e. List three principal factors that influence the amount of consumptive use and the diversion requirement.
Q: What are the different integrated watershed management practices?
A: The integrated watershed(IWE) Is the procedure of managing different activities like human…
Q: Compute the peak flow of a new residential area consists of 2000 unit houses and 5000m2 gross area…
A: It is required to determine the equivalent population (PE). According to MS 1228:1991, the…
Q: Estimate Ø-index for a watershed having an area 5 acres. The runoff volume caused by the rainfall is…
A:
Q: List 5 groundwater pollution source and 3 contaminants each associated with them.? List 3…
A: List 5 groundwater pollution sources and 3 contaminants each associated with them are; Surface…
Q: Given the following tabulate data for wastewater discharge permit review, find the minimum…
A:
Q: Discuss the factors that influence infiltration and runoff. What measures can be undertaken to…
A: Factors affecting (A) Infiltration (1) Amount and type of precipitation (2) Organic materials…
Q: The Rational method is simple and straight forward but must be applied with caution. For example, in…
A: Ans. True Explanation given below:
Q: What is the design discharge that can provide a 6-day requirement of 5-ha farm in 8 hours if the…
A: Given data, Operational hours h = 8 hrs Operational days d = 6 days Application rate SINgross = 10…
Q: Given the following tabulate data for wastewater discharge permit review, find the minimum…
A: Following is the given information: To find: The minimum down stream DO that could be expected.
Q: Which one of these processes is considered losses in the sub - surface flow ? A- Groundwater flow.…
A: To find subsurface losses :-
Q: Determine the hydrologic risk of a 287-year flood occurring during the 34-year service life of a…
A:
Q: You were involved in the design of a drain for an urban road. What were the limitations that you…
A: Solution: Rational Method or Rational Equation: The formula for the calculation of runoff or peak…
Q: Which one of these processes is considered losses in the hydrological cycle? a. Interception b.…
A: In hydrological cycle losses are: i. Evaporation ii. Transpiration iii. Interception......
Q: What is meant by antecedent moisture conditions? How do they affect surface runoff?
A: Antecedent moisture may be defined as the relative wetness or dryness of a sewershed, which changes…
Q: areas of consideration for the Limited financial budget of Dam
A: Dams are heavy structures build across a river or a stream. They are to be constructed for a long…
Q: Determine the water demand, 1 residential area?
A:
Q: Read the question carefully and give me right solution according to the question. A watershed…
A: Given - 60% grass cover Group A soil P= precipitation =68mm Antecedent rainfall = 34mm in 5 days…
Q: Question 1 Differentiate and explain between the following types of distribution pumping system. i.…
A: As per company policy we are supposed to answer only first question . Kindly post other question as…
Q: Urban Flooding
A: Urban flooding is significantly different from rural flooding as urbanization leads to developed…
Q: Given the following tabulate data for wastewater discharge permit review, find the minimum…
A: The formula to calculate the initial DO is given by, DO=QRDOR+QWDOWQR+QW ...1 Substitute…
Q: Determine the peak runoff rate of a 70-hectare forest with matured woodland with a rainfall…
A:
Q: What is a flow-duration curve? What information can v=be gathered from a study of flow-duration…
A: Hi! Thank you for the question As per the honour code, We’ll answer the first question since the…
Q: A catchment area has a time of concentration of 20 minutes, an area of 20 has. and a runoff…
A:
Q: Which urban land use type contributes the highest runoff flow rates? Group of answer choices a)…
A: runoff : Natural runoff occurs when soil is eroded and carried to different bodies of water. Natural…
Q: What effect do such losses have on your initial analysis of full-flow discharge? What other loss…
A: Given, L = 3.34 km or 3340 m D = 1000 mm or 1 m Q = 0.99 m3/s
Q: The table below shows the observed rainfall intensity on a 2.26 km2 catchment area. Estimate the o…
A: Given data Total runoff during rainfall ( volume) = 282097 m3 Catchment area (A) = 2.26 Km2
Q: 1- Draw the hyetograph for storm. 2- Estimate the d-index of the storm If the direct runoff produced…
A: Hyetograph is the graph between rainfall Intensity(cm/hr) in Y-axis to Time in X-axis.
Q: If in the project in question 1 the public agency, instead of building the pump station, decides to…
A: Since the pipeline requires to be reroute between points A and B, then there will be authorization…
Q: For a watershed drainage area that is 10 acres with an elevation drop of 6 feet over a flow length…
A: The values given in the question are as follows Watershead drainage area(A)=10 acres Elevation…
Q: Determine the size of a canal that can carry the irrigation requirements for a 50-hectare rice…
A: A canal is a rigid boundary channel that can accommodate and withstand much higher velocity than…
Q: How does educating a community on quantitative measures of watershed characteristics approach help…
A: Brief concept- Watershed characteristics- A watershed is an area that drains to a water body such as…
Q: .) What is runoff? What is the importance of determining runoff volume?
