Construction Materials, Methods and Techniques (MindTap Course List)
4th Edition
ISBN: 9781305086272
Author: William P. Spence, Eva Kultermann
Publisher: Cengage Learning
expand_more
expand_more
format_list_bulleted
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by stepSolved in 2 steps with 2 images
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- GIVE 10 DISADVANTAGES OF USING HOLLOW BLCOKS.arrow_forwardThe total length of exterior walls of a residential building is 650 lf. The 8-foot long 2x4 studs are spaced 16 in. OC or less. The drawing of the building shows there are 20 corners requiring three studs. Studs are installed on single 2x4 bottom sill plates and capped by double 2x4 top plates for the entire length of the walls. Both bottom and top plates are 16-ftlong each. Prepare a list of materials for the wall studs, corner studs, sill plates, and top plates. For each of the materials, show the nominal dimension, number of pieces of each length, the length ofa lumber, and the total linear feet. Estimate the total direct cost and cost per linear foot of wall for furnishing and installing the studs and plates. Assume $0.75/bf for lumber, $30.00/hour carpenters, and $24.00/hr for laborers. Use the average value in Table 12.10 for the labor-hoursarrow_forwardTo be classified as a tile, a unit must have what percentage voids? а. 60 b. >60 c. 25 >90 d. none of thesearrow_forward
- Concrete Hollow Block 200mm H x 400mm Lx 150mm thick per piece and Laying 4 layers x 4 meters excluding the doorway, is reinforced with 10mm diameter steel bars at every 3 layers horizontally and 0.60 meters on center spacing for vertical bars. a) What is the total area of the CHB installed or laid? A=? in square meters b) How many blocks are required? N=? pieces Provide Wastage Factor = 3% in pieces of CHB c) How much mortar or grout is required in CHB laying? In cubic meter d) How many bags of cement is needed if Class B 1:3 Mixture is required? WF-3% No. of 40kg bags e) Find the volume required for the fine aggregate if WF sand = 15%, in cubic meters f) How many pieces of 10mm diameter x 6 meters long rebar must be ordered? In pieces g) What will be the total mass of the reinforcing steel bars, in kilogram? In kilograms Metal anchors to be enbedded in mortar DOOR- FRAMESarrow_forwardway to Determine the required thickness of the concrete base ?arrow_forwardFind all the concrete amount in the foundationarrow_forward
- Submit your question to our 24/7 subject matter experts with Masters and PhDs and get a solution in as fast as 30 minutes* Provide clear and step by step solution Using LRFD, PL400x350 mm base plate, W12x120 column, 500x500 mm pedestal, PDL = 1200 kN and PLL = 800 kN. Use A-50 steel and concrete fc’ = 30 MPa. Determine the required base plate thickness.arrow_forwardSCC and Plain Concrete What is slag and why do we use itarrow_forwardyout dy) I References Font 11 Mailings Review View Paragraph 2 AaBbCcDc AaBbCcDc AaBbC AaBbcc AaB AaBbCc. AaBbCcL 1 Normal 1 No Spaci... Heading 1 Heading 2 Title Subtitle Subtle Em Styles Determine the approximate proportion of the dry cement mortar required for brick work with bricks of nominal size] 19*9*9 cm, with 18% extra for frog filling and wastage is. (assume 1 m^3 wet mortar = 1.3 m^3 of dry mortar)arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Construction Materials, Methods and Techniques (M...Civil EngineeringISBN:9781305086272Author:William P. Spence, Eva KultermannPublisher:Cengage LearningFundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,Architectural Drafting and Design (MindTap Course...Civil EngineeringISBN:9781285165738Author:Alan Jefferis, David A. Madsen, David P. MadsenPublisher:Cengage Learning
Construction Materials, Methods and Techniques (M...
Civil Engineering
ISBN:9781305086272
Author:William P. Spence, Eva Kultermann
Publisher:Cengage Learning
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning