An embankment for a highway 30 m wide and 1.5 m thick is to be constructed from sandy soil, trucked in from a borrow pit. The water content of the sandy soil in the borrow pit is 15% and its void ratio is 0.69. Specifications require the embankment to compact to dry weight of 18 kN/m3. The length of the embankment is 1 km. What is the number of 10 m³ of truckloads of sandy soil required to construct the embankment? Assume that Gs=2.7. 617 O 1584 O 5169 O 8671
Q: Compute the vertical pressure at a depth of 6 m below the ground surface at the following locations:…
A: Given data Top width = 8 m, height = 4 m, side slopes= I V : 1.5 Hor unit weight of soil, γ=21kN/m3…
Q: An embankment with a total volume of 50000cu.m is to be constructed as a part of highway project.…
A:
Q: The concrete dam shown is very long in the direction normal to the figure. The permeable soil under…
A: It is asked to find the flow rate under the dam.
Q: 31 5-13 A long embankment with the shown cross section is proposed at the site of a road development…
A: Cross section area of the given ambankment A=50+102×12=360 m2volume of the embankment V=…
Q: concept of slope stability in fine soil the factor that affect the stability and the causes of…
A: Concept of slope stability Slope stability is the potential of soil covered slopes to withstand and…
Q: PROBLEM No. 2 Void Ratio Soil excavated from a borrow area is being used to construct an embankment.…
A:
Q: An embankment for road traffic is required to be constructed with the following dimensions :Top…
A: Solution : From above question we get,
Q: A permeable soil layer is underlain by an impervious soil layer. The coefficient of permeability of…
A:
Q: The velocity of a trapezoidal canal with a bottom width of 3.2 m and side slopes of 3H:2V is 2.2…
A: To Determine a. Flow rate, Q b. Roughness coefficient, n c. Shearing stress at the boundary of the…
Q: An embankment consists of clay fill for which c′ = 25 kN/m2 and φ = 27° (from consolidated undrained…
A:
Q: An embankment is to be constructed with a granular soil (bulk unit weight = 20 kN/m³) on a saturated…
A:
Q: Problem (4.9): An embankment of (3m) high is to be constructed as shown in the figure below. If the…
A: Solution: Considering the Diagram 1. Vertical Stress at A: By considering the FigureσzA=σz1+σz2Left…
Q: A dam shown in figure has water 2.7 m high on the vertical upstream side. If unit weight of concrete…
A: Unit weight of concrete = 23.5 kN/m3
Q: Find the swell of a soil that weighs 1750 kg/m3 in its natural state and 1350 kg/m3after excavation.…
A:
Q: An earth dam is proposed for a site consisting of a homogeneous stiff clay, as shown in the Fig.…
A: Earthfill dam, also known as earth dam or embankment dam, is a dam constructed by compacting…
Q: A canal having side slopes 1: 1 is proposed to be constructed in a cohesive soil to a depth of 10 m…
A:
Q: A concrete dam retaining water is shown in the figure. If the specific weight of the concrete is…
A: Given a concrete dam retaining water having specific weight of the concrete 23.5 kN/m3.
Q: Example 3: A flow net for flow around a single row of sheet piles in a permeable soil layer is shown…
A: given data K=5×10-3cm/secfrom images of question total head loss=5.6-2.2=3.4mno of drops Nd=6no of…
Q: The following is a sketch of the proposed embankment, calculate the addition of vertical stress…
A:
Q: the number of trips of each truck
A: Unit weight: -It is defined as the weight per unit volume of a given substance and also known as…
Q: 3. Refer to figure shown. Determine H. H '6 m . 4.1 m Saturated clay Ysat=17.5 kN/m³ Sand: Y = 16…
A:
Q: A 4 m high embankment with a top width of 5 m and side slopes of 1:1, has to be constructed by…
A:
Q: 5) According to Lacey's theory, the silt- carrying capacity of a channel varies as (5/2) power of…
A:
Q: A highway embankment is shown in the figure below. If the unit weight of the soil in the embankment…
A: Given: The unit weight of the soil is 17.5 kN/m3. Consider the figure,
Q: 1. A wide fill will apply a uniform pressure of 100 kN/m2 to the surface of a soil profile…
A:
Q: A 4 m high embankment with a top width of 5 m and side slopes of 1:1, has to be constructed by…
A: GIVEN: A 4 m high embankment with a top width of 5 m and side slopes of 1:1, has to be constructed…
Q: A concrete dam shown impounds water with a depth of 6 m. If the unit weight of concrete is 23.5…
A:
Q: 2.1.Q.1: Determine the total vertical stress, pore water pressure, and the effective stress of the…
A:
Q: The hydraulic gradient for quicksand condition is equal to 1.25 with a void ratio of 0.42. The moist…
A:
Q: A concrete dam retaining water is shown in the picture. If the specific weight of concrete is 23.5…
A: Given data Unit weight Cross sectional area We will design for unit width
Q: A dam 4 m wide at the top, 16 m at the bottom, and 24 m high, has water 18 m deep on its vertical…
A:
Q: An embankment consists of clay fill for which c=25 kPa and angle of internal friction is 260 9from…
A:
Q: A 10 m clay stratum is overlaying a rock stratum. If water table is at the ground surface, calculate…
A:
Q: An embankment is being built of a soil whose unit weight is equal to 18 kN/m³. The pore pressure…
A: given values- Pore pressure parameters-A=0.6B=0.8change in height 6 m to 9 m
Q: A 4 m high embankment with a top width of 5 m and side slopes of 1:1, has to be constructed by…
A:
Q: An embankment for road traffic is required to be constructed with the following dimensions : Top…
A: Solution: q= unit weight x depth=21x4 =84 kN/m2 Vertical stress= q x Iz z=6m a=8m b=20m with 1V:1.5H…
Q: 7. Calculate the average permeability of a formation that consists of four beds in series, assuming:…
A:
Q: A 3 m high embankment is to be constructed as shown in the figure. If the unit weight of soil used…
A:
Q: A 3 m high embankment is to be constructed as shown in the figure. If the unit weight of soil used…
A: Given data A 3m high embankment unit weight of soil used in embankment = 19KN/m3 we have to…
Q: The flow net around a sheet pile wall is shown in the sketch. The properties of the soil are:…
A:
Q: 5. An embankment for a highway will be constructed from a soil. To construct the embankment, the…
A: Given: The bulk unit weight is γ=16 kN/m3. The total weight of the soil from the borrow pit is…
Q: As shown in the figure given below, a 5 m thick layer of silty sand overlies a clay layer 3 m in…
A:
Q: For the trial slip circle shown in Figure Q4, calculate the factor of safety. Weight of soil = 346…
A: Hello dear this is the solution of your problem The answer is found to be Factor of safety=1.1445…
Q: An embankment consists of clay fill for which c=25 kPa and angle of internal friction is 260 9from…
A: Given:- C=25 kPaϕ=26oΥ=18.64 KN/m3Z=20 m To find:- Stress at a depth of 20 m Free body diagram
Q: Q.01 0.02 0.04 0 06 0.10 0.2 0.50 L 04 0.6 1.0 2 3456 8100 0.60 12.0 m 18.0m 19.0m 045 0.45 6.0 m 0…
A: Solution:- We know that the equation obtained by Boussinesq for computing vertical stress for…
Q: Problem 5.10. A rill channel is observed at two locations during a storm, 20 and 60 m from the top…
A:
Q: It is required to deepen a lake to 1.5 m over an area of 25 m x 25 m. There is water to a depth of…
A: ASKED: To determine: in situ water content of the soil at the bottom of the lake height of…
Q: what is the difference between confined and unconfined aquifer?
A: Aquifer:- Aquifer is a water bearing formation of the earth. It holds the water as well as yields it…
Q: B- Calculate the average permeability of a formation that consists of four beds in series, assuming:…
A:
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 3 images
- An embankment for a highway 30 m wide and 1.5 m thick is to be constructed from sandy soil, trucked in from a borrow pit. The water content of the sandy soil in the borrow pit is 17% and its void ratio is 0.73. Specifications require the embankment to compact to dry unit weight of 17.5 kN/m3. The length of the embankment is 1 km. What is the weight (in kN) of water per truck load of sandy soil? Assume that Gs=2.76 and total volume of soil per truckload is 7 m³. O 23.5 kN O 18.6 kN O 25.0 kN O 16.5 kN5. An embankment for a highway will be constructed from a soil. To construct the embankment, the total weight of the soil from the borrow pit is 500000 kN. The water content of the soil in the borrow area of 14% and the bulk unit weight is 16 kN/m³. The soil in the embankment will be compacted to a dry unit weight of 17.5 kN/m³. The specific gravity of the sandy soil is 2.67. (a) Determine the volume and weight of the soil in the embankment. (b) If the soil in the embankment becomes saturated after construction, what is the new water content of the soil?An embankment for a highway 35 m long and 1.6 m in compacted thickness is to be constructed from a sandy soil trucked from a borrow pit. The water content of the sandy soil in the borrow pit is 15% and its void ratio is 0.69. The specification requires the embankment to be compacted to a dry unit weight of 18 KN/m³, specific gravity of soil is 2.7. For a one-kilometer length of embankment, compute: a) Volume of the borrow pit soil required to construct the embankment| b) Determine the weight of water per truck load of sandy soil, if the capacity of a one truck load is 10 m3.
- A 4 m high embankment with a top width of 5 m and side slopes of 1:1, has to be constructed by compacting soil from a nearby borrow pit. The unit weight and natural moisture content of the soil are 1.8 tons/m3 and 8% respectively. Determine the quantity of water to be added to it for every kilometer of finished embankment, if the required dry density and moisture content of the embankment soil be 1.82 g/cm3 and 18%. Given G= 2.70.An embankment is to be constructed for a certain project, as such filling materials are required to be excavated from borrow pits. The moist unit weight of the undisturbed soil is 20 kN/m3 and its water content is 10%. In order to build a 5 m high embankment with top width 2 m and side slopes 1:1, estimate the quantity of earth required to be excavated per meter length of embankment. The dry unit weight required in the embankment is 17 kN/m3 with a moisture content of 12%. Assume the specific gravity of solids as 2.65.4. An embankment for a highway will be constructed from a soil. The total volume of the embankment is 20,000 m³. The soil in the embankment will be compacted to a dry unit weight of 18 kN/m³. The sandy soil will be obtained from a borrow pit. The water content of the soil in the borrow area of 16% and the bulk unit weight is 17.5 kN/m³. The specific gravity of the sandy soil is 2.7. (a) Determine the volume and weight of the soil from the borrow pit required to construct the embankment. (b) If the soil in the embankment becomes saturated after construction, what is the new water content of the soil?
- Situation 5: 12. 13. 14. 15. An embankment for a highway 30 m wide and 1.3 m in compacted thickness is to be constructed from a sandy soil trucked from a borrow pit. The water content of the sandy soil in the borrow pit is 17% and its void ratio is 0.75. The specification requires the embankment to be compacted to a dry unit weight of 19 kN/m³. The length of embankment is 3 km. Use G = 2.7. Compute the volume of borrow material required. Solve the total cost of fill if the earth fill from borrow site costs P200/m³ Calculate the volume of borrow material required if the specification requires a void ratio of 0.20. The moist unit weight of 0.00283 m³ of soil is 65 N. The water content is 13% and the specific gravity is 2.73. Solve the volume occupied by the water. The saturated unit weight and the water content in the field are found to be 18.55 kN/m³ and 33%, respectively. Determine the specific gravity of the soil solids.An embankment for a highway 30m wide and 1.5m in a compacted thickness is to be constructed from a sandy soil trucked from a borrow pit. The water content of the sandy soil in the borrow pit is 11% and its void ratio is 0.69. The specification requires dry unit weight of 18 kN/m³, the specific gravity of soil is 2.70. For a 1 km length of embankment, compute a. The weight of soil required to provide embankment. (kN) b. The number of truck required to fill the embankment if the capacity of truck is 10m3 c. The total volume of water in liters for moisture conditioning at degree of saturation of 80% for the required embankment.An embankment for a highway is to be constructed from a soil compacted to a dry unit weight of 18kN/m3. The clay has to be trucked to the site from a borrow pit. The bulk unit weight of the soil in the borrow pit is 17kN/m3 and its natural water content is 12.3%. Calculate the volume of clay from the borrow pit required for 1m3 of embankment. Assume G=2.7.
- An embankment for a highway 30 m wide and 1.3 m in compacted thickness is to be constructed from a sandy soil trucked from a borrow pit. The water content, w, of the sandy soil in the borrow pit is 17% and its void ratio, e, is 0.75. The specification requires the embankment be compacted to a dry unit weight of 19 kN/m^3. Determine, for 3 km length of embankment. Assume Gs = 2.7 a) Compute the volume (m³) of borrow material required b) solve the cost of fill if the earth fill from borrow site costs Pho 150/m³ c) calculate the volume (m³) of borrow material required is the specification required a void ratio of 0.20An embankment for a highway 30 m wide and 1.5 m in compacted thickness is to be constructed from sandy soil trucked from a borrow pit. The water content of the sandy soil in a borrow pit is 15% and its void ratio is 0.69. The swell index is 1.2. The specification requires the embankment to be compacted to a dry unit weight of 18kN/m^3. Determine, for a 1-km length of embankment, the ff; (g) The weight of water per truckload of sandy soil. (h) The degree of saturation of the sandy soil in situ. The dry density of sand with a porosity of 0.387 is 1600 kg/m3. Find the following; (i) The void ratio of the soil. (j) The specific gravity of the soil solids.An embankment for a highway 30 m wide and 1.5 m in compacted thickness is to be constructed from sandy soil trucked from a borrow pit. The water content of the sandy soil in a borrow pit is 15% and its void ratio is 0.69. The swell index is 1.2. The specification requires the embankment to be compacted to a dry unit weight of 18kN/m^3. Determine, for a 1-km length of embankment, the following;(d) Volume of the borrow pit material required considering swell. (e) The number of truckloads of sandy soil required for the construction. The full capacity of each truck is 22.2m3, and local government regulations require a maximum capacity of 90%. (f) The weight of dry soil in one truckload.