A: RUNOFF the amount of water discharged in surface streams is runoff. it not only includes the water…
Q: Which of the options below best describe the changes to stormwater runoff after an area is…
A:
Q: A watershed is divided into sections as shown below. Runoff from each section will contribute to…
A:
Q: What are the anticipated functions of interceptor drains as conventionally used for highway and…
A: Interceptor drains are defined as a type drainage system whose main function is collecting,…
Q: During a flood in a catchment, when all streams are filled with water, the runoff value is ? A- at…
A: Finding out the runoff value when during flood all streams are filled with water.
Q: A potential site for a reservoir is being evaluated for two mutually exclusive options: a small…
A:
Q: Discuss the components of "Total Runoff."
A: In hydrology, runoff is the amount of water that is released into natural streams. Besides the…
Q: The flowrate at the outlet of a watershed for 2-hr rain event is given in the table. Base flow is 20…
A: Given: Base flow = 20 cfs Runoff depth = 2 inchs Time, hr Q, cfs 0 20 1 26 2 30 3 34…
Q: The table below shows the observed rainfall intensity on a 2.26 km2 catchment area. Estimate the o…
A:
Q: Consider two catchments of the same area, general topography and land cover. The one catchment is…
A:
Q: Suppose lo mils of discharge Is SUFFiCient to loigate 3000 hact are of Land for a perticular (op…
A: Introduction : In this question we are provided with value of area to be irrigated and amount of…
Q: Calculate the runoff from a watershed of (0.01 x 4737) ha. The following data are available: Depth…
A: To find runoff
e. List three principal factors that influence the amount of consumptive use and the diversion requirement.
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- From these results, using the water quaility assesment, can you determine if the water is safe or not?Under the SS Credit, how would one achieve points under the Rainwater Management strategy?From the following data, determine the following: Activity Duration in Weeka 1-2 1-3 1-4 6 2-6 7 - the Free Float the Critical Activities/Path • the Expected Completion Time 3-4 3-6 10 4-5 4-7 7 5-7 6 -7 6-8 6 - 10 12 7-9 3 8- 10 9- 10
- List five river diversion methods and briefly discuss under which conditions each of the methods is usually applied.An environmental engineer is evaluating an option to construct a secondary containment structure around a hydrocarbon processing unit. The first level of containment cost a total of $9 million, and the second levee is expected to have the same cost. The first level of containment is expected to have a reliability of 0.94, and the second level will function as an independent parallel component in the hydrocarbon spill prevention system. If the damages avoided by preventing a hydrocarbon spill are $150 million, what is the benefit-cost ratio of constructing a redundant containment structure?1. In the initial assessment of potential disposal sites, it is important to project the extent of the waste diversion that is likely to occur in the future and determine the impact of that diversion on the quantity and condition of the residual materials to be disposed of. TRUE FALSE
- A mass haul diagram developed for a section of a road construction project is shown below. 1000 800 600 400 200 200 400 600 800 1000 -200 -400 -600 -800 -1000 Distance along centerline (m) For this roadway section, determine the following values: i. The total cut volume m3 ii. The total fill volume m3 iii. The total waste volume m3 iv. The total borrow volume m3 Cumulative volume (BCM)19. Shown below is a mass haul diagram. Determine the free haul volume. a) 1000 m³ c) 2000 m² b) 2500 m² d) 4500 m² 20. Determine a) 1000 m² the volume of waste in item 19. a) 1000 m² b) 2500 m² c) 2000 m² d) 4500 m³1. Why is stormwater runoff a problem? 2. What is the importance of having a proper storm drainage system? 3. How does rainwater harvesting contribute to the sustainability of the building or development? 4. What are the benefits of Rainwater Harvesting? 5. Enumerate the advantages and disadvantages of the three (3) Major Systems of collecting stormwater. You may put this on a table.
- Q2/ Consider Table below summarizing the details of a project and determine the following Activity 1-2 1-3 2-4 3-5 4-9 5-6 5-7 6-8 7-8 8-10 9-10 10-11 4-6 6 2 6 4 2 4 5 1 2 2 1 2 0 9 4 8 7 7 9 2 3 4 8 10 12 9 11 4 5 5 (To) (Tm) (Tp) 15 2/3 6 . 4 6 3 5 0 0 Please I want the correct solution as soon 1-Construct the project network. as possible, my friend. Thank you 2-Find the critical path and the expected project completion time. 3- What is the probability of completing the project on the week 33?Tailings storage facilities are the main mine-related risk to public health & the environment. A - What are the main water-induced failure mechanisms of tailings dams? List 4 B - What can be done to reduce the risk of failure? Identify two different approachesAssume that you are a member of the team assigned to design a solid waste land fill. What data willyou need to be able to design the land fill ? Write down them and explain briefly for what purpose thatdata will be used.