Föllowing data is available from time study on a job: Representative time = 1 minute Rating = 125% Allowances = 25% of Standard Time Determine the Standard time for the completion of job.
Q: 25 mm Hg -> 0.09 m2 150 mm Water Problem 4.17 4.17. For a flowrate of 2 m'/s of air (y = 12.0 N/m')…
A:
Q: - The state of plane stress at a point is shown on the element in Figure below. Represent this state…
A:
Q: A reheat cycle with two stages of reheating is executed with steam expanding initially from 25 MPa…
A:
Q: A particle rotates clockwise in accordance with the equation θ = 32 + 24t – 2t3 where θ is in…
A:
Q: In the system of reservoirs shown below, the flow of Reservoir 1 to Reservoir 2 is Q=15 cfs. At…
A: Consider the given data
Q: a speed booster. The input shaft rotates at 500 rpm and has a sheave iameter of 7.218 in and the…
A:
Q: A particle is moving along a curved path. At a certain instant when the slope is 0.75, ax = 2 m/s2…
A: (a) Write the given data. ax=2 m/s2ay=3 m/s2tanθ=0.75θ=tan-10.75=36.87°
Q: Question 1: Which of the following cross-sections has the largest moment of Inertia (INA)? The…
A: Given:
Q: Discussion object are the same? 2- When and why will the floating object become unstable?
A: This question is based on the topic of fluid mechanics in which it discusses about stability of…
Q: Water flows at 960 gal/min through the 8-in diameter pipe. As it passes through the filter the…
A: Find the loss coefficient for filter.
Q: A bolted single lap joint shown in the figure below is designed to join two sheets of wood using a…
A:
Q: A hollow steel propeller shaft, 20 ft. long with 15 in outer diameter and 12 in. inner diameter,…
A:
Q: A spherical balloon is filled with 6 kg of hydrogen gas (H2) at 2 bar and 20 °C. Which nearly gives…
A: Find the diameter of balloon .
Q: PROBLEM 2.33 An axial force of 60 kN is applied to the assembly shown by means of rigid end plates.…
A:
Q: 1. A drive shaft to the blades of a helicopter transmits 800 kW at 200 rev/min. Neglecting…
A: Given, Power - 800kW N-200rpm L-2m or 2000mm C-26900MPa, Do=2Di
Q: 3.6 Two forces, each of magnitude P, are applied to the wrench. The diameter of the steel shaft AB…
A: Diameter of the steel shaft AB, D= 15 mm Maximum allowable shear force in the shaft, τ= 120 MPa…
Q: 2. A helical compression spring is made with oil-tempered wire with a diameter of 0.2 in, outside…
A:
Q: Question 2 The couple M acts in a vertical plane and is applied to a beam oriented as shown.…
A: given data-S6×12.5 ralled steal shapeI2=22.1 in4Iy=1.82 in4ZE=Z=-ZA=-ZB=12×3.33=1.665…
Q: 1 pound mass of steam expands isentropically from 300psia and 600°F to atmosphere 14.696 psia. Use…
A:
Q: Mechanical Engineering. Please help to solve, will upvote after. What is the change in length of a…
A:
Q: A cylindrical piece of steel with a diameter of 3 [cm], it is subjected to a torque of 1200 [kgf -…
A: Answer: The maximum efforts applied is 800 kgf.
