In the power system network shown in Figurebelowbus 1 is a slack bus with V = 1.020° per unit and bus 2 is a load bus with S2 = 300 MW + 80 Mvar. The line impedance on a base of 100 MVA is Z = 0.01 + j0.02 per unit. (a) Using Gauss-Seidel method, determine V2. Use an initial estimate of V = 1.0+ j0.0 and perform two iterations. i.e.Deternine (a)V,' and (b)Vz? %3D %3D %3D Z12 0.01+ j0.0 2 %3D 2 S2 300 MW +j80 Mvar
In the power system network shown in Figurebelowbus 1 is a slack bus with V = 1.020° per unit and bus 2 is a load bus with S2 = 300 MW + 80 Mvar. The line impedance on a base of 100 MVA is Z = 0.01 + j0.02 per unit. (a) Using Gauss-Seidel method, determine V2. Use an initial estimate of V = 1.0+ j0.0 and perform two iterations. i.e.Deternine (a)V,' and (b)Vz? %3D %3D %3D Z12 0.01+ j0.0 2 %3D 2 S2 300 MW +j80 Mvar
Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter6: Power Flows
Section: Chapter Questions
Problem 6.23MCQ
Related questions
Question
Power system
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning