Define in your own words the construction cost estimate and list and describe the different types of construction estimates.
Q: A triangular channel (n=0.016), is to carry water at a flow rate of 222 liters/sec. The slope of the…
A:
Q: The pump in the figure discharges water at 45 lit/sec. Neglecting losses and elevation changes.…
A:
Q: At node A, water enters at a rate of 275li/s and flows out at 5 nodes with different rates namely:…
A: Solution At node A , Q = 275 l/s = 0.275 m3/s At node B , Q = 35 l/s = 0.035 m3/s At node C , Q = 80…
Q: 1. A proposed road bend along a highway construction project is to be laid out such that it will be…
A: Circular curve Intersecting straight lines are joined with circular curves (or tangents). The…
Q: Given: XW = 48.85 ft and weight of W = 652 lb, 0 = 36° Solve for the tension in XW connected to W in…
A:
Q: O. Determine the mean runoff flow in cfs from a drainage area of 175 acres using the English…
A: Inglis formula is a empirical formula Where A is area in km^2 Q discharge in m^3/sec
Q: Through a shrink-fit process, a rigid solid cylinder of radius ry+o is to be inserted into the…
A: Given: Plain stress conditions, the Outer surface is stress-free
Q: 513. A rectangular steel beam, 2 in. wide by 3 in. deep, is loaded as shown in Fig. P-513. Determine…
A: Determine the magnitude and location of the maximum flexural stress.
Q: 2. Determine the spacing of vertical stirrups near the left support of the beam loaded as shown in…
A: given , bw=290mm d=560mm f'c=24MPa Fyt=275Mpa PD=80kN PL=110kN WD=20kN/m WL=28kn/m To determine The…
Q: 1. Determine the depth in m of the economical trapezoidal brick lined channel having a discharge of…
A:
Q: Complete Solution Please. 5 DECIMALS Find the tangential deviation of B with respect to A in…
A: Given data: EI=60×106 lb-in2EI=60×106 10-3 k-ft2144EI=12503 k.ft2
Q: A 800ft vertical curve has its PVI at elevation 304.25ft. The initial and final grades are 2.4% and…
A: L = 800ft YPVI = 304.25ft n1= 2.4% n2= -2.2% It has been asked in the question to determine the…
Q: 65. A cantilever beam of rectangular cross-section is subjected to a load W at its free end. If…
A:
Q: 180 lb/ft 1350 lb-ft A /o IE B + 9 ft + 9 ft 9 ft + 9 ft 4 6 |
A:
Q: Given: X = 100 kg; Y = 150 kg %3D %3D Solve for the acceleration of block X in m/s² for Case 2.…
A:
Q: b =250 mm h=560 5 - Ø 20mm
A:
Q: rmine the slope if Darcy-Weisbach constant is 0.011 (final answer shall be in fraction i.e. 1/50)
A: For v channel :slant length of the channel l=Depthcosθ2l=3cos40=3.7082mWetted Area…
Q: 7. What is the psychological widening of a pavement on horizontal curve of radius 230m for ruling…
A: Given data- Radius R=230 mRuling speed V=80 kmph
Q: Two intersecting tangents have azimuths 203°45' and 229°57' respectively. The stationing of the…
A: Given, Azimuths =203°45' and 229°57' Point of curvature P.C. =11+110.71 and 11+025.32
Q: 3. Medium lubricating oil (sg=0.85) is pumped through 360m of horizontal 75mm pipe at the rate of…
A:
Q: Determine the discharge in MLD of a 2800 mm gravity flow concrete aqueduct with a hydraulic gradient…
A:
Q: What is the soil type based on the USCS classification cent paing Sieve#4, 52% Per nt pass g…
A: Step1:Look at the % passing through sieve no 200=10<50%⇒COARSE GRAINED SOIL
Q: 3. A PAL on one of its scheduled trip is to fly from Manila (14°36'N, 131°45'E) to Sydney, Australia…
A: 1 degree = 111km. N2 - N1 = (14°36' - 10°16' )*111 = 4°20' * 111 =…
Q: A vertical symmetrical sag curve has a descending grade of - 4.2% and an ascending grade of +3%…
A:
Q: Question 12. Determine the net area (An) and effective net area (Ae) for the channel tension member…
A: Given Data:Bolt Diameter = 34 in.Section =C6×13A36Area =3.83in2d=6inbf=2.157in
Q: Tinet 2m B 8.
