Find the rating of generators that must be installed in a hydro electric project serving a load factor of 35%. The generators are to be located 38 m below the 6,000,000,000 m² catchment area. Assume an annual rainfall of 1.6 m and an overall efficiency of 75%.

icon
Related questions
Question
Please solve asap.
Find the rating of generators that must be installed in a hydro electric project serving a load
factor of 35%. The generators are to be located 38 m below the 6,000,000,000 m² catchment
area. Assume an annual rainfall of 1.6 m and an overall efficiency of 75%.
Transcribed Image Text:Find the rating of generators that must be installed in a hydro electric project serving a load factor of 35%. The generators are to be located 38 m below the 6,000,000,000 m² catchment area. Assume an annual rainfall of 1.6 m and an overall efficiency of 75%.
Expert Solution
steps

Step by step

Solved in 3 steps

Blurred answer