How does the contract administration use the work flow?
Contract administration could be defined as a multi-stage process that goes on through the entire duration of the contract and ensures that the parties meet their contractual obligations in order to deliver the specific objectives provided in the contract.
The main purpose of contract administration is to make sure that the objectives of the contract(supply of goods, delivery of services or execution of works) are met in a timely fashion and value for money is achieved. In practice this means optimizing the efficiency of the processes, balancing costs and risks against returns and ideally aiming for a continuous
improvement in performance over the life of the contract.
Contract administration is responsible for making the contract successful by involving construction Industry participants, Bidding Requirements and Process, alternatives and Substitutions, standards and Regulatory Influences, Site Activities and
execution of the work description, Certificate of Payment, Changes in the Work, Dispute Resolution,Construction Insurance, Construction Surety Bonds, Guaranties and Warranties, Project Submittal, Contract Close-Out, Commissioning, Definitions and Resources.
Step by stepSolved in 2 steps with 1 images
- What are the payment provisions under the construction act?arrow_forwardWhat are the responsibilities of a general contractor?arrow_forwardProblem 4 The 7/8 in diameter pins at A and C that support the structure are in single shear. Find the largest force F that can be applied to the structure if the working shear stress for these pins is 5000 psi. Neglect the weights of the members. ANS: F = 3190 lb-f > 5 of 6 2 ft C Q 4 ft B 6 ft 3 ftarrow_forward
- In building contract documents, what are main differences between General Conditions and SupplymentaryConditions? What is the other name of Supplymentary Conditions?arrow_forwardWhy should the Resident Project Representative not receive the submittals from the sub-contractors directly?arrow_forwardWhy is it necessary to retain at least one set of original contract documents that were issued for biddingarrow_forward
- Structural Analysis (10th Edition)Civil EngineeringISBN:9780134610672Author:Russell C. HibbelerPublisher:PEARSONPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Fundamentals of Structural AnalysisCivil EngineeringISBN:9780073398006Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel LanningPublisher:McGraw-Hill EducationTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning