cy Response Teams. th Manager has asked you to arrange the evacu begin, identify and characterize the various ha he plant's evacuation strategy and procedures u

Elements Of Electromagnetics
7th Edition
ISBN:9780190698614
Author:Sadiku, Matthew N. O.
Publisher:Sadiku, Matthew N. O.
ChapterMA: Math Assessment
Section: Chapter Questions
Problem 1.1MA
icon
Related questions
icon
Concept explainers
Question
Total Area = 27,000 m2
1.812 m?
1.685 m2
2 Building
Football Field
SHOP
6.217 m
884 m2
12.351 m
CANTEEN
SEC
Mait Blailding
1.850 m2
PARKING
Lawn
2,201 m?
Manufacturers are required to have an On-Site Emergency Plan under the Occupational Safety
and Health (Control of Industrial Major Accident Hazards) Regulation 1996, which necessitates the
formation of several Emergency Response Teams.
Your Safety and Health Manager has asked you to arrange the evacuation strategy in the event
of a fire or other disaster. To begin, identify and characterize the various hazards that could endanger
the personnel. Second, build the plant's evacuation strategy and procedures utilizing the generic phases
in the design process and the engineering design concept to reduce or eliminate hazards. With reference
to the drawing above, a schematic of an evacuation floor plan is necessary to highlight all the major
aspects. When delivering your answer, make sure to include suitable, realistic assumptions as well as
creative thinking.
Transcribed Image Text:Total Area = 27,000 m2 1.812 m? 1.685 m2 2 Building Football Field SHOP 6.217 m 884 m2 12.351 m CANTEEN SEC Mait Blailding 1.850 m2 PARKING Lawn 2,201 m? Manufacturers are required to have an On-Site Emergency Plan under the Occupational Safety and Health (Control of Industrial Major Accident Hazards) Regulation 1996, which necessitates the formation of several Emergency Response Teams. Your Safety and Health Manager has asked you to arrange the evacuation strategy in the event of a fire or other disaster. To begin, identify and characterize the various hazards that could endanger the personnel. Second, build the plant's evacuation strategy and procedures utilizing the generic phases in the design process and the engineering design concept to reduce or eliminate hazards. With reference to the drawing above, a schematic of an evacuation floor plan is necessary to highlight all the major aspects. When delivering your answer, make sure to include suitable, realistic assumptions as well as creative thinking.
Expert Solution
steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
General Safety Guidelines
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Elements Of Electromagnetics
Elements Of Electromagnetics
Mechanical Engineering
ISBN:
9780190698614
Author:
Sadiku, Matthew N. O.
Publisher:
Oxford University Press
Mechanics of Materials (10th Edition)
Mechanics of Materials (10th Edition)
Mechanical Engineering
ISBN:
9780134319650
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Thermodynamics: An Engineering Approach
Thermodynamics: An Engineering Approach
Mechanical Engineering
ISBN:
9781259822674
Author:
Yunus A. Cengel Dr., Michael A. Boles
Publisher:
McGraw-Hill Education
Control Systems Engineering
Control Systems Engineering
Mechanical Engineering
ISBN:
9781118170519
Author:
Norman S. Nise
Publisher:
WILEY
Mechanics of Materials (MindTap Course List)
Mechanics of Materials (MindTap Course List)
Mechanical Engineering
ISBN:
9781337093347
Author:
Barry J. Goodno, James M. Gere
Publisher:
Cengage Learning
Engineering Mechanics: Statics
Engineering Mechanics: Statics
Mechanical Engineering
ISBN:
9781118807330
Author:
James L. Meriam, L. G. Kraige, J. N. Bolton
Publisher:
WILEY