Describe the two methods of pricing equipment transportation expenses.
Q: The network of a small construction project awarded to a contractor is shown in the following…
A:
Q: What discount rate should a corporation use in a life-cycle costing study when investing funds that…
A: This question deals with a corporation use in a life-cycle costing study when investing funds that…
Q: Uusing the indices proved below compute the estimate of a house having 65,000 m2 of floor area, the…
A: Given, Cost index for Delhi = 1.20 Cost index for Agra = 1.14
Q: ________ The calculation of fringe benefits is based ongross pay, whereas FICA is based on…
A: Answer: "The calculation of fringe benefits is based ongross pay, whereas FICA is based on…
Q: An investor is considering buying some land for $100,000 and constructing an office building on it.…
A: total cost of building A = 100,000+500,000 = 600,000 revenue from building A = 200,000+(70,000 x 20)…
Q: Determine the relationship between unit cost and size for the project data shown to estimate the…
A: Tabulate the unit cost data for each project to find the linear relationship between the cost and…
Q: What ten questions should be considered regarding equipment rental rates?
A: When obtaining rental equipment rates to be use in construction estimate pricing. It is essential to…
Q: 2. f yu were asked to define transportation, what would you say? Provide three examples to…
A: As per the guidelines provided by Bartleby, in case of multiple questions , I have to answer only…
Q: • 1 You are planning to build a new home with approximately 2,000–2,500 gross square feet of living…
A:
Q: Describe the four types of transportation activities that areoutsourced
A: The four types of transportation activities that are outsourced:- Transportation Based Third Party…
Q: Also called as cost - benefit ratio Income Return Ratio Profitability Index
A: Answer - Profitability Index Option b
Q: If BCWP is 320 $ and the ACWP is 500$ then you are probably: Select one: O a. On Budget O b. Under…
A:
Q: Calculate the ownership cost per hour for a dump truck powered by a 120-hp gasoline engine based on…
A:
Q: 2) The Company purchased a lot for P250k on which they will construct a building with 3 estimates…
A:
Q: A large manufacturer uses two factors to decide whether to use truck or rail for movement of its…
A: Given Data: U = 5C + 10T, where C is cost ($/ton) and T is time (hours) For Truck firm: time=16…
Q: Appreciate the role of user charges in funding transportation initiatives
A: Transportation engineering, as rehearsed by civil engineers, fundamentally includes arranging, plan,…
Q: A savings and loan offer a 5.25% rate per annum compound daily over 365 days per year. What is the…
A: Rate of interest = 5.25 % per annum compounded daily over 365 days/year r = 0.0525
Q: 2, Calculate the ownership cost per hour for a dump truck powered by a 120-hp gasoline engine based…
A:
Q: Buses are to be charted for an excursion. The bus company charges $20.00 per ticket if not more than…
A: it is a basic maxima and minima question
Q: How is maximum daily and maximum hourly demand per day calculated (peak demand)?
A: Domestic Water Demand: It is the amount of water required in order to satisfy domestic needs, like…
Q: The network of a small construction project awarded to a contractor is shown in the following…
A:
Q: The following eight activities constitute an overall bar chart portrayal of a 4-month project. After…
A: ACWP=$8000BCWP=2000+1000+2000+70002=$8500BCWS=2000+1000+50%of 6000+50%of 2000 +25%of 7000=%8750
Q: C. Use the time and location indices shown above to estimate the cost of a building that contains…
A: For estimating the cost of the building we can use the formula given below Estimated cost=Previous…
Q: How can the problems caused due to mobilization payment be solved?
A: Mobilization payments are the payments provided to a construction contractor or a supplier of…
Q: Question 5: A crawler bulldozer aving the information shown below; the contractor intends to rent…
A:
Q: Q1. A residential building includes 20 apartments for leasing located in two floors: ground and…
A: Let the number of apartments in the ground floor be G and number of apartments in the first floor be…
Q: C) How will the level of revenue be determined economically? Clarify this statement?
A: Brief concept- Revenue- It is the sum of money that any firm obtains after selling its products in…
Q: START FINISH Activity Normal Time Crash Time Normal Cost Crash Cost (Weeks) (Million P) (Million P)…
A: It is difficult to find the critical path and total duration from this activity diagram. First of…
Q: The total cost when the demand that is maximized profit is $1800, fixed cost (CF) = $5500, Cv =…
A: Given data: Maximized profit (P) = 1800$ Fixed Cost (CF) = 5500$ CV = 15.5$
Q: c) Briefly discuss the key items that must be considered in estimating the hourly rate fo r…
A: Estimation of hourly rate for construction plant
Q: across the bridge. b. If a toll of 25 pesos is added, what is the volume across the bridge? c. A…
A:
Q: Discuss the cost structure of rail transport
A: We have to asked cost structure of rail transport is the calculation of the variable and fixed costs…
Q: What is the meaning of ( EIS, EA, CE ) and what is the difference between them in transportation…
A: The definitions of EIS, EA, CE are:
Q: Describe in detail the bidding process for government infrastructure projects,
A: Here is the most Common using Bidding process
Q: Q4/ The table below shows the duration and direct costs for the activities of a construction…
A:
Q: For the same problem, if the owner has the following resources constraints of 7 resources/day: Daily…
A: To find duration of activities using resource allocation
Q: method and 15% interest rate, determine the minimum number of days per year that each truck must…
A: Salvage value: - It is a value of an object at the end of its useful life or value of damaged…
Q: Compute the initial value of the money
A: SIMPLE INTEREST:
Q: A project with the following activities is given. The direct cost of the project is "C" and the…
A: Project crashing is a process in which the project duration is reduced or compressed by means of…
Q: WSIB premiums are paid by:
A: Hi! Thank you for the question As per the honor code, We’ll answer one question since the exact one…
Q: A contractor gets a bill for $545 for supplies purchased. The bill is notated1.5% 10/Net 30. What…
A: Given values: List price bill = $ 545 Bill notated = 1.5% 10/Net 30 Bill paid within 10 days
Q: You are managing a project which is into six months of its execution. You are now reviewing the…
A: Calculate Earned value of each activity Earned value = completion % x planned value Activity A…
Q: How are the pay quantities for pipelines are determined?
