Principles of Accounting Volume 2
19th Edition
ISBN: 9781947172609
Author: OpenStax
Publisher: OpenStax College
expand_more
expand_more
format_list_bulleted
Question
QS: General Accounting 3.2
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by stepSolved in 2 steps
Knowledge Booster
Similar questions
- Granite Peak Construction mixes concrete using a 3:2:1 ratio of cement, sand, and gravel. If one batch requires 300 kg total and cement costs $2/kg, sand $1.20/kg, and gravel $0.80/kg, determine the cost per batch.arrow_forwardHuron Company produces a commercial cleaning compound known as Zoom. The direct materials and direct labor standards for one unit of Zoom are given below: Standard quantity or hours of direct materials: 7.40 pounds, standard price or rate of direct materials is 2.60 per pound. Standard cost of direct materials is 19.24. Standard quality or hours of direct labor is 0.45. Standard price or rate of direct labor is 8.00 per pound. Standard cost is 3.60. During the most recent month, the following activity was recorded: 12,100 pounds of material were purchased at a cost of 2.50 per pound. All of the material purchased was used to produce 1,500 units of the product. 575 hours of direct labor time were recorded at a total labor cost of 5,750. Compute the materials price variance and the materials quantity variance for the month. Complete the labor rate variance and efficiency variance for the month.arrow_forwardThe cost of materials for product A are as follows. Material W: $2,250 Material X: $3,000 Material Y: $3,600 Material Z: $150 If the material proportions were displayed on a pie chart, how many degrees would material Y represent? A 90 degrees B 120 degrees C 144 degrees D 204 degreesarrow_forward
- Firm X has a production process that has a total joint cost of $14,000. At the split-off point, there are 1,000 pounds of Product 1 and 3,000 pounds of Product 2. What is the cost per pound of Product 1 using the physical measure method?arrow_forwardA chemical company is considering two types of incinerators to burn solid waste generated by a chemical operation. Both incinerators have a burning capacity of 20 tons per day. The following data have been compiled for comparison of the two incinerators: If the firm's MARR is known to be 13%. determine the processing cost per tonof solid waste for each incinerator. Assume that incinerator B will be availablein the future at the same cost.arrow_forwardGlassworks makes products for the sandblasting industry. One of the products they make is bags of high-grade sandblasting media that is made from a combination of quartz-sand and recycled ground-glass (cullet). Standard costs and quantities to produce one bag of sandblasting media are as follows: Quantity Cost Quartz-sand 20 kg $4.00 Cullet 5 kg $3.00 80,000 bags of sandblasting media were produced. Actual purchases and inventories were: Beginning Ending Purchases Purchases Inventory Inventory (in kg) ( in $) Quartz-sand 0 kg 0 kg 1,610,000 kg $322,161 Cullet 0 kg 120,000 kg 550,000 kg $286,000 Required: Calculate the following variances: a)Total direct material efficiency variance. b)Total direct material mix variance.…arrow_forward
- P Alvarez Company makes three joint products, products A, B, and C. For each batch, the materials cost is $22,500, direct labor cost is $6,600, and manufacturing overhead is $13,900. From each batch, the company makes 4,300 pounds of A, 3,200 pounds of B, and 2,500 pounds of C. Required: a. What are the total joint costs for each batch of the products? b. Allocate the joint costs to each of the three products. c. Determine the cost per pound for product A. a. Total joint costs b. Amount of joint costs allocated to A b. Amount of joint costs allocated to B b. Amount of joint costs allocated to C c. Cost for product A per poundarrow_forwardTwo alternatives are under consideration for a tapered fastening pin. Either design will serve the purpose and will involve the same material and manufacturing cost except for the lathe and grinder operations. Design A will require 16 hours of lathe time and 4.5 hours of grinder time per 1,000 units. Design B will require 7 hours of lathe time and 12 hours of grinder time per 1,000 units. The operating cost of the lathe including labor is ₱200 per hour. The operating cost of the grinder including labor is ₱150per hour. Which design should be adopted if 100,000 units are required per year and what is the economic advantage of the best alternative?arrow_forwardMalloy Milling grinds calcined alumina to a standard granular size. The mill produces two different size products, regular grind and super grind, from the same raw materials. After reviewing the production rate, demand, and profit for each of the two types of grind, Malloy Milling found the following linear optimization model for profit, where R is the number of tons of regular grind produced and S is the number of tons of super grind produced. Implement the linear optimization model on a spreadsheet and use Solver to find an optimal solution. Interpret the Solver Answer Report, identify the binding constraints, and verify the values of the slack variables. Maximize Profit=1000 R+ 1800 S R+S≥700 R S 5 3 R≥400 S≥200 $168 (Total production) (Time limitation) (Demand for regular grind) (Demand for super grind) Implement the linear optimization model and find an optimal solution. Interpret the optil solution. The optimal solution is to produce tons of regular grind and tons of super grind.…arrow_forward
- Use the information provided to calculate standard costs: To make one switch it takes 17 feet of plastic-coated copper wire and 0.9 pounds of plastic material. The plastic material can usually be purchased for $17 per pound, and the wire costs $2.67 per foot. The labor necessary to assemble a switch consists of two types. The first type of labor is assembly, which takes 3.3 hours. These workers are paid $26 per hour. The second type of labor is finishing, which takes 2.2 hours. These workers are paid $28 per hour. Overhead is applied using labor hours. The variable overhead rate is $14.39 per labor hour. The fixed overhead rate is $14.94 per hour. What is the total standard cost for direct materials? Round to the nearest penny, two decimal places.arrow_forwardHaggstrom, Inc., manufactures steel fittings. Each fitting requires both steel and an alloy that allows the fitting to be used under extreme conditions. The following data apply to the production of the fittings. Direct materials per unit 3 pounds of steel at $0.55 per pound 0.5 pounds of alloy at $1.90 per pound Direct labor per unit 0.02 hours at $30 per hour Overhead per unit Indirect materials Indirect labor Utilities Plant and equipment depreciation Miscellaneous $0.60 0.75 0.55 0.90 0.70 Total overhead per unit $3.50 The plant and equipment depreciation and miscellaneous costs are fixed and are based on production of 250,000 units annually. All other costs are variable. Plant capacity is 300,000 units annually. All other overhead costs are variable. The following are forecast for year 2. Contract negotiations with the union are expected to lead to an increase in hourly direct labor costs of 4 percent, mostly in the form of additional benefits. Commodity prices, including steel,…arrow_forwardTwo separate processes are being considered for manufacturing a product. Process A has fixed costs of $12,000 and variable costs of $6 per unit. Process B has fixed costs of $16,000 and variable costs of $4 per unit. a. What is the break-even quantity for the two processes (Show your work)? b. Which process would be more cost-effective for producing 1,000 units? c. Which process would be more cost-effective for producing 3,000 units?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Principles of Accounting Volume 2AccountingISBN:9781947172609Author:OpenStaxPublisher:OpenStax CollegeFinancial And Managerial AccountingAccountingISBN:9781337902663Author:WARREN, Carl S.Publisher:Cengage Learning,Managerial AccountingAccountingISBN:9781337912020Author:Carl Warren, Ph.d. Cma William B. TaylerPublisher:South-Western College Pub
Principles of Accounting Volume 2
Accounting
ISBN:9781947172609
Author:OpenStax
Publisher:OpenStax College
Financial And Managerial Accounting
Accounting
ISBN:9781337902663
Author:WARREN, Carl S.
Publisher:Cengage Learning,
Managerial Accounting
Accounting
ISBN:9781337912020
Author:Carl Warren, Ph.d. Cma William B. Tayler
Publisher:South-Western College Pub