage of product development was to prepare the product for prototype production. The design phase consisted of 3 major steps: 1st, a conceptual drawing of the product: 2nd, layout drawings for the product and third, detailed parts drawings. During the first step, the first of four design-for-manufacturability studies was conducted. The A study evaluated the feasibility of achieving the target cost and the overall manufacturability of the design .

The Trial Production Stage

The objective of the trial production stage was to finalize the design of the product Trial production consisted of producing prototypes of each product and was conducted at the plants at which the product was to be manufactured. The completion of trial production allowed the final, or D. study to be carried out . This study examined the ease of production and assembly of the new product and confirmed its quality. If any problems were encountered, a Trial-Manufacture Problem Document was issued.

Reducing the Time to Market

Players in the highly competitive market for excavators and bulldozers had begun to compete based on the time it took to get new products to market. Part of Komatsu's plan to improve its design for manufacturing was to change its relationship with its suppliers. In 1993, Komatsu manufactured about 30% of its products, designed and subcontracted another 50%, and purchased from outside suppliers the remaining 20%.

Target Costing

Throughout the product development process, target costs played a critical role in ensuring that the product would be profitable when released for mass production. The preliminary target costs used in the long-range development plan for major subassemblies, such as the engine, power train, and cooling system, were developed from prior experience with similar subassemblies and discussions with production and engineering.
These preliminary target costs or target values, were used to help identify when the application of cost reduction techniques was required.

Product engineers were expected to identify several design alternatives for each major subassembly of a new product. Two factors were considered: quality and cost. A new design alternative was only adopted if it achieved both the desired levels of quality and cost. Frequently, one of the alternatives proposed produced a higher quality product but at a higher cost. The product engineers then explored ways to manufacture the higher quality alternative at a lower cost. If a cost-effective way to implement the new alternative was identified, then it was adopted; otherwise, the alternative was abandoned or subject to further study for future applications.

The process of design analysis in the way the engine and torque converter, transmission, and steering clutch and brakes were positioned in the firm's larger bulldozers. In the old design, these three modules were physically separate. This approach, required 86 hours to mount and dismount these modules during maintenance.

The process of functional analysis at Komatsu can be illustrated by the development of the target cost of an excavator cooling system. It began with an analysis of the functions of the cooling system and how they were achieved. The primary function was identified as its cooling capacity; secondary functions included how quickly it started cooling after the engine was first switched on and how stable a temperature it maintained.

The determinants of cooling capacity were ranked in the order of importance. The most important determinant of cooling capacity was identified as the surface area of the radiator. The second most important determinant was the size of the fan, followed by the rotation speed of the fan, the volume of water in the system, and the ambient air temperature, The functional analysis began by plotting the cooling capacity versus the radiator surface area for all existing products that used the same type of cooling system.

Required:

Describes Komatsu's Competitive Environment

Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Labour law
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.