A: To pay for the quantities for Pipelines are determined by calculating the Pipeline measurements…
Q: A involves the determination of the value of a specified variable that will make the revenues…
A: A multiple choice questions is given and it has been asked to choose appropriate option. Please…
Q: Delay claims fall into which three categories?
A: The construction claim is defined as a claim against the owner, by the contractor, or a claim…
Q: You are the CM for ABC Construction company, and you are preparing a Status Report document for your…
A: We will use formula of Schedule performance index and Schedule Variation index.
Q: New tires are purchased for service trucks. Each service truck is given 4 tiresand a spare. If there…
A: Service truck are heavily used for heavy work such as railway maintenance, airports, and mining…
Q: An example of variable cost O a. Administrative costs O b. License costs O c. Labour costs O d. All…
A: Ans D - All of the above Since a variable cost is defined as cost that changes in proportion to…
Describe the two methods of pricing equipment transportation expenses.
Step by step
Solved in 2 steps
- For a typical transportation project, what are the agency cost items and user cost items?Financial data of a highway construction project is given . You are questioned to develop a plan such that both cost and project duration would be at optimum status. A,C,E,H are the activities that have no float. Office rent $ 50/- per day Bills $ 30/- per day Miscellaneous expenses $78/- per dayThe total cost when the demand that is maximized profit is $1800, fixed cost (CF) = $5500, Cv = $15.5: O a. TC=$550 O b. TC=$5515.5 O c. TC=$33400 O d. TC=$15.5
- Which of the following are included when estimating equipment costs? Mobilization Idel time Insurance All of the above2.Nine men agreed to rent a van for their trip to Sagada. Three of them backed out at the last minute. As a result, each of the remaining men had to pay P50 more than they had expected to pay. How much was the rental of the van?Please answer asap. With Lear and complete solutions. Thank you
- A project with the following activities is given. The direct cost of the project is "C" and the indirect cost of the project is $5 per day. If you crash a schedule, you add to project's direct cost (e.g., if you crash activitiy B for 1 day then the total direct cost would be C + $2) but save on project's indirect costs ($5 per day) by paying less due to a crashed schedule which is shorter than the original one. You are being asked to reduce project duration to 19 days in the most economical way. In your answers explain: 1. the steps that you would take to do so and why 2. total direct cost of the project Activity Preceding Activity Normal Time (day) Crash Time (day) Cost Slope A 2 2 3 В 4 2 2 C A 3 2 3 D А, В 6. 1 E 7 4 4 C 3 G 4 2 3 H D, E 5 4 5 F, G I, G 3 4 6. 1 K 2 2There is a building that has 15 floors, a grocery store and a gym, the rent for the floors 1-5 is 3000 per month, for the floors 6-10 is 4000 per month, for the floors 11-15 is 5000 per month, for the grocery store the rent is 6000 per month, for the gym the rent is 6500 per month, the effective gross income is 12%, the operating expense is 8% and the capital expedinture is 6% and the annual market increase is 4%. Find the value of the building and the net operating income?2) The Company purchased a lot for P250k on which they will construct a building with 3 estimates tabulated below. Determine which alterative should be selected using Benefit Cost Analysis at 10%: Building Height 4 stories 8 stories 12 stories Cost of Building P650k P1.5M P2.4M Resale Value at the end of 30 350k 720k 1M yrs Net Annual Income 120k 250k 340k
- Draw class diagram using Rational rose software in payment systemBuses are to be charted for an excursion. The bus company charges $20.00 per ticket if not more than 200 passengers go with the trip. However, the company agrees to reduce the price of every ticket $0.05 for each passenger in excess of 200 passengers. What number of passengers will produce the maximum gross income?Topic: Quantity surveying Material pricing needs to include shipping costs, sales tax, and storage costs. true or false The potential loss because of damage to the insured equipment is a function of the value of the equipment True or false If the life of the tires and wear items is one year or less, the hourly cost is determined by multiplying the cost of the tires or wear items by their life. true or false