Q: (14) Find the total shear load on each of the three bolts for the connection shown in the figure and…
A:
Q: Question 2 The couple M acts in a vertical plane and is applied to a beam oriented as shown.…
A:
Q: 2.72. Find the force P required to hold the gate in the position shown in Figure P2.72. The gate is…
A:
Q: calculate total moment at... At point O in this system. 500 N Choose... 3 m Choose.. 2234NM 1060NM…
A:
Q: Two (2) rods of the same material each has a diameter of 20mmare welded together to form a total…
A:
Q: Part A The 25-lb slender rod has a length of 6 ft. Using a collar of negligible mass, its end A is…
A:
Q: Calculate the reservoir volume filtered in an affinity absorption system plasma filtrate flows…
A: Given Diameter, d = 0. 5mm Velocity, u = 2 mL/min Volume, V = 0.02 mg/mL Find Volume…
Q: The right-angle bar is supported by a pin at B and a roller at C. What is the shear stress in the…
A:
Q: Which of the following are the assumptions in designing boiler joints? I. Crushing stress varies…
A: Write the assumptions used in the designing of the Boiler joints: The load is equally distributed…
Q: um E. The characteristic velocity U. The mean velocity in the main channel is 100 Peclet number for…
A: deionized water and a solution =10 nm particleD=1×10-14m2/s in water the mean velocity in the main…
Q: Three cables are joined at the junction ring C. Determine the tensions in cables AC and BC caused by…
A:
Q: QUESTION 3 The refrigeration plant onboard a fishing vessel maintain minus 20 °C in a fish storage…
A: Given: T2-T1=10oC (superheat)T5-T6=10oC(Subcool))ηv=80%bore d=100mmstroke, l=150mmN=1500 rpmTo…
Q: Steam, initially at 5 MPa, 280°C undergoes a polytropic process in a piston–cylinder assembly to a…
A: Given Pressure, P1 = 5 MPa P2 =20 MP Temperature, T1 = 280°C = 503 K Find Heat…
Q: 6. Refer to figure 2. Bar АВCD with cross-sectional FIGURE 2 area equal to 600 mm?. Determine the…
A:
Q: What is the minimum thickness of a normal weight concrete cantilever slab with length of 2.96 m and…
A: The minimum thickness of the concrete slab can be calculated using the PURE BENDING EQUATION, which…
Q: 3. In an ideal Diesel engine compression is from 14.7 psia, 80°F, 1.43 cu ft to 500 psia. Then 16…
A: given; →initial pressure(P1)=14.7psia→initial temperature(T1)=800F…
Q: Q 10. The air with enthalpy of 125 k/kg is compressed by an air compressor to a pressure and…
A:
Q: etermine the maximum shear and moment for the beam shown below. 2000 lb 400 lb/ft Hinge A E В D - 4…
A:
Q: DHLIPS pts cuments/Week12 Compatibility 21-22-1%20(1).pdf 30 /31 - 100 + PROBLEM 2.35 The 1.35 m…
A: Find the stress in steel and concrete.
Q: se Mohr's circle to find the stress on the slope indicated by the dotted line when the stress state…
A:
Q: Q.1 Design a compression coupling for a shaft to transmit 1300 N-m. The allowable shear stress for…
A:
Q: Subject - Evaluate the factors that inform the selection of a renewable energy system in relation to…
A: Introduction: Renewable energy technology consists of ecofriendly technology where output of the…
Q: 1 m 4 kN- 1 m 2 kN - B C A -2 m 2 m -2 m 2 m
A: Support Reactions:
Q: 5 mm 20 mm 5 mm PROBLEM 2.33 An axial force of 60 kN is applied to the assembly shown by means of…
A:
Q: Q 18. A uniform gas pressure of 435 kN/m acts on a semicircular plane area of diameter 1 m.…
A:
Q: 9(1) 4 h, (1) valve A valve C %(!) One equation describing the system is O a (HI-H2)/RA-QB Ob.…
A:
Q: Superheated steam at a pressure of 300 bar and a temperature of 550 ℃ enters a turbine made up of…
A: To find (a) Sketch the cycle in a T-s diagram and calculate the enthalpy at each point of the…
Q: A saturated steam at 410K is being transported in a pipeline (brass drawing tubing) at a rate of 1…
A: Given data Temperature of saturated steam = 410 KMass flow rate = 1 g/s = 10-3 kg/s = 0.001…
Q: An unsteady velocity field V = xy'ti + zxj – t°k exists at the 3D plane along a streamline that…
A:
Step by step
Solved in 2 steps with 1 images
- Question: A 2-station flow system operates with m = 1 each. Jobs arrive every 5 minutes on average with CV 1.2. The service rate of the first station is 15 per hour with CV 0.5, and the service rate of the second station is 20 per hour with CV 0.75. What is the wait time on average for the second station? a. b. - F Assume that the job arrival rate is now 15 per hour, and that the second station has a limited queue size of 6. What are the throughput and cycle time for the line now?Processing times (including setup times) and due dates for six jobs waiting to be processed at a work centre are given in the table. The average tardiness (in days) using shortest processing time rule is (correct to two decimal places). Job Processing time (days) Due date (days) 3 8 7 16 4 4 D 9 18 E 17 F 13 19 B.A(n) ________ displays a magnified image of a part on a screen for conducting measurement.