A:
Q: Problem II. Refer to the cross section shown below. h 30° a) Derive an expression of the maximum…
A: Note: Hi! Thank you for the question As per the honour code, We’ll answer the first question since…
Q: Vin = 4 m/s %3D 0.2 in Air Water 3 т h 1 in 2 m How long will it take for the water level to reach 1…
A:
Q: 7. From the Crest Vertical Curve Chart (attached) determine the Length of the Vertic Curve for a…
A: FOR V=60mph S=475fr So USing graph
Q: 13. A baseball is popped straight up into the air and has a hang-time of 6.25 s. Determine the…
A:
Q: It is required to design a collector road pavement in an urban area composed of 3 layers with…
A: Solution- The materials used in the pavement construction imply that this is a flexible pavement.…
Q: Interpret the objectives of life-cycle costing and discuss the importance of determining building’s…
A: Solution- Objective- The goal of life lifecycle costing would be to minimize life - cycle cost by…
Q: A soil sample is collected under the ground water level, what is the void ratio if given the…
A: Asked: To compute the void ratio of the soil. Given: Specific gravity of the soil solids (Gs) =…
Q: soil sample is collected under the ground wate io if given the specific gravity is 2.7 and moistu…
A: Soil sample collected under ground water level Therefore it is in condition of full saturation S =1…
Q: For a V-shaped concrete lined channel with total included angle of 80°, and a depth of 3 m if the…
A:
Q: -Problem XYZ. A steel tape is 100 m long at a standard pull of 65 N. Compute the pull correction in…
A:
Q: Horizontal loads of P/2 and P = 87 kN are applied to a four bay, three storey framed %3D structure…
A:
Q: ngineering ordinates at 1-hr intervals of ograph are 15, 33, 56, 72, 44, mm. Determine the direct…
A: Given that 1 hr unit hydrograph and 1 hr intervals of ordinates R 1 = 2 mm R 2 = 1 mm R 3 = 1.5 mm
Q: Two disks of the same material are attached to a shaft as shown. Disk A is of radius r and has a…
A: Given -
Q: find area
A: Given: Station X (Easting) Y (Northing) 1 0 0 2 50 53 3 102 109 4 156 168 5 212 230 6…
Q: An unsaturated soil sample with the dimensions of 0.1 m x 0.1 m x 0.1 m has a weight = 0.02 kN and…
A: The value given in the question are as follows: Side of soil sample cube(a)=0.1 m Weight of soil…
Q: Provide 7 pros and cons of dating an engineer
A: in this question 7 pros and cons of dating an engineer is asked
Q: A plane leaves the place (14°36'N ,121° 95' €) at a course S 30° W. Ip the plane pliec at speeds OF…
A: In WCB Course = 30° + 180° = 210°
Q: A soil sample is collected under the ground water level, what is the void ratio if given the…
A:
Q: QI Design the slabs shown in Fig (1), which is supported on rigid beams. The applied lcads are the…
A: Solution: Given: DL = 3.5 kN/m2 LL = 3.5 kN/m2 Span = 3 m fc = 28 MPa fy = 414 MPa γc = 24 kN/m3
Q: Compute the shear and moment diagram of the given figure below. Show complete values in the…
A:
Q: L= 450 feet g1 =-3.00% 92 = +1.50% VPI station = 66 + 50 VPI elevation = 560.00 feet Station giX (in…
A: BVCSTATION=VPISTA-L2BVCSTATION=6650-4502=64+25BVCELV=PVIELV-g1L2BVCelv=560+0.03×4502BVCelv=566.75ft
Q: . Draw the shear and moment diagram of the loaded beam shown in the figure. Determine the Vmax and…
A:
Q: Q-14: A soil has a void ratio of 0.70, degree of saturation 50% and G =2.7. Find the water content,…
A:
Q: Determine the operational service level of a basic highway segment with the characteristics…
A: Given, PHF = 0.89 AADT = 108920 vpd
Define in your own words the construction cost estimate and list and describe the different types of construction estimates.
Step by step
Solved in 2 steps
- The procurement statement of work should be as detailed as necessary for the type of project and should therefore containing technical requirements, business requirements, tasks, performance standards, deliverables (outputs), and evaluation criteria to meet service needs.Your organization would like to contract construction works for extension of office space. Write an effective Statement of Work to guide the contractors.Describe the process regarding the 6 phases of a construction project 1.Study and report phase 2.Preliminary design phase 3.Final design phase 4.Bidding or Negotiating phase 5.Construction phase 6.Operation phaseList the four temporary site services that are usually required on a construction project, and describe how each service is priced.
- Give the list of possible tasks that might be offered to the resident project representative during the contractor's payment request?What are the payment provisions under the construction act?Prepare an organizational chart depicting the construction process. Identify the parties involved, their functions, responsibilities, and connections with each other.