Freshly mined ore is to be cleaned so that later processing units are not contaminated with dirt. 3000 kg/h of dirty ore is dumped into a large washer, in which water is allowed to soak the ore on its way to a drain at the bottom of the unit. The solubility of dirt in water is estimated to be 0.4 g dirt/cm? water (or 0.4 g dirt/g H,0, assuming that the water leaving the washer is saturated with dirt). The amount of dirt remaining on the ore after this process is negligible, but water remains absorbed on the ore surface such that the net mass flow rate of the cleaned ore is 3100 kg/h. The dirty water is cleaned in a settler, which is able to remove 90% of the dirt in the stream without removing significant amount of water. The cleaned stream is then combined with a fresh water stream through a mixer before re-entering the washer. The wet, clean ore enters a dryer, in which all of the water is removed. Dry ore is removed from the dryer at 2900 kg/h. 1. Draw a complete diagram of the whole process. Label all streams properly. 2. Perform a degree-of-freedom analysis. 3. Determine the mass flow rate of fresh water to achieve the significant removal of dirt from the freshly mined ore. 4. Calculate the mass of dirty water entering the settler per minute of operation. 5. Calculate the mass fraction of dirt in the stream that enters the washer (after it has been mixed with the freshwater stream).

Introduction to Chemical Engineering Thermodynamics
8th Edition
ISBN:9781259696527
Author:J.M. Smith Termodinamica en ingenieria quimica, Hendrick C Van Ness, Michael Abbott, Mark Swihart
Publisher:J.M. Smith Termodinamica en ingenieria quimica, Hendrick C Van Ness, Michael Abbott, Mark Swihart
Chapter1: Introduction
Section: Chapter Questions
Problem 1.1P
icon
Related questions
Question
Freshly mined ore is to be cleaned so that later processing units are not contaminated with dirt. 3000 kg/h of dirty ore is
dumped into a large washer, in which water is allowed to soak the ore on its way to a drain at the bottom of the unit. The
solubility of dirt in water is estimated to be 0.4 g dirt/cm? water (or 0.4 g dirt/g H,0, assuming that the water leaving the
washer is saturated with dirt). The amount of dirt remaining on the ore after this process is negligible, but water remains
absorbed on the ore surface such that the net mass flow rate of the cleaned ore is 3100 kg/h. The dirty water is cleaned in a
settler, which is able to remove 90% of the dirt in the stream without removing significant amount of water. The cleaned
stream is then combined with a fresh water stream through a mixer before re-entering the washer. The wet, clean ore enters
a dryer, in which all of the water is removed. Dry ore is removed from the dryer at 2900 kg/h.
1. Draw a complete diagram of the whole process. Label all streams properly.
2. Perform a degree-of-freedom analysis.
3. Determine the mass flow rate of fresh water to achieve the significant removal of dirt from the freshly mined ore.
4. Calculate the mass of dirty water entering the settler per minute of operation.
5. Calculate the mass fraction of dirt in the stream that enters the washer (after it has been mixed with the freshwater
stream).
Transcribed Image Text:Freshly mined ore is to be cleaned so that later processing units are not contaminated with dirt. 3000 kg/h of dirty ore is dumped into a large washer, in which water is allowed to soak the ore on its way to a drain at the bottom of the unit. The solubility of dirt in water is estimated to be 0.4 g dirt/cm? water (or 0.4 g dirt/g H,0, assuming that the water leaving the washer is saturated with dirt). The amount of dirt remaining on the ore after this process is negligible, but water remains absorbed on the ore surface such that the net mass flow rate of the cleaned ore is 3100 kg/h. The dirty water is cleaned in a settler, which is able to remove 90% of the dirt in the stream without removing significant amount of water. The cleaned stream is then combined with a fresh water stream through a mixer before re-entering the washer. The wet, clean ore enters a dryer, in which all of the water is removed. Dry ore is removed from the dryer at 2900 kg/h. 1. Draw a complete diagram of the whole process. Label all streams properly. 2. Perform a degree-of-freedom analysis. 3. Determine the mass flow rate of fresh water to achieve the significant removal of dirt from the freshly mined ore. 4. Calculate the mass of dirty water entering the settler per minute of operation. 5. Calculate the mass fraction of dirt in the stream that enters the washer (after it has been mixed with the freshwater stream).
Expert Solution
steps

Step by step

Solved in 6 steps with 13 images

Blurred answer
Recommended textbooks for you
Introduction to Chemical Engineering Thermodynami…
Introduction to Chemical Engineering Thermodynami…
Chemical Engineering
ISBN:
9781259696527
Author:
J.M. Smith Termodinamica en ingenieria quimica, Hendrick C Van Ness, Michael Abbott, Mark Swihart
Publisher:
McGraw-Hill Education
Elementary Principles of Chemical Processes, Bind…
Elementary Principles of Chemical Processes, Bind…
Chemical Engineering
ISBN:
9781118431221
Author:
Richard M. Felder, Ronald W. Rousseau, Lisa G. Bullard
Publisher:
WILEY
Elements of Chemical Reaction Engineering (5th Ed…
Elements of Chemical Reaction Engineering (5th Ed…
Chemical Engineering
ISBN:
9780133887518
Author:
H. Scott Fogler
Publisher:
Prentice Hall
Process Dynamics and Control, 4e
Process Dynamics and Control, 4e
Chemical Engineering
ISBN:
9781119285915
Author:
Seborg
Publisher:
WILEY
Industrial Plastics: Theory and Applications
Industrial Plastics: Theory and Applications
Chemical Engineering
ISBN:
9781285061238
Author:
Lokensgard, Erik
Publisher:
Delmar Cengage Learning
Unit Operations of Chemical Engineering
Unit Operations of Chemical Engineering
Chemical Engineering
ISBN:
9780072848236
Author:
Warren McCabe, Julian C. Smith, Peter Harriott
Publisher:
McGraw-Hill Companies, The