- Table 3 shows the process sequence in a production line and its related direct time study data. The production process must follow a specific route of processes A, B, C, and D respectively. Task A is in full automatic mode and requires one operator at the workstation. The worker at task B was rated with 90%, the worker at task C was rated with 115% and the worker at task D was rated with 80%. The standard allowances accepted by the company are 6% for fatigue, 5% for personal, and 4% for delay. The normal operating period is 8 hours per day and 24 days per month. Analyse the given information and determine the standard time for the product in minutes. Table 3: Average Processing Time (minutes) Job Description Average Processing Time A Automatic B Manual 40 C Manual 30 D Manual 35Consider the following tasks that must be assigned to four workers on a conveyor-paced assembly line (i.e., a machine-paced line flow). Each worker must perform at least one task. There exists unlimited demand unless stated otherwise. Time to Complete Task (seconds): Task 1: 30 Task 2: 25 Task 3: 15 Task 4: 20 Task 5: 15 Task 6: 20 Task 7: 50 Task 8: 15 Task 9: 20 Task 10: 25 Task 11: 15 Task 12: 20 The current conveyor-paced assembly-line configuration assigns the workers in the following way: • Worker 1: Tasks 1, 2, 3 • Worker 2: Tasks 4, 5, 6 • Worker 3: Tasks 7, 8, 9 • Worker 4: Tasks 10, 11, 12 What is the capacity of the current line (in units per hour)?If you give wrong answer - i will report you... and dislike this Q1. You are analyzing a process with an average processing time of 1 minute and an interarrival time of 10 seconds. There are 7 servers and CVa is 1.3 and CVp is .80. What is average time in queue? What is the average total flow time? Answer both parts correct to get upvote.
- A hospital must order the drug Porapill from the manufacturer of the drug. It costs $500 to place an order. Annual demand for the drug is normally distributed with mean 10,000 and standard deviation 3000, and it costs $5 to hold one unit in inventory for one year. (A unit is a standard container for the drug.) Orders arrive one month after being placed. Assume that all shortages are backlogged. a. What (R,Q) policy should the company use if it wants to meet 95% of all customer demand from existing inventory? b. Suppose the company could pay C dollars per year to decrease its lead time per order from one month to half a month. What is the most it would be willing to pay to do this (and still have a 95% service level)?True, False or Uncertain. Explain your answer. Own wage elasticity JELLlincrease if product demand elasticity n? is high. In short run, when there is an increase in wage rate, each firm will hire less labor and so the industry labor demand is simply the horizontal summation of firm's labor demand. а. b. Labor demand is represented by the marginal revenue produce schedule (MRP) when we have competitive product market while it will be represented by the value of marginal product schedule (VMP) when we have a product market monopolist. When elasticity of substitution, SLK, increase that means the L and K are less substitutable, and the isoquant will be L-shaped. Minimum wage imposed by the government is always bad for the economy because it increase unemployment and deadweight loss. с. d. e. 3.The Union Manufacturing Company is producing two types of products: A and B. The demand forecasts, batch size, and time standards follow in table 2: Table No 2 Product A Product B Demand forecast (units/yr) 1,000 4,000 Batch size (units/batch) 20 10 Processing time (hr/unit) 3.2 4.5 Setup time (hr/batch) 10 20 Both products are produced on the same machine, called Mark I. i) What is the total number of hours required of Mark I equipment for the next year? ii) The company works 250 days per year and operates two shifts, each covering 8 hours. If a 15 percent capacity cushion is maintained, how many hours of capacity can the company expect from each of its Mark I machines?
- Basic Manufacturing Process with 2 Job Types + Inspection Time between job arrivals at a machining station is exponentially distributed with mean 4.4 minutes. There are 2 types of jobs to be processed 30% of which is Type 1 and, 70% are of Type 2. Processing times are exponentially distributed. Mean processing time for Type 1 is 4.8 minutes, for Type 2 it is 2.5 minutes. After the job is processed, they go through an inspection process with one single inspector and an inspection time with triangular distribution (1,2,3.5). Inspector decides whether the part is good enough, scrap or should be reworked. 80% of the parts produced is good, 10 % is scrap and the rest needs rework. Rework is done by the same manufacturing machine. The priority among the parts will be Part1 first, part2 second and reworks of both type comes later. Rework time is normally distributed with mean 2 minutes and 0,2 std dev. Simulate the system for one 8-hour day.1. The work-study engineer carries out the work sampling study for 120 hours. The following observations were made for a machine shop: Total number of observations 7000 No. of Idle activities 1200 Ratio between manual to machine elements 3 : 1 Average rating factor 120% Total number of jobs produced during study 800 units Rest and personal allowances 17% Compute the standard time for the job.1. Table 1 shows a direct time study data from an assembly line. Job element B is in automatic mode while other job elements are in manual operations. The delay allowance is 5%, fatigue allowance is 8% and personal allowance is 7%. Please use 4 decimal places for the rating value and 3 decimal places for your standard time. Table 1: Direct time study data Job Average Rating Element Process Time A 100 1+0.001(264) B 25 1 1+ 0.002(264) 1-0.001(264) 1 - 0.0005(264) C 40 100 E 200 i. Calculate standard time for Job Element A. ii. Calculate standard time for Job Element B. 111. Calculate standard time for Job Element C. iv. Calculate standard time for Job Element D. V. Calculate standard time for Job Element E. vi. Calculate the overall standard time for the whole process.