belt conveyor is required to deliver crushed limestone having a bulk density of 75 lb/cu ft at the rate of 200 tons/hr. The conveyor is to be 200 ft between center of pulleys with a rise of 25 ft. The largest lumps are 4 in. and constitute 15% of the total. The conveyor will discharge over the end. For a belt speed of 200 fpm, what is the minimum width of belt that can be used? Calculate the horse

Solid Waste Engineering
3rd Edition
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Worrell, William A.
Chapter5: Separation Processes
Section: Chapter Questions
Problem 5.14P: Two materials, A and B, are to be separated using two unit operations, 1 and 2. The feed has 10...
icon
Related questions
icon
Concept explainers
Question

A belt conveyor is required to deliver crushed limestone having a bulk density of 75 lb/cu ft at the rate of 200 tons/hr. The conveyor is to be 200 ft between center of pulleys with a rise of 25 ft. The largest lumps are 4 in. and constitute 15% of the total. The conveyor will discharge over the end. For a belt speed of 200 fpm, what is the minimum width of belt that can be used? Calculate the horsepower for the drive motor. 

Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Pricing concrete work
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Solid Waste Engineering
Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,